Letter Sequence RAI |
---|
|
Results
Other: CNL-14-077, Responses to Degraded Voltage Issue Requests for Additional Information, ML102290358, ML102290360, ML102290361, ML102290362, ML102290363, ML102290364, ML102290365, ML102290366, ML102290367, ML102290368, ML102290383, ML102290384, ML102290385, ML102290386, ML102290387, ML102290388, ML102290389, ML102290390, ML102290391, ML102290392, ML102290403, ML102290404, ML102290405, ML102290406, ML102290407, ML102290408, ML102290409, ML102290410, ML102290411, ML102290414, ML102290439, ML102290440, ML102290441, ML102290442, ML102290443, ML102290444, ML102290445, ML102290446, ML102290447, ML102290448, ML102290458, ML102290459, ML102290460, ML102290461, ML102290462, ML102290463, ML102290464, ML102290465, ML102290466... further results
|
MONTHYEARML1001916862010-01-11011 January 2010 Final Safety Analysis Report, Amendment 97, Section 8 - Electric Power Through 8E-12 Project stage: Request ML1005500072010-03-11011 March 2010 Request for Additional Information Related to Licensee'S Final Safety Analysis Report Amendment 95 Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: RAI ML1010405732010-04-0909 April 2010 Response to NRC Request for Additional Information Regarding Licensee'S Final Safety Analysis Report (FSAR) Amendment Related to Section 4.2.2, Reactor Vessel Internal Components. Project stage: Response to RAI ML1011303512010-05-0505 May 2010 Request for Withholding Information from Public Disclosure (Tac No. ME2731) Project stage: Withholding Request Acceptance ML1014500842010-06-23023 June 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report Amendment Related to Reactor Systems, Nuclear Performance and Code Review, Ansd Plant Systems Project stage: RAI ML1015402502010-06-24024 June 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report Amendment Related to Nuclear Performance and Code Review, Plant Systems, and Testing (Tac Nos. ME2731 and ME3091) Project stage: RAI ML1017903992010-06-28028 June 2010 Request for Additional Information (RAI) Regarding Licensee'S Final Safety Analysis Report Amendment Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: Request ML1016200062010-06-29029 June 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report Amendment Related to Nuclear Performance and Code Review (Tac No. ME2731) Project stage: RAI ML1015304742010-07-0202 July 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report Amendment Related to Mechanical and Civil Engineering Systems Project stage: RAI ML1016000262010-07-0808 July 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report, Amendment Related to Quality and Vendor Branch Review Project stage: RAI ML1015303542010-07-12012 July 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report Amendment Related to Electrical Engineering Systems Project stage: RAI ML1018001562010-07-15015 July 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report Amendment Related to Chapter 8, Electric Power Project stage: RAI ML1023003272010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-4A (Dwg No. 1-47W845-5, R38) Project stage: Other ML1022904652010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-2 (Dwg No. 1-47W845-2, R76) Project stage: Other ML1023003282010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-4B (Dwg No. 1-47W845-7, R14) Project stage: Other ML1023003292010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-5 (Dwg No. 1-47W611-67-1, R8) Project stage: Other ML1023003302010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-6 (Dwg No. 1-47W611-67-2, R5) Project stage: Other ML1023003312010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-8 (Dwg No. 1-47W611-67-4, R5) Project stage: Other ML1023003322010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-9 (Dwg No. 1-47W611-67-5, R10) Project stage: Other ML1023003332010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-10 (Dwg No. 1-47W610-67-1, R27) Project stage: Other ML1023003342010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-10 Sh a (Dwg No. 1-47W610-67-1A, R16) Project stage: Other ML1023003352010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-11 (Dwg No. 1-47W610-67-2, R15) Project stage: Other ML1023003432010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-12 Sh a (Dwg No. 1-47W610-67-3A, R7) Project stage: Other ML1023003442010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-13 (Dwg