Other: CNL-14-077, Responses to Degraded Voltage Issue Requests for Additional Information, ML102290358, ML102290360, ML102290361, ML102290362, ML102290363, ML102290364, ML102290365, ML102290366, ML102290367, ML102290368, ML102290383, ML102290384, ML102290385, ML102290386, ML102290387, ML102290388, ML102290389, ML102290390, ML102290391, ML102290392, ML102290403, ML102290404, ML102290405, ML102290406, ML102290407, ML102290408, ML102290409, ML102290410, ML102290411, ML102290414, ML102290439, ML102290440, ML102290441, ML102290442, ML102290443, ML102290444, ML102290445, ML102290446, ML102290447, ML102290448, ML102290458, ML102290459, ML102290460, ML102290461, ML102290462, ML102290463, ML102290464, ML102290465, ML102290466... further results
|
MONTHYEARML1005500072010-03-11011 March 2010 Request for Additional Information Related to Licensee'S Final Safety Analysis Report Amendment 95 Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: RAI ML1010405732010-04-0909 April 2010 Response to NRC Request for Additional Information Regarding Licensee'S Final Safety Analysis Report (FSAR) Amendment Related to Section 4.2.2, Reactor Vessel Internal Components. Project stage: Response to RAI ML1011303512010-05-0505 May 2010 Request for Withholding Information from Public Disclosure (Tac No. ME2731) Project stage: Withholding Request Acceptance ML1014500842010-06-23023 June 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report Amendment Related to Reactor Systems, Nuclear Performance and Code Review, Ansd Plant Systems Project stage: RAI ML1015402502010-06-24024 June 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report Amendment Related to Nuclear Performance and Code Review, Plant Systems, and Testing (Tac Nos. ME2731 and ME3091) Project stage: RAI ML1017903992010-06-28028 June 2010 Request for Additional Information (RAI) Regarding Licensee'S Final Safety Analysis Report Amendment Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: Request ML1016200062010-06-29029 June 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report Amendment Related to Nuclear Performance and Code Review (Tac No. ME2731) Project stage: RAI ML1015304742010-07-0202 July 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report Amendment Related to Mechanical and Civil Engineering Systems Project stage: RAI ML1016000262010-07-0808 July 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report, Amendment Related to Quality and Vendor Branch Review Project stage: RAI ML1015303542010-07-12012 July 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report Amendment Related to Electrical Engineering Systems Project stage: RAI ML1018001562010-07-15015 July 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report Amendment Related to Chapter 8, Electric Power Project stage: RAI ML1023003272010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-4A (Dwg No. 1-47W845-5, R38) Project stage: Other ML1022904642010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-1 (Dwg No. 1-47W845-1, R56) Project stage: Other ML1023003282010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-4B (Dwg No. 1-47W845-7, R14) Project stage: Other ML1023003292010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-5 (Dwg No. 1-47W611-67-1, R8) Project stage: Other ML1023003302010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-6 (Dwg No. 1-47W611-67-2, R5) Project stage: Other ML1023003312010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-8 (Dwg No. 1-47W611-67-4, R5) Project stage: Other ML1023003322010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-9 (Dwg No. 1-47W611-67-5, R10) Project stage: Other ML1023003332010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-10 (Dwg No. 1-47W610-67-1, R27) Project stage: Other ML1023003342010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-10 Sh a (Dwg No. 1-47W610-67-1A, R16) Project stage: Other ML1023003352010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-11 (Dwg No. 1-47W610-67-2, R15) Project stage: Other ML1023003432010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-12 Sh a (Dwg No. 1-47W610-67-3A, R7) Project stage: Other ML1023003442010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-13 (Dwg No. 1-47W610-67-4, R17) Project stage: Other ML1023003452010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-11 Sh a (Dwg No. 1-47W610-67-2A, R8) Project stage: Other ML1023003462010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-12 (Dwg No. 1-47W610-67-3, R12) Project stage: Other ML1023003472010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-14 (Dwg No. 1-47W610-67-5, R14) Project stage: Other ML1023003482010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-14 (Dwg No. 1-47W610-67-5A, R2) Project stage: Other ML1023003492010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-16 (Dwg No. 1-47W859-4, R23) Project stage: Other ML1023003502010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-17 (Dwg No. 1-47W859-3, R18) Project stage: Other ML1023003512010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-18 (Dwg No. 1-47W859-2, R36) Project stage: Other ML1023003522010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-19 (Dwg No. 1-47W859-1, R47) Project stage: Other ML1023003602010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-23 (Dwg No. 1-47W611-70-1, R9) Project stage: Other ML1023003612010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-20 (Dwg No. 1-47W610-70-1, R23) Project stage: Other ML1023003622010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-21 (Dwg No. 1-47W610-70-2, R29) Project stage: Other ML1023003632010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-21A (Dwg No. 1-47W610-70-2A, R15) Project stage: Other ML1023003642010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-22 (Dwg No. 1-47W610-70-3, R17) Project stage: Other ML1023003652010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-24 (Dwg No. 1-47W611-70-2, R11) Project stage: Other ML1023003672010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-25 (Dwg No. 1-47W611-70-3, R4) Project stage: Other ML1023003682010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-25A (Dwg No. 1-47W611-70-4, R4) Project stage: Other ML1023003692010-08-0505 August 2010 Final Safety Analysis Report Figure 9.3-1 (Dwg No. 1-47W610-32-1, R15) Project stage: Other ML1023003962010-08-0505 August 2010 Final Safety Analysis Report Figure 9.5-25 (Dwg No. 1-47W610-82-1, R18) Project stage: Other ML1022903582010-08-0505 August 2010 Final Safety Analysis Report Figure 8.1.2 (Dwg No. 1-15E500-1, R31) Project stage: Other ML1022903602010-08-0505 August 2010 Final Safety Analysis Report Figure 8.1-2A (Dwg No. 1-15E500-2, R39) Project stage: Other ML1022903612010-08-0505 August 2010 Final Safety Analysis Report Figure 8.1-2B (Dwg No. 1-15E500-3, R19) Project stage: Other ML1022903622010-08-0505 August 2010 Final Safety Analysis Report Figure 8.1-3 (Dwg No. 1-45W700-1, R28) Project stage: Other ML1022903632010-08-0505 August 2010 Final Safety Analysis Report Figure 8.2-1 (Dwg No. 1-75W500, R18) Project stage: Other ML1022903642010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-6 (Dwg No. 1-45W760-211-8, R14) Project stage: Other ML1022903652010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-7 (Dwg No. 1-45W760-211-9, R16) Project stage: Other ML1022903662010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-8 (Dwg No. 1-45W760-211-10, R12) Project stage: Other ML1022903672010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-9 (Dwg No. 1-45W760-211-11, R13) Project stage: Other 2010-06-28
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24008A1592024-01-18018 January 2024 Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML23304A0682023-11-0606 November 2023 Summary of October 24, 2023, Public Mtg W/Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, and Sequoyah Nuclear Plant, Units 1 and 2 to Revise Function 5, Turbine Trip and F ML23265A1512023-09-28028 September 2023 Summary of September 12, 2023, Partially Closed Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request ML23198A3102023-07-20020 July 2023 July 10, 2023, Summary of Public Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML23068A1532023-03-16016 March 2023 Summary of February 22, 2023, Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request to Increase Allowable Number of Tritium Producing Burnable Absorber Rods at Watts Bar Nuclear Plant, Units 1 and 2 ML23055A4562023-03-0909 March 2023 Summary of February 15, 2023, Public Meeting with Tennessee Valley Authority Regarding Proposed Expedited License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML22329A1382022-12-0505 December 2022 Summary of Meeting with Tennessee Valley Authority Related to Planned Alternative Request WBN-2-ISI-01 for Watts Bar Nuclear Plant, Unit 2 ML22168A1642022-06-27027 June 2022 Summary of June 9, 2022, Meeting with TVA Regarding a Proposed License Amendment Request Related to Low Temperature Overpressure System and Cold Overpressure Mitigation System for Sequoyah and Watts Bar Nuclear Plants ML22109A0042022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Alternative Request Related to Testing of the Motor-Driven Auxiliary Feedwater Pumps at Sequoyah and Watts Bar Nuclear Plants ML22104A2252022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Exemption Request for Watts Bar Nuclear Plant, Unit 2 ML22108A1842022-04-18018 April 2022 TVA 2021 Annual Assessment Public Meeting Summary ML22042B3262022-02-14014 February 2022 Summary of February 8, 2022, Meeting with Tennessee Valley Authority Regarding a Proposed License Amendment Request to Revise the Allowable Value for Trip of Turbine-Driven Main Feedwater Pump at Watts Bar Nuclear Plant, Unit 1 ML22025A3112022-02-0909 February 2022 Summary of January 19, 