ML17348A566

From kanterella
Jump to navigation Jump to search
Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule.
ML17348A566
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/14/1990
From: Harris K
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-03, GL-89-3, GL-90-07, GL-90-7, L-90-328, NUDOCS 9009250169
Download: ML17348A566 (7)


Text

ACCELERATED DIST BUTION DEMONSTRATlON SYS'I'hM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9009250169 DOC.DATE: 90/09/14 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HARRIS,K.N. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to Generic Ltr 90-07, "Operator Licensing Natl Exam Schedule."

DISTRIBUTION CODE: IE42D COPIES RECEIVED LTR ENCL SIZE:

TITLE: Operator Licensing Examination Reports NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 EDISON,G 1 1 INTERNAL: AEOD/DSP/TPAB 1 1 NRR SHANKMAN,S 1 1 LHFB11 1 1 NRR/DLPQ/LOLB10 1 1 REG ILE 02 1 1 RGN2 FILE 01 1 1 EXTERNAL: NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS'LEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

P.. Box 029100, Miami, FL, 33102-9100

~ ~ ~

SEP > 0 1990 L-90-328 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washingtonr D C 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Generic Letter 90-07 0 erator Licensin National Examination Schedule As requested by Generic Letter 90-07, "Operator Licensing National Examination Schedule", issued August 10, 1990, attached is the following information: (1) estimates of the anticipated number of candidates to be examined during each site visit as assigned by Generic Letter 89-03 (Enclosure 1); (2) the dates for requalification examinations during Fiscal Years 1991 through 1994 (Enclosure 2); and (3) the estimated number of candidates that will participate in the Generic Fundamental Examination Schedule (Enclosure 3).

Should there be any questions please contact us.

Very truly yours, IUD K. N. arr3.s Site ice President WHB/OIH/oih cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 500$ '"50169 9'00914 PDR ADOCK 05000250 V PDC an Fpl Group companY

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Generic Letter 90-07 Enclosure 1 PROPOSED OPERATOR LICENSING EXAMINATIONSCHEDULE FACILITY: Turke Point Plant NRC REGION II FY 1991 FY 1992 FY 1993 FY 1994 (10/01/90 - (10/01/91- (10/01/92- (10/01/93-09/30/91) 09/30/92) 09/30/93) 09/30/94)

1. Assigned Date 02/91 02/92 02/93 02/94 (GL 89-03)

¹ RO

¹SRO Instant 25

¹SRO Upgrade

¹SRO Limited

2. Assigned Date 08/91 08/92 08/93 08/94 (GL 89-03)

¹RO 20 15 15 15

¹SRO Instant

¹SRO Upgrade

¹SRO Limited

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Generic Letter 90-07 Enclosure 2 PROPOSED REQUALIFICATION EXAMINATIONSCHEDULE FACILITY: Turke Point Plant NRC REGION II FY 1991 FY 1992 FY 1993 FY 1994 (10/01/90- (10/01/91- (10/01/92- (10/01/93-09/30/91) 09/30/92) 09/30/93) 09/30/94)

Date 01/07/91 02/03/92 02/01/93 01/31/94 Date 01/14/91 02/1 0/92 02/08/93 02/07/94 Date 01/21/91 02/17/92 02/15/93 02/14/94 Date 01/28/91 02/24/92 02/22/93 02/21/94 Date 02/04/91 03/02/92 03/01/93 02/28/94

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Generic Letter 90-07 Enclosure 3 PROPOSED GENERIC FUNDAMENTALEXAMINATIONSCHEDULE FACILITY: Turke Point Plant NRC REGION II October 1990 February 1991 June '1991 Estimated Number of Candidates