No. 1-47W610-67-4, R17) Project stage: Other ML1023003452010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-11 Sh a (Dwg No. 1-47W610-67-2A, R8) Project stage: Other ML1023003462010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-12 (Dwg No. 1-47W610-67-3, R12) Project stage: Other ML1023003472010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-14 (Dwg No. 1-47W610-67-5, R14) Project stage: Other ML1023003482010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-14 (Dwg No. 1-47W610-67-5A, R2) Project stage: Other ML1023003492010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-16 (Dwg No. 1-47W859-4, R23) Project stage: Other ML1023003502010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-17 (Dwg No. 1-47W859-3, R18) Project stage: Other ML1023003512010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-18 (Dwg No. 1-47W859-2, R36) Project stage: Other ML1023003522010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-19 (Dwg No. 1-47W859-1, R47) Project stage: Other ML1023003602010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-23 (Dwg No. 1-47W611-70-1, R9) Project stage: Other ML1023003612010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-20 (Dwg No. 1-47W610-70-1, R23) Project stage: Other ML1023003622010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-21 (Dwg No. 1-47W610-70-2, R29) Project stage: Other ML1023003632010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-21A (Dwg No. 1-47W610-70-2A, R15) Project stage: Other ML1023003642010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-22 (Dwg No. 1-47W610-70-3, R17) Project stage: Other ML1023003652010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-24 (Dwg No. 1-47W611-70-2, R11) Project stage: Other ML1023003672010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-25 (Dwg No. 1-47W611-70-3, R4) Project stage: Other ML1023003682010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-25A (Dwg No. 1-47W611-70-4, R4) Project stage: Other ML1023003692010-08-0505 August 2010 Final Safety Analysis Report Figure 9.3-1 (Dwg No. 1-47W610-32-1, R15) Project stage: Other ML1022903652010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-7 (Dwg No. 1-45W760-211-9, R16) Project stage: Other ML1023003972010-08-0505 August 2010 Final Safety Analysis Report Figure 9.5-25A (Dwg No. 1-47W610-82-2, R7) Project stage: Other ML1023003982010-08-0505 August 2010 Final Safety Analysis Report Figure 9.5-25B (Dwg No. 1-47W610-82-3, R7) Project stage: Other ML1023003992010-08-0505 August 2010 Final Safety Analysis Report Figure 9.5-25C (Dwg No. 1-47W610-82-4, R7) Project stage: Other ML1022903682010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-14B (Dwg No. 1-45W760-82-1, R17) Project stage: Other ML1022903672010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-9 (Dwg No. 1-45W760-211-11, R13) Project stage: Other ML1022903662010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-8 (Dwg No. 1-45W760-211-10, R12) Project stage: Other ML1022903622010-08-0505 August 2010 Final Safety Analysis Report Figure 8.1-3 (Dwg No. 1-45W700-1, R28) Project stage: Other ML1022903582010-08-0505 August 2010 Final Safety Analysis Report Figure 8.1.2 (Dwg No. 1-15E500-1, R31) Project stage: Other 2010-06-28
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000390/20250102024-11-0404 November 2024 Notification of an NRC (FPTI) (NRC Inspection Report 05000390/2025010 0500039/ 2025010) (RFI) CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter 05000391/LER-2024-003, Inoperability of Both Trains of Unit 2 Low Head Safety Injection2024-07-11011 July 2024 Inoperability of Both Trains of Unit 2 Low Head Safety Injection ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000391/LER-2024-002, Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO2024-05-0606 May 2024 Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report 05000391/LER-2024-001, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-03-27027 March 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) 2024-09-05
