Letter Sequence RAI |
|---|
TAC:ME2731, Clarify Application of Setpoint Methodology for LSSS Functions (Withdrawn, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement, Supplement, Supplement
Results
Other: CNL-14-077, Responses to Degraded Voltage Issue Requests for Additional Information, ML101050203, ML102240630, ML102290358, ML102290360, ML102290361, ML102290362, ML102290363, ML102290364, ML102290365, ML102290366, ML102290367, ML102290368, ML102290383, ML102290384, ML102290385, ML102290386, ML102290387, ML102290388, ML102290389, ML102290390, ML102290391, ML102290392, ML102290403, ML102290404, ML102290405, ML102290406, ML102290407, ML102290408, ML102290409, ML102290410, ML102290411, ML102290414, ML102290439, ML102290440, ML102290441, ML102290442, ML102290443, ML102290444, ML102290445, ML102290446, ML102290447, ML102290448, ML102290458, ML102290459, ML102290460, ML102290461, ML102290462, ML102290463, ML102290464... further results
|
MONTHYEARML0933702752009-11-24024 November 2009 Final Safety Analysis Report, Amendment 95, Cover Letter Project stage: Request ML12192A3682009-12-0909 December 2009 Tennessee Department of Health Public Health Assessment 2009 Project stage: Request ML1001916862010-01-11011 January 2010 Final Safety Analysis Report, Amendment 97, Section 8 - Electric Power Through 8E-12 Project stage: Request ML1001914212010-01-11011 January 2010 Final Safety Analysis Report, Amendment 97 Project stage: Request ML1002204742010-02-0505 February 2010 IP 37002, Construction Refurbishment Process - Watts Bar Unit 2 Project stage: Request ML1005500072010-03-11011 March 2010 Request for Additional Information Related to Licensees Final Safety Analysis Report Amendment 95 Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: RAI ML1007100112010-03-12012 March 2010 OL - List of Documents for Docketing Referenced on Page 5 of the Site Audit Trip Report Project stage: Request ML1010502032010-04-0808 April 2010 Additional Information Regarding Final Safety Analysis Report, Chapter 7, Instrumentation and Controls Review - Requested Common Q Proprietary Documents Project stage: Other ML1010405732010-04-0909 April 2010 Response to NRC Request for Additional Information Regarding Licensees Final Safety Analysis Report (FSAR) Amendment Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: Response to RAI ML1011701022010-04-27027 April 2010 Notice of Meeting with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Submittals Project stage: Request ML1011303512010-05-0505 May 2010 Request for Withholding Information from Public Disclosure (Tac No. ME2731) Project stage: Withholding Request Acceptance ML1016102902010-05-27027 May 2010 Transmittal of Amendment 99 to Final Safety Analysis Report (FSAR) Project stage: Request ML1016203602010-06-17017 June 2010 Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) to Discuss the Complete Status of TVA Hydrology Issues Including the Flooding Effects on the TVA Operating Nuclear Plants Project stage: Request ML1014500842010-06-23023 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Reactor Systems, Nuclear Performance and Code Review, Ansd Plant Systems Project stage: RAI ML1015402502010-06-24024 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Nuclear Performance and Code Review, Plant Systems, and Testing (Tac Nos. ME2731 and ME3091) Project stage: RAI ML1017903992010-06-28028 June 2010 Request for Additional Information (RAI) Regarding Licensees Final Safety Analysis Report Amendment Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: Request ML1016200062010-06-29029 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Nuclear Performance and Code Review (Tac No. ME2731) Project stage: RAI ML1015304742010-07-0202 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Mechanical and Civil Engineering Systems Project stage: RAI ML1016000262010-07-0808 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report, Amendment Related to Quality and Vendor Branch Review Project stage: RAI ML1015303542010-07-12012 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Electrical Engineering Systems Project stage: RAI ML1018001562010-07-15015 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Chapter 8, Electric Power Project stage: RAI ML1020202812010-07-30030 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Chapter 3.11 Project stage: RAI ML1023003322010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-9 (Dwg No. 1-47W611-67-5, R10) Project stage: Other ML1022904662010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-3 (Dwg No. 1-47W845-3, R23) Project stage: Other ML1023003332010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-10 (Dwg No. 1-47W610-67-1, R27) Project stage: Other ML1023003342010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-10 Sh a (Dwg No. 1-47W610-67-1A, R16) Project stage: Other