2022, Meeting with Tennessee Valley Authority Regarding a Proposed Schedule for Development of a License Amendment Request for Increased Tritium Production ML21349A3642022-01-0404 January 2022 Summary of December 14, 2021, Teleconference with Tennessee Valley Authority Regarding a Proposed Change to the Capsule Withdrawal Schedule for Watts Bar Nuclear Plant, Unit 2 ML21279A0902021-11-0303 November 2021 Summary of Conference Calls Regarding the Fall 2021, Mid-Cycle Steam Generator Tube Inspections ML21291A0092021-11-0303 November 2021 Tennessee Valley Authority Fleet - Summary of October 13, 2021, Teleconference with Tennessee Valley Authority to Discuss Planned License Amendment Requests Related to the Emergency Action Level Scheme ML21245A4252021-09-15015 September 2021 Summary of August 19, 2021, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to the Watts Bar Nuclear Plant, Units 1 and 2 ML21253A0872021-09-15015 September 2021 Summary of August 19, 2021, Partially Closed Meeting with Tennessee Valley Authority to Discuss Mid-Cycle Outage Contingencies for Watts Bar Nuclear Plant, Unit 2 ML21165A1482021-06-30030 June 2021 Summary of Closed Meeting with Tennessee Valley Authority to Discuss Planned Requests for Exemption from Certain Requirements of 10 CFR Part 37 ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML21120A2192021-05-0404 May 2021 April 28,2021, Summary of Meeting with Tennessee Valley Authority Related to a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, to Remove from Technical Specifications Redundant Units of Measurement for Control ML21099A2072021-04-13013 April 2021 Summary of April 7, 2021, Meeting with Tennessee Valley Authority Related to a Planned Relief Request from ASME Code Testing Requirements ML21060B0532021-03-0303 March 2021 Summary of February 11, 2021, Meeting with Tennessee Valley Authority Related to a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2, to Apply a Temperature Adjusted Steam Generator Tube Flaw Growth Rate Methodology ML21033A5952021-02-23023 February 2021 Summary of Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Requests Related to the Watts Bar Nuclear Plant, Unit 2 Steam Generator Replacement ML20357A0092021-01-19019 January 2021 Summary of December 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to Use of Alternate Probability of Detection at Watts Bar Nuclear Plant, Unit 2 ML20351A4212021-01-19019 January 2021 Summary of Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Requests Related to the Watts Bar, Unit 2, Steam Generator Replacement ML20351A2192021-01-11011 January 2021 Summary of Conference Calls Regarding the Fall 2020 Steam Generator Tube Inspections ML20337A0402020-12-15015 December 2020 Summary of November 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request for Technical Specification 5.9.9, Steam Generator Tube Inspection Report ML20323A0662020-11-27027 November 2020 Summary of October 28, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request for Technical Specification Surveillance Requirement 3.6.15.4, Shield Building ML20244A1892020-09-11011 September 2020 Summary of Teleconference Call with Tennessee Valley Authority Regarding a Proposed Change to the Containment Leakage Rate Testing Program ML20213C7112020-08-25025 August 2020 Summary of July 28, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned Alternative Request for Watts Bar Nuclear Plant, Unit 1 ML20233A8352020-08-25025 August 2020 Summary of August 11, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML20175A8012020-08-11011 August 2020 Summary of June 23, 2020, Public Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20211L8222020-08-10010 August 2020 Summary of Teleconference Call with the Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 1 ML20150A4162020-06-24024 June 2020 Summary of May 28, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 1 ML20153A3622020-06-22022 June 2020 Summary of May 27, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML20143A1692020-05-28028 May 2020 Summary of May 14, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2 ML20135H2702020-05-28028 May 2020 Summary of May 5, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML20034F5232020-02-12012 February 2020 Summary of Meeting with Tennessee Valley Authority Regarding Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML19347D1592020-01-0707 January 2020 Summary of December 12, 2019, Meeting with Northern States Power Co., Doing Business as Xcel Energy, and Tennessee Valley Authority Planned License Amendment Requests for Prairie Island, Units 2 and 2, and Watts Bar, Units 1 and 2 ML19296B6642019-11-0707 November 2019 Summary of Pre-Application Meeting with TVA Regarding a Planned License Amendment Request to Revise Technical Specification 3.6.15 Condition B and Surveillance Requirement 3.6.15.1 at Watts Bar Nuclear Plant ML19301A4762019-11-0707 November 