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24309A0552024-11-0101 November 2024 NRR E-mail Capture - Request for Additional Information - TVA LAR to Revised Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 Re TS Table 3.3.2-1, Function 5 ML24304A3752024-10-29029 October 2024 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) to Revise Watts Bar Updated Final Safety Analysis Report (UFSAR) for Hydrologic Analysis ML24260A0322024-09-10010 September 2024 NRR E-mail Capture - Request for Additional Information Regarding the Watts Bar Unit 2 Steam Generator Tube Inspection Report for U2R5 ML24155A1372024-05-29029 May 2024 Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24045A0312024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23030A3512023-01-25025 January 2023 Notification of Watts Bar Nuclear Plant - Design Bases Assurance Inspection (Programs) and Initial Information Request ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency Plans ML22115A1402022-04-25025 April 2022 NRR E-mail Capture - Requests for Confirmation of Information and Additional Information Regarding Watts Bar Nuclear Plant, Unit 2 Exemption Request Re 10 CFR Part 26 (L-2022-LLE-0017) ML22083A2372022-03-24024 March 2022 NRR E-mail Capture - Request for Additional Information and Confirmation of Information Related to Tva'S Request for Changes to Watts Bar Nuclear Plant, Units 1 and 2, Technical Specification 3.7.8 ML22056A3802022-02-25025 February 2022 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2022-02 ML21267A1392021-09-23023 September 2021 Document Request for Upcoming RP Inspection at Watts Bar ML21221A2602021-08-0909 August 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Watts Bar, Unit 1 Tech Specs Related to Continuous Opening of the Auxiliary Building Secondary Containment Enclosure Boundary ML21102A1312021-04-19019 April 2021 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Unit 1 ML21095A0422021-04-0202 April 2021 NRR E-mail Capture - Added Clarification to RAI 2 for Thot LAR ML21095A0402021-04-0202 April 2021 NRR E-mail Capture - Request for Additional Information Re Generic Letter 95-05 90-Day Report and LAR to Adjust Growth Rate for Thot (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21091A0772021-04-0101 April 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program ML21095A0412021-04-0101 April 2021 NRR E-mail Capture - Revised Draft RAI - Combined RAI Set for Watts Bar Unit 2 90-Day Report and Thot LAR (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21095A0442021-04-0101 April 2021 NRR E-mail Capture - Revised Draft RAI - Combined RAI Set for Watts Bar Unit 2 90-Day Report and Thot LAR (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21095A0462021-03-22022 March 2021 NRR E-mail Capture - Draft Request for Additional Information Regarding Tva'S Generic Letter 95-05 90-Day Report for Watts Bar Unit 2 ML21039A6402021-02-0808 February 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar Nuclear Plant, Unit 1 Technical Specifications Related to Steam Generator Tube Inspection Frequency ML21012A2032021-01-11011 January 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar UFSAR to Use Alternate Probability of Detection ML20350B5592020-12-15015 December 2020 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Adopt Traveler TSTF-490 Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML20338A3202020-12-0303 December 2020 Notification of an NRC Fire Protection Team Inspection (NRC Inspection Report 05000390/2021011 and 05000391/2021011) and Request for Information ML20322A4412020-11-17017 November 2020 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise TS 3.7.11 Related to the MCR Chiller Replacement ML20322A4392020-11-0505 November 2020 NRR E-mail Capture - Draft Request for Additional Information Regarding Tva'S Request to Revise TS 3.7.11 Related to the MCR Chiller Replacement ML20308A3512020-11-0202 November 2020 Request for Additional Information on WBN Request for Exemption from 10 CFR Part 73, Appendix B, Section VI for the Conduct of an Annual Force-on-Force Exercise (EPID L-2020-LLE-0165 (COVID-19)) ML20253A1782020-09-0909 September 2020 Emergency Preparedness Program Inspection Request for Information ML20266G4592020-08-14014 August 2020 Notification of Inspection and Request for Information ML20196L8622020-07-14014 July 2020 NRR E-mail Capture - Watts Bar Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Request to Implement the Full Spectrum LOCA Methodology ML20086G4802020-03-26026 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) - Part 2 ML20085G3572020-03-25025 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML20084M1942020-03-24024 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML20083J3952020-03-12012 