Letter Sequence Request |
|---|
TAC:ME2731, Clarify Application of Setpoint Methodology for LSSS Functions (Withdrawn, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement, Supplement, Supplement
Results
Other: CNL-14-077, Responses to Degraded Voltage Issue Requests for Additional Information, ML101050203, ML102240630, ML102290358, ML102290360, ML102290361, ML102290362, ML102290363, ML102290364, ML102290365, ML102290366, ML102290367, ML102290368, ML102290383, ML102290384, ML102290385, ML102290386, ML102290387, ML102290388, ML102290389, ML102290390, ML102290391, ML102290392, ML102290403, ML102290404, ML102290405, ML102290406, ML102290407, ML102290408, ML102290409, ML102290410, ML102290411, ML102290414, ML102290439, ML102290440, ML102290441, ML102290442, ML102290443, ML102290444, ML102290445, ML102290446, ML102290447, ML102290448, ML102290458, ML102290459, ML102290460, ML102290461, ML102290462, ML102290463, ML102290464... further results
|
MONTHYEARML0933702752009-11-24024 November 2009 Final Safety Analysis Report, Amendment 95, Cover Letter Project stage: Request ML12192A3682009-12-0909 December 2009 Tennessee Department of Health Public Health Assessment 2009 Project stage: Request ML1001916862010-01-11011 January 2010 Final Safety Analysis Report, Amendment 97, Section 8 - Electric Power Through 8E-12 Project stage: Request ML1001914212010-01-11011 January 2010 Final Safety Analysis Report, Amendment 97 Project stage: Request ML1002204742010-02-0505 February 2010 IP 37002, Construction Refurbishment Process - Watts Bar Unit 2 Project stage: Request ML1005500072010-03-11011 March 2010 Request for Additional Information Related to Licensees Final Safety Analysis Report Amendment 95 Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: RAI ML1007100112010-03-12012 March 2010 OL - List of Documents for Docketing Referenced on Page 5 of the Site Audit Trip Report Project stage: Request ML1010502032010-04-0808 April 2010 Additional Information Regarding Final Safety Analysis Report, Chapter 7, Instrumentation and Controls Review - Requested Common Q Proprietary Documents Project stage: Other ML1010405732010-04-0909 April 2010 Response to NRC Request for Additional Information Regarding Licensees Final Safety Analysis Report (FSAR) Amendment Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: Response to RAI ML1011701022010-04-27027 April 2010 Notice of Meeting with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Submittals Project stage: Request ML1011303512010-05-0505 May 2010 Request for Withholding Information from Public Disclosure (Tac No. ME2731) Project stage: Withholding Request Acceptance ML1016102902010-05-27027 May 2010 Transmittal of Amendment 99 to Final Safety Analysis Report (FSAR) Project stage: Request ML1016203602010-06-17017 June 2010 Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) to Discuss the Complete Status of TVA Hydrology Issues Including the Flooding Effects on the TVA Operating Nuclear Plants Project stage: Request ML1014500842010-06-23023 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Reactor Systems, Nuclear Performance and Code Review, Ansd Plant Systems Project stage: RAI ML1015402502010-06-24024 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Nuclear Performance and Code Review, Plant Systems, and Testing (Tac Nos. ME2731 and ME3091) Project stage: RAI ML1017903992010-06-28028 June 2010 Request for Additional Information (RAI) Regarding Licensees Final Safety Analysis Report Amendment Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: Request ML1016200062010-06-29029 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Nuclear Performance and Code Review (Tac No. ME2731) Project stage: RAI ML1015304742010-07-0202 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Mechanical and Civil Engineering Systems Project stage: RAI ML1016000262010-07-0808 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report, Amendment Related to Quality and Vendor Branch Review Project stage: RAI ML1015303542010-07-12012 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Electrical Engineering Systems Project stage: RAI ML1018001562010-07-15015 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Chapter 8, Electric Power Project stage: RAI ML1020202812010-07-30030 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Chapter 3.11 Project stage: RAI ML1023003322010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-9 (Dwg No. 1-47W611-67-5, R10) Project stage: Other ML1022904662010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-3 (Dwg No. 1-47W845-3, R23) Project stage: Other ML1023003332010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-10 (Dwg No. 1-47W610-67-1, R27) Project stage: Other