2019 Summary of Pre-Application Meeting with Tennessee Valley Authority Regarding Planned License Amendment Request to Remove Technical Specification Requirement to Surveil Automatic Transfer (EPID L-2019-LRM-0038 ML19294A3082019-10-28028 October 2019 Summary of July 18, 2019, Pre-Application Meeting with Tennessee Valley Authority Planned License Amendment Request for Approval to Implement a Measurement Uncertainty Recapture Power Uprate ML19284A3532019-10-28028 October 2019 Summary of October 10, 2019, Meeting with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML19253A6732019-09-17017 September 2019 Summary of Closed Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment for Watts Bar Nuclear Plant, Units 1 and 2 ML19255H5522019-09-12012 September 2019 August 27, 2019, Summary of Public Meeting - Tennessee Valley Safety Conscious Work Environment Update at Watts Bar, Docket 50-390 and 50-391 ML19235A2862019-09-0303 September 2019 Summary of Meeting with Tennessee Valley Authority Regarding Request to Adopt Technical Specifications Task Force Traveler TSTF-500 at Watts Bar, Units 1 and 2 ML19218A2282019-08-15015 August 2019 Summary of July 1, 2019, Pre-Application Meeting with TVA Regarding Planned License Amendment Request to Implement Full Spectrum Loss-of-Coolant Accident Evaluation Methodology 2024-01-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 28, 2014 LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 1
SUBJECT:
SUMMARY
OF JANUARY 28,2014, MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2, OPEN ITEMS FOR LICENSING On January 28, 2014, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of this meeting was for TVA to discuss with NRC outstanding open items related to the licensing effort for the Watts Bar Nuclear Plant (WBN}, Unit 2.
During the first portion of the meeting TVA discussed a draft request for additional information (RAI) from NRC staff regarding the Draft Offsite Dose Calculation Manual (ODCM) for WBN.
The draft ODCM is available in the Agencywide Documents Access and Management (ADAMS) at Accession No. ML12311A151. The draft RAI is available at ADAMS Accession No. ML14030A109. TVA asked clarifying questions on the RAis numbered 6, 16, and 21. Following the discussion, TVA stated they understood the intent of the RAis and would respond accordingly.
The NRC and TVA staff then discussed the status of each of the electrical open items documented in supplements to NUREG-0847 "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2," as presented in Enclosure 2. The main focus was on open item no. 30 related to degraded voltage issues. TVA stated that they believe they addressed this issue already and that if the NRC staff doesn't agree with TVA's approach that the NRC needs to formally document this in an RAI so that they could find a path to resolution.
In the meeting, the NRC staff agreed to review TVA's last submittal attempting to resolve this issue and would issue RAis if required. Subsequent to the meeting the staff issued an RAI on February 27, 2014 (ADAMS Accession No. ML14059A158).
In addition to the open items documented in NUREG-0847 (of which the latest version is Supplement 26 and available in ADAMS at Accession No. ML13205A136), TVA and the NRC staff discussed Bulletin 2012-01 "Design Vulnerability in Electric Power System" (ADAMS Accession No. ML12074A115) and TVA's response for WBN Unit 2. The NRC staff stated that they were reviewing TVA's response, as well as those from the rest of the industry, and believed that additional information would be needed to resolve the issue for WBN Unit 2. Subsequent to the meeting the staff issued an RAI related to the open phase issue on February 27, 2014 (ADAMS Accession No. ML14059A158).
The NRC licensing project managers reiterated that the NRC is collectively supporting making an operating license decision in early 2015. To support this schedule, TVA needs to provide the appropriate information to facilitate the staff completing its review by summer of 2014.
The NRC electrical engineering staff mentioned that their technical review resources were limited but they were willing to support the overall project schedule.
No regulatory decisions were made at the meeting. Two members of the public joined the meeting by teleconference. Questions from the public addressed the location of radiation monitoring and the availability of the real-time radiation monitoring data. The NRC addressed the questions and noted that although the real time data is not directly available to the public the NRC performs routine inspections and publishes annual reports on radiation monitoring that are publicly available. Members of the public asked about TVA's authority to close the rivers surrounding WBN. The NRC staff noted that TVA could close the river in a flooding scenario and in case of a site emergency where the public would need to be protected.