March 2020 NRR E-mail Capture - Draft Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML19340A6842019-12-0505 December 2019 NRR E-mail Capture - Request for Additional Information for WBN2 Request for One-Time Extension of Completion Time for TS 3.7.8 (L-2019-LLA-0020) ML19218A0302019-08-0505 August 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Second-Round Request for Additional Information Related to Application to Revise Technical Specifications Regarding DC Electrical Systems, TSTF-500, Revision 2 ML19218A0282019-07-25025 July 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Draft Second-Round Request for Additional Information Related to Application to Revise Technical Specifications Regarding DC Electrical Systems, TSTF-500, Revision 2 ML19186A4352019-07-0505 July 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Correction to Final Request for Additional Information Related to Application to Adopt 10 CFR 50.69 ML19169A3592019-06-18018 June 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Final Request for Additional Information Related to Application to Adopt 10 CFR 50.69 ML19148A7912019-05-28028 May 2019 NRR E-mail Capture - Sequoyah Nuclear Plant and Watts Bar Nuclear Plant - Final Request for Additional Information Related to Request for Alternative to OM Code Requirements ML19106A0462019-04-15015 April 2019 NRR E-mail Capture - Watts BAR, Units 1 and 2 Request for Additional Informatin (RAI) Regarding Changes to Technical Specifications Sections 3.8.1, 3.8.7, 3.8.8, and 3.8.9 ML19071A3542019-03-0808 March 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Final Request for Additional Information Related to Request to Adopt TSTF-425 to Relocate Specific Surveillance Frequency Requirements to Licensee-Controlled Program ML18313A2202018-11-0707 November 2018 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML18282A6372018-10-0909 October 2018 NRR E-mail Capture - RAIs (Final) - LAR to Revise the Steam Generator Technical Specifications for Watts Bar Nuclear Plant, Unit 2 ML18270A2362018-09-26026 September 2018 NRR E-mail Capture - Watts Bar Units 1 and 2 RAIs - Modify TS 3.8.9 Completion Time for Inoperable 120V AC Vital Buses (L-2018-LLA-0050) 2024-09-10
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 27, 2010 Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 SUB~IECT: WATTS BAR NUCLEAR PLANT, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSEE'S FINAL SAFETY ANALYSIS REPORT AMENDMENT RELATED TO CHAPTERS 11, "RADIOACTIVE WASTE MANAGEMENT" AND 12, "RADIATION PROTECTION" (TAC NO. ME2731)
Dear Mr. Bhatnagar:
By letters dated November 24, and, December 14, 2009, January 11, May 7, and May 17, 2010, Tennessee Valley Authority (TVA) submitted Final Safety Analysis Report Amendments 95,96, 97, 98, and 99, respectively. Bye-mails dated March 23 and 25, 2010 (Agency Document and Management System Accession numbers ML100820104 and ML100840083), the NRC staff transmitted preliminary requests for additional information. By letters dated June 3, and July 31, 2010 TVA responded to some of the requests. Some of the staff concerns with the June 3, response were discussed during the July 20,2010, public meeting and, unless resolved, are included in the enclosed request. The enclosed request for additional information numbering scheme is consistent with the numbering scheme of the original requests.
To support Nuclear Regulatory Commission staff review schedules, a response is required within 14 days of receipt of this letter.
If you should have any questions, please contact me at 301-415-6606.
Sincerely, oel S. Wiebe, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosure:
RAI cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION WATTS BAR NUCLEAR PLANT, UNIT 2 FINAL SAFETY ANALYSIS REPORT CHAPTERS 11 AND 12 TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-391 By letters dated November 24, 2009 (Agencywide Document and Management System Accession No. ML093370274), December 14, 2009 (ML093570464), and January 11, 2010 (ML100191426), May 7,2010 (ML101340795), May 17,2010 (ML101610291) Tennessee Valley Authority (TVA) submitted Final Safety Analysis Report (FSAR) Amendments 95,96,97, 98, and 99, respectively. The following additional information related to Chapters 11, "Radioactive Waste Management" and 12, "Radiation Protection" is required to proceed with our review.