ML1023003342010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-10 Sh a (Dwg No. 1-47W610-67-1A, R16) Project stage: Other ML1023003352010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-11 (Dwg No. 1-47W610-67-2, R15) Project stage: Other ML1023003432010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-12 Sh a (Dwg No. 1-47W610-67-3A, R7) Project stage: Other ML1023003442010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-13 (Dwg No. 1-47W610-67-4, R17) Project stage: Other ML1023003452010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-11 Sh a (Dwg No. 1-47W610-67-2A, R8) Project stage: Other ML1023003462010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-12 (Dwg No. 1-47W610-67-3, R12) Project stage: Other ML1023003472010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-14 (Dwg No. 1-47W610-67-5, R14) Project stage: Other ML1023003482010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-14 (Dwg No. 1-47W610-67-5A, R2) Project stage: Other ML1023003492010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-16 (Dwg No. 1-47W859-4, R23) Project stage: Other ML1023003502010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-17 (Dwg No. 1-47W859-3, R18) Project stage: Other ML1023003512010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-18 (Dwg No. 1-47W859-2, R36) Project stage: Other ML1023003522010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-19 (Dwg No. 1-47W859-1, R47) Project stage: Other ML1023003602010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-23 (Dwg No. 1-47W611-70-1, R9) Project stage: Other ML1023003612010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-20 (Dwg No. 1-47W610-70-1, R23) Project stage: Other ML1023003622010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-21 (Dwg No. 1-47W610-70-2, R29) Project stage: Other ML1023003632010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-21A (Dwg No. 1-47W610-70-2A, R15) Project stage: Other ML1023003642010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-22 (Dwg No. 1-47W610-70-3, R17) Project stage: Other ML1023003652010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-24 (Dwg No. 1-47W611-70-2, R11) Project stage: Other ML1023003672010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-25 (Dwg No. 1-47W611-70-3, R4) Project stage: Other ML1023003682010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-25A (Dwg No. 1-47W611-70-4, R4) Project stage: Other ML1023003692010-08-0505 August 2010 Final Safety Analysis Report Figure 9.3-1 (Dwg No. 1-47W610-32-1, R15) Project stage: Other ML1023003702010-08-0505 August 2010 Final Safety Analysis Report Figure 9.3-2 (Dwg No. 1-47W610-32-2, R19) Project stage: Other ML1023003732010-08-0505 August 2010 Final Safety Analysis Report Figure 9.3-6 (Dwg No. 1-47W848-1, R24) Project stage: Other ML1022903682010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-14B (Dwg No. 1-45W760-82-1, R17) Project stage: Other ML1022903652010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-7 (Dwg No. 1-45W760-211-9, R16) Project stage: Other 2010-05-05
[Table View] |
Text
Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 August 3, 2011 10 CFR 50.4(b)(6) 10 CFR 50.34(b) 10 CFR 2.390(d)(1)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391
Subject:
Watts Bar Nuclear Plant, Unit 2 - Request for Additional Information (RAI)
Regarding Final Safety Analysis Report Amendment Related Section 3.11 Revised Response (TAC No. ME2731)
Reference:
- 1.
Letter from TVA to NRC, "Watts Bar Nuclear Plant, Unit 2 - Request for Additional Information (RAI) Regarding Final Safety Analysis Report Amendment Related Section 3.11 (TAC No. ME2731)," dated September 1, 2010 [ML102500170]
Reference 1 provided a response to RAI 3.11-2. Enclosure 1 to this letter provides a revised response to RAI 3.11-2.
There are no new regulatory commitments contained in this letter. If you have any questions, please contact Bill Crouch at (423) 365-2004.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 3 rd day of August, 2011.
Respectfully, David Stinson Watts Bar Unit 2 Vice President
U.S. Nuclear Regulatory Commission Page 2 August 3, 2011
Enclosure:
- 1.
Revised Response to RAI 3.11-2 cc (Enclosure):
U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381
ENCLOSUREI Revised Response to RAI 3.11-2 Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 3.11-2 Confirm that equipment being replaced or refurbished will be qualified as Category I as required by 10 CFR 50.49.
Note:
Since only portion e. of the original response is revised, it is the only portion included in this response.
Original Response:
Replaced equipment is being procured qualified to the NUREG-0588, Category 1 requirements.
A small population of components is being refurbished as follows:
- e.