A member of the public asked the NRC to provide high level milestones and due dates related to the licensing effort for WBN Unit 2. The staff agreed to provide the information and to make updates reflecting the current licensing schedule to the public WBN Unit 2 website; http://www.nrc.gov/info-finder/reactor/wb/watts-bar.html. An updated timeline with high level milestones is available at http://www.nrc.gov/info-finder/reactor/wb/watts-bar/wb2-timeline.pdf.
No Public Meeting Feedback forms were received.
Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosures:
- 1. List of Attendees
- 2. Table of Open Electrical Engineer Action Items cc w/encls: Distribution via Listserv
MEETING ATTENDANCE LIST Licensee: Tennessee Valley Authority Plant: Watts Bar Nuclear Plant. Unit 2
Subject:
ODCM and Electrical Open Items Date: January 28, 2014 Location: U.S. Nuclear Regulatory Commission Time: 2:30p.m.- 4:00p.m.
Headquarters. Room 0-7B4 NAME TITLE ORGANIZATION John Menninger Deputy Division Director NRC/NRRIDORL NRC/NRRIDORL/Piant Licensing Justin Poole Sr. Project Manager Branch 11-2 NRC/NRRIDORL/Piant Licensing Andy Hon Project Manager Branch 11-2 NRC/NRRIDORL/Piant Licensing Jeanne Dion Project Manager Branch 11-2 Roger Pedersen Sr. Health Physicist NRC/NRRIDRA Chief, Electrical Engineering Jake Zimmerman NRC/NRRIDE/EEEB Branch Roy Mathew Team Leader NRC/NRRIDE/EEEB Mechanical/Nuclear Bill Crouch TVAIWBN2 Engineering Manager Electricai/I&C Engineering Steven Hilmes TVAIWBN2 Manager Bob Bryan Licensing TVA Enclosure 1
NAME TITLE ORGANIZATION Gordon Arent TVA Director, WBN Licensing TVA Gary Morgan Member of Public Sara B Member of Public Southern Alliance for Clean Energy
WATTS BAR UNIT 2 ACTION ITEMS TABLE This table provides a status of required action items associated of all open items, confirmatory issues, and proposed license conditions that the staff has identified.
Cl - Confirmatorv I Item ~ Action Reguired NRC TVA TVA Action Reguired to NRC Action Reguired to Due § Lead Res(;!onse Close Close Date § Reguired/ ~
TVA Lead R
( 1) Cl Review evaluations and EEEB Yes/ EC:1/17/14 TVA to provide letter to NRR 28 corrective actions associated ELE FC: documenting any power with a power assisted cable TVA to provide letter to NRR assisted cable pulls if pull. (NRC safety evaluation documenting any power performed. NRR and/or Rll to dated August 31, 2009, assisted cable pulls if review calculations on any ADAMS Accession No. performed. NRR and/or Rll power assisted cable pulls.
ML092151155) to review calculations on any Results documented in power assisted cable pulls. inspection report. Letter from Results documented in TVA if no power assisted inspection report. Letter cable pulls were done.
from TVA if no power assisted cable pulls were done. NRR Calculation Review Addressed by Maximo Commitment Closure package 10181059 (7) Cl Verify commitment completion Rll No/ EC: Ongoing Include in inspection planning 27 and review electrical design Elec FC: N/A and conduct inspection.
calculations. (TVA letter dated For NRC Inspection I Review Reference closure in IR and October 9, 1990, ADAMS See commitments in TVA SER. Specific actions need to Accession No. ML073551056) Letter. Provide Guillermo be clarified with EEEB.
Crespo a copy of related electrical calculation procedures and provide NRC access to calculations Enclosure 2
Item ~ Action Reguired NRC TVA TVA Action Reguired to NRC Action Reguired to Due § Lead Reseonse Close Close Date § Reguired/ g TVA Lead R (16) Based on the uniqueness of Rll/ No/ EC: Ongoing Inspection Conduct EQ inspection. 27 EQ, the NRC staff must EEEB ELE FC: N/A Document in IR and update perform a detailed inspection status in Appendix HH.
and evaluation prior to fuel load For NRC Inspection I Review to determine how the WBN Provide NRC Lisa Castelli Unit 2 EQ program complies copies of EQ documents as with the requirements of 10 requested for the onsite CFR 50.49. (SSER 22, inspections.
Section 3.11.2, pg 3-12/13)
(17) The NRC staff should verify the Rll/ No/ EC: Ongoing Inspection Conduct EQ inspection. 27 accuracy of the WBN Unit 2 EEEB ELE FC: N/A Document in IR and update EQ list prior to fuel load. status in Appendix HH.