Chapter 11 RAI # 11.4-1 The response to question 11.4-1, the July 31,2010, submittal, states that "the Steam Generator (SG) Blowdown Liquid Sample Monitor was isolated in Unit 1 by DCN 29903. Monitor RE-90-124 was to be used solely to determine which SG has a leak during an SG Tube Rupture event. In place of the monitor, grab samples provide a quicker determination." Describe how the routine Watts Bar Unit 2 SG blowdown will be monitored for radiological releases.
Chapter 12 RAI #5.b:
Amendment 88 indicated that the normal operating source term was based on American National Standards Institute document 18.1 1984 (Rev. 1). Amendment 97 revised this description to make a distinction between the normal operating design source term (now referencing ANSI 18.1 Rev. 0, 1976) and the "Current operational radiation levels," based on ANSI 18.1 Rev.1. Clarify and explain the purpose of this distinction.
RAI#6:
The response to RAI # 6 is unresponsive to the request. Provide layout drawings indicating access and egress routes to vital areas of the plant and their associated radiation zones under accident conditions.
RAI#7:
The response to RAI # 7 is unresponsive to the request. In lieu of layout drawings as requested (consistent with Section 12.3.1 of Regulatory Guide 1.70), identify which of the following radiation protection facilities are common to Watts Bar Unit 1 and indicate whether they are sized and situated properly to support two operating units. The facilities are:
-2
- 1. Controlled access areas,
- 2. personnel and equipment decontamination,
- 3. contamination control areas,
- 4. in plant traffic patterns to radiologically controlled areas,
- 5. health physics facilities (including dosimetry issue and maintenance, respiratory protection issue and maintenance, in-vivo and in-vitro bioassay, protective clothing and radiation survey instrument issue, Radiation Protection Manager and technical staff office/work space),
- 6. onsite laboratory for analysis of chemical and radiological samples, and
- 7. radiological counting room.
For each of these facilities not shared with Unit 1, demonstrate they are sized and situated properly to support Unit 2 operation.
RAI#8:
Amendment 97 changed Section 12.3.4.1.3 (page 12.3-19) to revise frequency of Channel Operability Tests (COT) from quarterly to "periodically." The response to the question concerning the basis for setting the COT frequency refers to the TS Bases SR 3.3.6.4 (which states every "92 days") and the Unit 1 FSAR Change Package 1617, which was attached.
However, the Change Package 1617 clearly states that the intent of the change is to allow a COT interval of 18 months, the acceptability of which is claimed to be demonstrated by the enclosed calculation WBN-EEB-EDQ 1090-99005.
The staff position is that WBN-EEB-EDQ 1090-99005 does not provide an adequate basis for increasing the COT interval from 3 to 18 months. The calculation does not pass its own acceptance criteria since one of the 41 randomly selected samples was found outside the "as left" response band (see # 4 below). Since the data population used was limited to the 1998/1999 surveillances, this calculation only demonstrates that there is a 95/95 confidence that any of the other 33 monitor 1998/1999 test results will also be within the "as left" response band, even if the one monitor found outside the band is ignored. To demonstrate that these monitors will be within the "as left" band over an extended period of time (e.g., 18 months) more than six consecutive COT results for each monitor (preferably covering the entire Unit 1 operating history
- see # 2 below) would have to be included in the study population. Provide a calculation based on an appropriate statistical method and comprehensive data set to demonstrate monitor stability over an 18 month COT interval.
The following issues also need additional clarification.
- 1. Provide a copy of G29 P.S. 4M.4.1 (R6) and demonstrate that it is an acceptable statistical methodology for evaluating monitor testing frequency.
- 2. The data used in this calculation is limited to a single surveillance (slice in time - circa 1998/1998) for each monitor of interest. No justification for the restricted data selection is given. It would be more appropriate to use the entire COT history for each monitor for this evaluation.
- 3. The "Random Selection" of 41 monitors from the population of 74 monitors, as depicted in Table 1, doesn't appear to be random at all.