Cables purchased on Contract 81 K5-830078 TVA purchased identical cables under Rockbestos contracts 80K7-826542 and 81 K5-830078. The cable purchased under contract 80K7-826542 was purchased and installed prior to the February 22, 1983, cutoff date stipulated in Regulatory Guide 1.89, Revision 1 for Category II qualification and therefore meets the full Regulatory Guide 1.89 and NUREG-0588 requirements for Category II qualification. Verification of the purchasing and installation documentation for cables purchased under Rockbestos contract 81 K5-830078 has determined that the cables were purchased in 1982 but installed in 1985. In accordance with Regulatory Guide 1.89, Revision 1, Environmental Qualification of Certain Electric Equipment Important to Safety for Nuclear Power Plants, paragraph 6, "Replacement electric equipment installed subsequent to February 22, 1983, must be qualified in accordance with the provisions of 50.49 unless there are sound reasons to the contrary. The NRC staff considers the following to be sound reasons for the use of replacement equipment previously qualified in accordance with the DOR Guidelines or NUREG-0588 in lieu of upgrading...6.c. Identical equipment to be used as a replacement was on hand as part of the utilities stock prior to February 22, 1983." The cable from contract 81 K5-830078 is not "replacement" equipment (i.e., it is new), and it was on hand prior to February 22, 1983, but was installed after 1983. Since the cable from contract 81 K5-830078 is of identical design and the installation of the cable is no different than that supplied on contract 80K7-826542, the cable purchased under contract 81 K5-830078 is considered equally qualified and acceptable under the Category II requirements.
This is documented in EQ Binder WBNEQ-CABL-036.
El-1
ENCLOSUREI Revised Response to RAI 3.11-2 Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 Revised Response:
Replaced equipment is being procured qualified to the NUREG-0588, Category 1 requirements.
A small population of components is being refurbished as follows:
- e.
Cables During verification and validation of Unit 2 EQ cables, it was determined that procurement and installation dates of some Unit 2 EQ cables from WBN contracts do not meet the cutoff dates for procurement (May 23, 1980, as specified in IE Bulletin 79-01B, Supplement 2) and installation (February 22, 1983, as specified in Regulatory Guide 1.89, Revision 1). The approximate number of cables is as follows:
Contract Qty Manufacturer 71 C070005476202 1 cable Triangle-Pwc-lnc.
79K0500824965 8 cables American Insulated Wire Corp 80K0700826542 26 cables Rockbestos Company 81K0500830078 85 cables Rockbestos Company Total 120 Cables These cables were new cables installed in the plant for the first time in Unit 2.
Material purchased on these contracts has been determined to meet the qualification criteria of NUREG-0588 Category II using the guidelines established in IEEE 323-1971.
Material purchased on contracts 71 C070005476202, 79K0500824965, and 80K0700826542 was purchased prior to May 23, 1980, and was on hand as part of TVA stock before February 22, 1983. However, this material was not installed in Unit 2 until the 1983 to 1985 time frame. Material from each of these contracts was installed at other TVA facilities prior to the February 22, 1983, date and is in full compliance with the qualification criteria of 10 CFR 50.49 as documented in site EQ Qualification Binders. Unit 2 material from these contracts is considered equally qualified as those at other TVA facilities.
Material purchased on contract 81 K0500830078 was purchased after May 23, 1980, but was received as part of TVA stock before February 22, 1983. However, this material was not installed in Unit 2 until the 1983 to 1985 time frame. Material from this contract was considered identical design, and the installation of the cable is no different than that supplied on contract 80K0700826542.
E1-2
ENCLOSURE1 Revised Response to RAI 3.11-2 Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 In accordance with C.6 of Regulatory Guide 1.89, Revision 1 (Environmental Qualification of Certain Electric Equipment Important to Safety for Nuclear Power Plants), "Replacement electric equipment installed subsequent to February 22, 1983, must be qualified in accordance with the provisions of 50.49 unless there are sound reasons to the contrary. The NRC staff considers the following to be sound reasons for the use of replacement equipment previously qualified in accordance with the DOR Guidelines or NUREG-0588 in lieu of upgrading:... c. Identical equipment to be used as a replacement was on hand as part of the utility's stock prior to February 22, 1983."
These cables were on hand as part of TVA stock before February 22, 1983, and the material was equal to material installed and qualified at other TVA facilities prior to February 22, 1983. Therefore, TVA chose not to upgrade these cables to Category I requirement when installing them in the 1983 to 1985 time frame.
There are approximately 3,700 EQ cables installed for Unit 2. Therefore, these approxmately 120 cables represent a small percentage of the total EQ cables installed in Unit 2. Should these cables require replacement in the future, TVA will follow our internal design criteria and thus comply with NUREG-0588 and replace the cables with material that meets the qualification criteria of NUREG-0588 Category I using the guidelines established in IEEE 323-1974.
E1-3