(SSER 22, Section 3.11.2.1, For NRC Inspection/Review:
pg 3-13) provide NRC Lisa Castellicopies of EQ documents as requested for the onsite inspections.
(23) Resolve whether or not TVA's EEEB Yes/ EC: Complete NRR reviewing the April 6, 27 reasoning for not upgrading the ELE FC: N/A 2011 response. TVA stated MSIV solenoid valves to Response provided in TVA to that the MSIV solenoids would Category I is a sound reason to NRC letter dated April 6, be upgraded to Cat I. TVA to the contrary, as specified in 10 2011. provide letter to close out CFR 50.49(1). (SSER 22, commitment from 4/6/11 letter.
Section 3.11.2.2.1, pg 3-15)
(26) For the scenario with an EEEB Yes EC: Complete TVA provided information in 27 accident in one unit and FC: N/A April 6, 2011 letter. Additional concurrent shutdown of the Response provided in TVA to RAis were sent to TVA on second unit without offsite NRC letter dated April 6, 11/18/2011. NRR tech staff power, TVA stated that Unit 2 2011. review and document in SER.
pre-operational testing will Updated response on June This item was also partially validate the diesel response to 7, 2012. reviewed during EDSFI.
sequencing of loads on the EEEB to review results of Unit 2 emergency diesel IDVP and EDSFI reports for generators (EDGs). The NRC impact in this area.
staff will evaluate the status of
Item ~ Action Reguired NRC TVA TVA Action Reguired to NRC Action Reguired to Due § Lead Reseonse Close Close Date § Reguired/ E TVA Lead R this issue and will update the status of the EDG load response in a future SSER.
(SSER 22, Section 8.1)
(30) TVA should confirm that all Rll/ NO/ EC: Complete TVA submitted letter dated 27 other safety-related equipment EEEB ELE FC: N/A August 12, 2011 and update (in addition to the Class 1E Submitted letter 8/12/11. on June 7, 2012. NRR tech motors) will have adequate Updated response on June staff review and document in starting and running voltage at 7, 2012. SER.
the most limiting safety related components (such as motor operated valves, contactors, solenoid valves or relays) at the degraded voltage relay setpoint dropout setting. TVA should also confirm that the final Technical Specifications are properly derived from these analytical values for the degraded voltage settings.
(SSER 22, Section 8.3.1.2, pg 8-1 0}
(32) TVA should provide to the NRC EEEB Yes/ Due date: June 2013 TVA to provide information on 27 staff the details of the ELE (Hilmes) EDG admin limits. NRR tech administrative limits of EDG FC: N/A staff review and document in voltage and speed range, and SER. TVA to submit the basis for its conclusion that Tech Spec review is with amendment to TSs for Unit 2.
the impact is negligible, and Corporate Licensing (Joe (FYI we decided to submit on describe how it accounts for Shea). Provide response for U2 first) the administrative limits in the submittal to NRR.
Technical Specification Note - NRC Rll may have an surveillance requirements for issue with the actual DG EDG voltage and frequency. loading.
(SSER 22, Section 8.3.1.14, pg 8-14)
Item ~ Action Reguired NRC TVA TVA Action Reguired to NRC Action Reguired to Due ~I Lead Reseonse Close Close Date ~
~I Reguired/
TVA Lead (33) Cl TVA stated in Attachment 9 of Rll/ Yes/ EC: Complete TVA provided information in 27 I its letter dated July 31, 2010, EEEB FC: April 6, 2011 letter. TVA to that certain design change Response provided in TVA to notify Rll when work notices (DCNs) are required or NRC letter dated April 6, 20 completed. Rll to verify anticipated for completion of completion of DCNs and WBN Unit 2, and that these include in IR. Update status in DCNs were unverified Appendix HH.
assumptions used in its analysis of the 125 V de vital battery system. Verification of completion of these DCNs to the NRC staff is necessary prior to issuance of the operating license. (SSER 22, Section 8.3.2.3, pg 8-16)
PKG ML14132A283 s
Meeting Notice - ML14015A452 Meeting ummary- ML14091A272 Han d outs - ML14030A109 OFFICE DORULPWB/PMiT DORULPLWB/PM DORULPWB/LA NRRIDE/EEEB DORULPWB/BC DORULPWB/PM NAME JDion JPoole BCiayton JZimmerman JQuichocho JPoole DATE 5/13/14 5/13/14 5/13/14 5/20/14 5/27/14 5/28/14