- 4. The last paragraph on page 6 of the calculation indicates that in order to demonstrate "with a 95/95 probability and confidence that the attribute of interest is indicative of the population," all 41 randomly selected surveillances must have met the acceptance
-3 criteria (e.g., that the monitors "as found" are within the surveillance "as left" tolerance band). However, the text at the bottom of page 7 indicates that 1 of the 41 monitors was not found within the "as left" band. Justify why this data point, which was slightly outside the acceptance criteria, was jUdged to be within the criteria.
- 5. It is unclear what the current COT interval is for the "raw water system and non VX-252 local indicators." What is Alternate Review (Ref. 7)?
RAI # 10:
The response to Question # 10 subparts a., c., and e., do not clearly indicate the capabilities of the airborne monitoring system as revised by Amendment 97. Consistent with the acceptance criteria for Section 12.3.4.b, of the Standard Review Plan (NUREG 0800), verify that the airborne radioactivity monitoring system for Watts Bar Unit 2 is capable of the following;
- 1. The monitoring system should be capable of detecting 10 maximum permissible concentration hours increase in particulate and iodine radioactivity from any compartment that has a possibility of containing airborne radioactivity and that normally may be occupied by personnel.
- 2. Each monitor location has a local audible alarm (and, or visual alarms for monitors located in high-noise areas) and variable alarm set points.
- 3. Readout and annunciation of each monitor are provided in the control room.
- 4. Emergency power is initiated after loss of offsite power.
RAI # 13:
The first part of this response is acceptable. However, the response goes on to modify the stated position with a discussion of a commitment to ANSII American Nuclear Society guidance document ANSI/ANS 3.1-1981. The following text in the response, listed as paragraph C from SPP-5, is not completely consistent with ANSI/ANS 3.1-1981, and is not acceptable to the staff.
Specifically, contrary to the ANSI criteria, paragraph C.
- 1. does not specify that the 5 years of applied radiation protection experience be professional experience, and
- 2. allows individuals that do not meet the qualification criteria to be temporarily assigned to fill the radiation protection manager position.
August 27, 2010 Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
WADS BAR NUCLEAR PLANT, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSEE'S FINAL SAFETY ANALYSIS REPORT AMENDMENT RELATED TO CHAPTERS 11, "RADIOACTIVE WASTE MANAGEMENT" AND 12, "RADIATION PROTECTION" (TAC NO. ME2731)
Dear Mr. Bhatnagar:
By letters dated November 24, and December 14, 2009, January 11, May 7, and May 17, 2010, Tennessee Valley Authority (TVA) submitted Final Safety Analysis Report Amendments 95, 96, 97,98, and 99, respectively. Bye-mails dated March 23 and 25, 2010 (Agency Document and Management System Accession numbers ML100820104 and ML100840083), the NRC staff transmitted preliminary requests for additional information. By letters dated June 3, and July 31, 2010, TVA responded to some of the requests. Some of the staff concerns with the June 3, response were discussed during the July 20,2010, public meeting and, unless resolved, are included in the enclosed request. The enclosed request for additional information numbering scheme is consistent with the numbering scheme of the original requests.
To support Nuclear Regulatory Commission staff review schedules, a response is required within 14 days of receipt of this letter.
If you should have any questions, please contact me at 301-415-6606.
Sincerely, IRA!
Joel S. Wiebe, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosure:
RAI cc w/encl: Distribution via Listserv DISTRIBUTION: RidsOgcRp Resource RidsRgn2MailCenter Resource PUBLIC RidsNrrDorlLpwb Resource RidsNrrDeEeeb Resource LPWB Reading File RidsNrrLABClayton Resource RidsNrrPMWattsBar2 Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDoriDpr ADAMS Accession No ML102360201 NRR-088 OFFICE LPWB/PM LPWB/LA OGC NLO LPWB/BC NAME JWiebe BClayton DRoth SCampbell DATE 08/25/10 08/25/10 08/26/10 08/27/10 OFFICIAL AGENCY RECORD