ML1023003352010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-11 (Dwg No. 1-47W610-67-2, R15) Project stage: Other ML1023003432010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-12 Sh a (Dwg No. 1-47W610-67-3A, R7) Project stage: Other ML1023003442010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-13 (Dwg No. 1-47W610-67-4, R17) Project stage: Other ML1023003452010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-11 Sh a (Dwg No. 1-47W610-67-2A, R8) Project stage: Other ML1023003462010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-12 (Dwg No. 1-47W610-67-3, R12) Project stage: Other ML1023003472010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-14 (Dwg No. 1-47W610-67-5, R14) Project stage: Other ML1023003482010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-14 (Dwg No. 1-47W610-67-5A, R2) Project stage: Other ML1023003492010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-16 (Dwg No. 1-47W859-4, R23) Project stage: Other ML1023003502010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-17 (Dwg No. 1-47W859-3, R18) Project stage: Other ML1023003512010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-18 (Dwg No. 1-47W859-2, R36) Project stage: Other ML1023003522010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-19 (Dwg No. 1-47W859-1, R47) Project stage: Other ML1023003602010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-23 (Dwg No. 1-47W611-70-1, R9) Project stage: Other ML1023003612010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-20 (Dwg No. 1-47W610-70-1, R23) Project stage: Other ML1023003622010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-21 (Dwg No. 1-47W610-70-2, R29) Project stage: Other ML1023003632010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-21A (Dwg No. 1-47W610-70-2A, R15) Project stage: Other ML1023003642010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-22 (Dwg No. 1-47W610-70-3, R17) Project stage: Other ML1023003652010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-24 (Dwg No. 1-47W611-70-2, R11) Project stage: Other ML1023003672010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-25 (Dwg No. 1-47W611-70-3, R4) Project stage: Other ML1023003682010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-25A (Dwg No. 1-47W611-70-4, R4) Project stage: Other ML1023003692010-08-0505 August 2010 Final Safety Analysis Report Figure 9.3-1 (Dwg No. 1-47W610-32-1, R15) Project stage: Other ML1023003702010-08-0505 August 2010 Final Safety Analysis Report Figure 9.3-2 (Dwg No. 1-47W610-32-2, R19) Project stage: Other ML1023003732010-08-0505 August 2010 Final Safety Analysis Report Figure 9.3-6 (Dwg No. 1-47W848-1, R24) Project stage: Other ML1022903682010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-14B (Dwg No. 1-45W760-82-1, R17) Project stage: Other ML1022903652010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-7 (Dwg No. 1-45W760-211-9, R16) Project stage: Other 2010-05-05
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 15, zoin Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
WADS BAR NUCLEAR PLANT, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSEE'S FINAL SAFETY ANALYSIS REPORT AMENDMENT RELATED TO CHAPTER 8, "ELECTRIC POWER" (TAC NO. ME2731)
Dear Mr. Bhatnagar:
By letters dated November 24, 2009, December 14, 2009, January 11, 2010, May 7, 2010, and May 17, 2010, Tennessee Valley Authority submitted Final Safety Analysis Report Amendments 95, 96, 97, 98, and 99, respectively.
The submittals contain drawings that have detail that is not readable. The Nuclear Regulatory Commission staff reviewed the information provided and determined that readable drawings are required to complete its assessment of the applicant's submittals. In the enclosed request for additional information (RAI), the staff has listed the requested drawings.
A response is required within 30 days of receipt of this letter.
If you should have any questions, please contact me at 301-415-6606.
Joel S. Wiebe, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosure:
RAI cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION WATTS BAR NUCLEAR PLANT, UNIT 2 FINAL SAFETY ANALYSIS REPORT AMENDMENTS 95 THROUGH 99 TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-391 By letters dated November 24, 2009 (Agencywide Document and Management System Accession No. ML093370274), December 14, 2009 (ML093570464), and January 11, 2010 (ML100191426),
May 7,2010 (ML101340795), May 17, 2010 (ML101610291) Tennessee Valley Authority submitted Final Safety Analysis Report (FSAR) Amendments 95, 96, 97, 98, and 99, respectively. The following additional information related to Chapter 8, "Electric Power" is required to proceed with our review.
The FSAR submittals contain drawings that have detail that is not readable. Submit the drawings listed below. In addition to your submittal, provide the drawings on "G" size prints.
