Advises That Comments on NRC Safety Evaluation Re Implementation of Station Blackout Rule Will Be Provided by 900921
ML17348A419
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/20/1990
From: Harris K
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-90-275, NUDOCS 9007240090
Download: ML17348A419 (4)


Text

ACC:ELERATED DISTRIBUTION DEMONSTPWTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9007240090 DOC.DATE: 90/07/20 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HARRIS,K.N. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Advises that comments on NRC SE re implementation of station blackout rule will be provided by 900921.

DISTRIBUTION CODE: A050D TITLE: OR COPIES RECEIVED:LTR J Submittal: Station Blackout (USI A-44) 10CFR50.63, ENCL 0 SIZE:

MPA A-22

(

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR E CL ID CODE/NAME LTTR ENCL PD2-2 PD EDISON,G INTERNAL: NRR PD1-4PM TAM NRR/DET/ESGB SD NRR/DST/SELB SPLBSD1 NRR/DST/SRXBSE RE 01 EXTERNAL: LPDR NRC PDR NSIC NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP VS TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 16 ENCL

0 pp JUL 20 1990 L-90-275 10 CFR 50.63 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket No. 50-250 and 50-251 Im lementation Of The Station Blackout Rule By letter dated June 15, 1990, (G. Edison to J.H. Goldberg) the Nuclear Regulatory Commission (NRC) transmitted to Florida Power and Light (FPL) the NRC's Safety Evaluation (SE) associated with FPL's proposed design to meet the requirements of the Station Blackout Rule (10 CFR 50.63) at Turkey Point.

Pursuant to 10 CFR 50.63 (c) (4), FPL will make plant modifications as described in FPL letter L-89-144, dated April 17, 1989 and FPL letter L-90-56, dated March 29, 1990. These modifications will be performed during the 1991 dual unit outage, in parallel with the Emergency Power System enhancement.

Documentation necessary to demonstrate compliance with 10 CFR 50.63 (c) (2) for both Turkey Point units will be available for inspection 90 days after return to power from the 1991 dual unit outage.

FPL will provide comments on the NRC's SE by, September 21, 1990.

Should there be any questions, please contact us.

Very truly yours, K. N arris Vice resident Turkey Point Plant Nuclear KNH/GS cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9007240090 900720 F'DR ADOCK 05000250 P PDC an FPL Group company p pro I/p

~'