BVY-90-071, Forwards Rev 2 to Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)

From kanterella
(Redirected from ML20055H284)
Jump to navigation Jump to search
Forwards Rev 2 to Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)
ML20055H284
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 07/20/1990
From: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BVY-90-071, BVY-90-71, VYV-90-216, NUDOCS 9007260003
Download: ML20055H284 (1)


Text

P, ,

%c ,

jVERMONT YANKEE- 2 l .

NUCLEAR POWER l CORPORATION I BVY 90-071

"~

VYV 90-216 Ferry Road, Brattleboro, VT 053017002

.U k ENGINEERING OFFICE -

bk; '

680 MAIN STREE1

~'

OJ .

Boi. ton. MA 01740 j July 20, 1990 coe>779s75s U.S. Nuclear Regulatory Commission

- -Washington,:D.C.c 20555'

' ' Attention: Document Control Desk f 4

References a) License No. OPR-28 (Docket No. 50-271). .

-Dear Sire e

Subjects- Revision-2 to the Vermont Yankee Training and Qualification. Plan I i The purpose of.this memo is to provide you with Revision 2 to the Vermont

? Yankee Training and Qualification Plan. This revision reflects enhancements y recently made to our. Security Program. These changes were previously incor-

-porateo into our Physical-Security Plan and implementing procedures and the enclosure' reflects the resultant Plan changes.

We have reviewed this revision and have' determined that the changes do not

. decrease the safeguards effectiveness of tne Plan. Therefore, in accordance

-with 10CFR50.54(p), prior NRC approval of this revision is not required.

This-revision to our Training and Qualification Plan is submitted as ,

-Attachment A to=this letter and is considered SAFEGUARDS INFORMATION which is to

~

be withheld from=public disclosure in accordance with-the provistons of 10CFR73.21.'

..,c .

['R. ~

We'have enclosed'our standard Document Custody Form and change Transmittal L >

Form for each enoy of the' Plan revision required by the NRC. Please sign and return;these fe is.

We ' trust viiat the enclosed information is deemed acceptable: howeveri X ;should you has any questions, please contact Mr. John Moriarty, Security E '

1 Supervisor, at our plant site.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION y,

$W "

7 1 Warren P. urphy

"s Senior Vi e Preside , trations

Enclosure:

Attachment A, Revision 2 to the

.y u,, - Hy.T,rainino-and Qualification Plan

$ g4I ' _ .

/' .9007260003 900720

~%r $ ,2M" ~- Y*"?0' I

1 /*UR'ffY8/o IES3