TVA DWG NO. 1-15E500-1 R31 TVA DWG NO. 1-15E500-2 R39 TVA DWG NO. 1-15E500-3 R19 TVA DWG NO. 1-45W700-1 R28 TVA DWG NO. 1-75W500 R18 TVA DWG NO. 1-45W760-211-8 R14 TVA DWG NO. 1-45W760-211-9 R16 TVA DWG NO. 1-45W760-211-10 R12 TVA DWG NO. 1-45W760-211-11 R13 TVA DWG NO. 1-45W760-82-1 R17 TVA DWG NO. 1-45W760-82-1A R8 TVA DWG NO. 1-45W760-82-1B R8 TVA DWG NO. 1-45W760-82-1C R8 TVA DWG NO. 1-45W731 R23 TVA DWG NO. 1-45W724-1 R24 TVA DWG NO. 1-45W724-2 R24 TVA DWG NO. 1-45W724-3 R23 TVA DWG NO. 1-45W724-4 R20 TVA DWG NO. 1-45W749-1 R58 TVA DWG NO. 1-45W749-1A R37 TVA DWG NO. 1-45W749-2 R54 TVA DWG NO. 1-45W749-3 R56 TVA DWG NO. 1-45W749-3A R38 TVA DWG NO. 1-45W749-4 R61 TVA DWG NO. 1-45W749-4A R40 TVA DWG NO. 1-45W727 R20 TVA DWG NO. 1-45W728-1 R10 TVA DWG NO. 1-45W760-82-2 R17 TVA DWG NO. 1-45W760-82-3 R10 TVA DWG NO. 1-45W760-82-4 R20 TVA DWG NO. 1-45W760-18-1 R12 TVA DWG NO. 1-47W845-1 R56 FSAR FIGURE 8.1-2 FSAR FIGURE 8.1-2A FSAR FIGURE 8.1-2B FSAR FIGURE 8.1-3 FSAR FIGURE 8.2-1 FSAR FIGURE 8.3-6 FSAR FIGURE 8.3-7 FSAR FIGURE 8.3-8 FSAR FIGURE 8.3-9 FSAR FIGURE 8.3-14B FSAR FIGURE 8.3-14C FSAR FIGURE 8.3-14D FSAR FIGURE 8.3-14E FSAR FIGURE 8.3-15 FSAR FIGURE 8.3-16 FSAR FIGURE 8.3-17 FSAR FIGURE 8.3-18 FSAR FIGURE 8.3-19 FSAR FIGURE 8.3-20 FSAR FIGURE 8.3-20 SH A FSAR FIGURE 8.3-21 FSAR FIGURE 8.3-22 FSAR FIGURE 8.3-22 SH A FSAR FIGURE 8.3-23 FSAR FIGURE 8.3-23A FSAR FIGURE 8.3-24 FSAR FIGURE 8.3-24A (Add Figures 8.3-24B, C, and D)
FSAR FIGURE 8.3-25B (Add Figures 8.3-25A, C, D, and E)
FSAR FIGURE 8.3-26B (Add Figures 8.3-26A, C, D, and E)
FSAR FIGURE 8.3-27B (Add Figures 8.3-27A, C, D, and E)
FSAR FIGURE 8.3-32 FSAR FIGURE 9.2-1
TVA DWG NO. 1-47W845-2 R76 TVA DWG NO. 1-47W845-3 R23 TVA DWG NO. 1-47W845-4 R32 TVA DWG NO. 1-47W845-5 R38 TVA DWG NO. 1-47W845-7 R14 TVA DWG NO. 1-47W611-67-1 R8 TVA DWG NO. 1-47W611-67-2 R5 TVA DWG NO. 1-47W611-67-3 R2 TVA DWG NO. 1-47W611-67-4 R5 TVA DWG NO. 1-47W611-67-5 R10 TVA DWG NO. 1-47W610-67-1 R27 TVA DWG NO. 1-47W610-67-1A R16 TVA DWG NO. 1-47W610-67-2 R15 TVA DWG NO. 1-47W610-67-2A R8 TVA DWG NO. 1-47W610-67-3 R12 TVA DWG NO. 1-47W610-67-3A R7 TVA DWG NO. 1-47W610-67-4 R17 TVA DWG NO. 1-47W610-67-5 R14 TVA DWG NO. 1-47W610-67-5A R2 TVA DWG NO. 1-47W859-4 R23 TVA DWG NO. 1-47W859-3 R18 TVA DWG NO. 1-47W859-2 R36 TVA DWG NO. 1-47W859-1 R47 TVA DWG NO. 1-47W610-70-1 R23 TVA DWG NO. 1-47W61 0-70-2 R29 TVA DWG NO. 1-47W610-70-2A R15 TVA DWG NO. 1-47W610-70-3 R17 TVA DWG NO. 1-47W611-70-1 R9 TVA DWG NO. 1-47W611-70-2 R11 TVA DWG NO. 1-47W611-70-3 R4 TVA DWG NO. 1-47W611-70-4 R4 TVA DWG NO. 1-47W610-32-1 R15 TVA DWG NO. 1-47W610-32-2 R19 TVA DWG NO. 1-47W611-32-1 R5 TVA DWG NO. 1-47W611-32-2 R5 TVA DWG NO. 1-47W846-2 R37 TVA DWG NO. 1-47W848-'1R24 TVA DWG NO. 47W848-10 R22 TVA DWG NO. 1-47W809-1 R59 TVA DWG NO. 1-47W809-2 R22 TVA DWG NO. 1-47W865-3 R19 TVA DWG NO. 1-47W865-7 R22 TVA DWG NO. 1-47W840-1 B R11 TVA DWG NO. 1-47W610-18-1 R14 TVA DWG NO. 1-47W611-18-1 R4 TVA DWG NO. 1-47W839-1 R17 TVA DWG NO. 1-47W610-82-1 R18 TVA DWG NO. 1-47W610-82-2 R7 TVA DWG NO. 1-47W610-82-3 R7 TVA DWG NO. 1-47W610-82-4 R7
-2 FSAR FIGURE 9.2-2 FSAR FIGURE 9.2-3 FSAR FIGURE 9.2-4 FSAR FIGURE 9.2-4A FSAR FIGURE 9.2-4B FSAR FIGURE 9.2-5 FSAR FIGURE 9.2-6 FSAR FIGURE 9.2-7 FSAR FIGURE 9.2-8 FSAR FIGURE 9.2-9 FSAR FIGURE 9.2-10 FSAR FIGURE 9.2-10 SH A FSAR FIGURE 9.2-11 FSAR FIGURE 9.2-11 SH A FSAR FIGURE 9.2-12 FSARFIGURE 9.2-12 SH A FSAR FIGURE 9.2-13 FSAR FIGURE 9.2-14 FSAR FIGURE 9.2-14 SH A FSAR FIGURE 9.2-16 FSAR FIGURE 9.2-17 FSAR FIGURE 9.2-18 FSAR FIGURE 9.2-19 FSARFIGURE 9.2-20 FSAR FIGURE 9.2-21 FSAR FIGURE 9.2-21 SH A FSAR FIGURE 9.2-22 FSAR FIGURE 9.2-23 FSAR FIGURE 9.2-24 FSAR FIGURE 9.2-25 FSAR FIGURE 9.2-25A FSAR FIGURE 9.3-1 FSAR FIGURE 9.3-2 FSAR FIGURE 9.3-3 FSAR FIGURE 9.3-4 FSAR FIGURE 9.3-5A FSAR FIGURE 9.3-6 FSAR FIGURE 9.3-6A FSAR FIGURE 9.3-15 SH 1 FSAR FIGURE 9.3-15-2 FSAR FIGURE 9.4-2 FSAR FIGURE 9.4-3 FSAR FIGURE 9.5-20 SH B FSAR FIGURE 9.5-21 FSAR FIGURE 9.5-22 FSAR FIGURE 9.4-24 FSAR FIGURE 9.5-25 FSAR FIGURE 9.5-25A FSAR FIGURE 9.5-25B FSAR FIGURE 9.5-25C
JUly 15, 2010 Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSEE'S FINAL SAFETY ANALYSIS REPORT AMENDMENT RELATED TO CHAPTER 8, "ELECTRIC POWER" (TAC NO. ME2731)
Dear Mr. Bhatnagar:
By letters dated November 24, 2009, December 14, 2009, January 11, 2010, May 7, 2010, and May 17, 2010, Tennessee Valley Authority submitted Final Safety Analysis Report Amendments 95, 96, 97, 98, and 99, respectively.
The submittals contain drawings that have detail that is not readable. The Nuclear Regulatory Commission staff reviewed the information provided and determined that readable drawings are required to complete its assessment of the applicant's submittals. In the enclosed request for additional information (RAI), the staff has listed the requested drawings.
A response is required within 30 days of receipt of this letter.
If you should have any questions, please contact me at 301-415-6606.
Sincerely, IRA!
Joel S. Wiebe, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosure:
RAI cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPWB Reading File RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource RidsNrrDorlLpwb Resource RidsNrrLABClayton Resource RidsRgn2MailCenter Resource RidsNrrDeEeeb Resource RidsNrrPMWattsBar2 Resource RidsNrrDorlDpr ADAMS Accession No ML101800156 OFFICE LPWB/PM LPWB/LA EEEB/BC OGC LPWB/BC NAME JWiebe BClayton GWilson AJones SCampbell DATE 6/25/10 6/29/10 6/29/10 7/12/10 7/15/10 OFFICIAL AGENCY RECORD