Answers Results Other: CNL-14-077, Responses to Degraded Voltage Issue Requests for Additional Information, ML102290358, ML102290360, ML102290361, ML102290362, ML102290363, ML102290364, ML102290365, ML102290366, ML102290367, ML102290368, ML102290383, ML102290384, ML102290385, ML102290386, ML102290387, ML102290388, ML102290389, ML102290390, ML102290391, ML102290392, ML102290403, ML102290404, ML102290405, ML102290406, ML102290407, ML102290408, ML102290409, ML102290410, ML102290411, ML102290414, ML102290439, ML102290440, ML102290441, ML102290442, ML102290443, ML102290444, ML102290445, ML102290446, ML102290447, ML102290448, ML102290458, ML102290459, ML102290460, ML102290461, ML102290462, ML102290463, ML102290464, ML102290465, ML102290466... further results | |
MONTHYEARML1001916862010-01-11011 January 2010
[Table View]Final Safety Analysis Report, Amendment 97, Section 8 - Electric Power Through 8E-12 Project stage: Request ML1005500072010-03-11011 March 2010 Request for Additional Information Related to Licensee'S Final Safety Analysis Report Amendment 95 Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: RAI ML1010405732010-04-0909 April 2010 Response to NRC Request for Additional Information Regarding Licensee'S Final Safety Analysis Report (FSAR) Amendment Related to Section 4.2.2, Reactor Vessel Internal Components. Project stage: Response to RAI ML1011303512010-05-0505 May 2010 Request for Withholding Information from Public Disclosure (Tac No. ME2731) Project stage: Withholding Request Acceptance ML1014500842010-06-23023 June 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report Amendment Related to Reactor Systems, Nuclear Performance and Code Review, Ansd Plant Systems Project stage: RAI ML1015402502010-06-24024 June 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report Amendment Related to Nuclear Performance and Code Review, Plant Systems, and Testing (Tac Nos. ME2731 and ME3091) Project stage: RAI ML1017903992010-06-28028 June 2010 Request for Additional Information (RAI) Regarding Licensee'S Final Safety Analysis Report Amendment Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: Request ML1016200062010-06-29029 June 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report Amendment Related to Nuclear Performance and Code Review (Tac No. ME2731) Project stage: RAI ML1015304742010-07-0202 July 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report Amendment Related to Mechanical and Civil Engineering Systems Project stage: RAI ML1016000262010-07-0808 July 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report, Amendment Related to Quality and Vendor Branch Review Project stage: RAI ML1015303542010-07-12012 July 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report Amendment Related to Electrical Engineering Systems Project stage: RAI ML1018001562010-07-15015 July 2010 Request for Additional Information Regarding Licensee'S Final Safety Analysis Report Amendment Related to Chapter 8, Electric Power Project stage: RAI ML1023003272010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-4A (Dwg No. 1-47W845-5, R38) Project stage: Other ML1022904652010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-2 (Dwg No. 1-47W845-2, R76) Project stage: Other ML1023003282010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-4B (Dwg No. 1-47W845-7, R14) Project stage: Other ML1023003292010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-5 (Dwg No. 1-47W611-67-1, R8) Project stage: Other ML1023003302010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-6 (Dwg No. 1-47W611-67-2, R5) Project stage: Other ML1023003312010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-8 (Dwg No. 1-47W611-67-4, R5) Project stage: Other ML1023003322010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-9 (Dwg No. 1-47W611-67-5, R10) Project stage: Other ML1023003332010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-10 (Dwg No. 1-47W610-67-1, R27) Project stage: Other ML1023003342010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-10 Sh a (Dwg No. 1-47W610-67-1A, R16) Project stage: Other ML1023003352010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-11 (Dwg No. 1-47W610-67-2, R15) Project stage: Other ML1023003432010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-12 Sh a (Dwg No. 1-47W610-67-3A, R7) Project stage: Other ML1023003442010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-13 (Dwg No. 1-47W610-67-4, R17) Project stage: Other ML1023003452010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-11 Sh a (Dwg No. 1-47W610-67-2A, R8) Project stage: Other ML1023003462010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-12 (Dwg No. 1-47W610-67-3, R12) Project stage: Other ML1023003472010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-14 (Dwg No. 1-47W610-67-5, R14) Project stage: Other ML1023003482010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-14 (Dwg No. 1-47W610-67-5A, R2) Project stage: Other ML1023003492010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-16 (Dwg No. 1-47W859-4, R23) Project stage: Other ML1023003502010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-17 (Dwg No. 1-47W859-3, R18) Project stage: Other ML1023003512010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-18 (Dwg No. 1-47W859-2, R36) Project stage: Other ML1023003522010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-19 (Dwg No. 1-47W859-1, R47) Project stage: Other ML1023003602010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-23 (Dwg No. 1-47W611-70-1, R9) Project stage: Other ML1023003612010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-20 (Dwg No. 1-47W610-70-1, R23) Project stage: Other ML1023003622010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-21 (Dwg No. 1-47W610-70-2, R29) Project stage: Other ML1023003632010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-21A (Dwg No. 1-47W610-70-2A, R15) Project stage: Other ML1023003642010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-22 (Dwg No. 1-47W610-70-3, R17) Project stage: Other ML1023003652010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-24 (Dwg No. 1-47W611-70-2, R11) Project stage: Other ML1023003672010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-25 (Dwg No. 1-47W611-70-3, R4) Project stage: Other ML1023003682010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-25A (Dwg No. 1-47W611-70-4, R4) Project stage: Other ML1023003692010-08-0505 August 2010 Final Safety Analysis Report Figure 9.3-1 (Dwg No. 1-47W610-32-1, R15) Project stage: Other ML1022903652010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-7 (Dwg No. 1-45W760-211-9, R16) Project stage: Other ML1023003972010-08-0505 August 2010 Final Safety Analysis Report Figure 9.5-25A (Dwg No. 1-47W610-82-2, R7) Project stage: Other ML1023003982010-08-0505 August 2010 Final Safety Analysis Report Figure 9.5-25B (Dwg No. 1-47W610-82-3, R7) Project stage: Other ML1023003992010-08-0505 August 2010 Final Safety Analysis Report Figure 9.5-25C (Dwg No. 1-47W610-82-4, R7) Project stage: Other ML1022903682010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-14B (Dwg No. 1-45W760-82-1, R17) Project stage: Other ML1022903672010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-9 (Dwg No. 1-45W760-211-11, R13) Project stage: Other ML1022903662010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-8 (Dwg No. 1-45W760-211-10, R12) Project stage: Other ML1022903622010-08-0505 August 2010 Final Safety Analysis Report Figure 8.1-3 (Dwg No. 1-45W700-1, R28) Project stage: Other ML1022903582010-08-0505 August 2010 Final Safety Analysis Report Figure 8.1.2 (Dwg No. 1-15E500-1, R31) Project stage: Other 2010-06-28 |
ML14015A452 | |
Person / Time | |
---|---|
Site: | Watts Bar |
Issue date: | 01/16/2014 |
From: | Justin Poole Plant Licensing Branch II |
To: | Jessie Quichocho Plant Licensing Branch II |
Poole J NRR/DORL/LPL2-2 | |
References | |
Download: ML14015A452 (4) | |
Similar Documents at Watts Bar | |
---|---|
Category:Meeting Agenda
MONTHYEARPMNS20241383, Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 22024-11-0707 November 2024
[Table view]Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 2 PMNS20241229, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 22024-10-0303 October 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 ML24228A2312024-08-15015 August 2024 TVA Meeting Slides for August 19 Public Meeting Re QAPD Supplement ML24225A2542024-08-14014 August 2024 August 14, 2024 - TVA Pre-Sub Meeting Presentation - Sequoyah, Units 1 and 2; Watts Bar, Units 1 and 2 - License Amendment Request to Revise TS 3.5.2 ECCS - Operating PMNS20240978, Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant and Watts Bar Nuclear Plant License Amendment Request to Revise Technical Specs 3.5.2, Note 1 Related to the Residual Heat Removal System2024-08-13013 August 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant and Watts Bar Nuclear Plant License Amendment Request to Revise Technical Specs 3.5.2, Note 1 Related to the Residual Heat Removal System PMNS20241000, Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program2024-08-0606 August 2024 Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program PMNS20240831, Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program2024-06-24024 June 2024 Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program PMNS20240663, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specifications2024-05-0909 May 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specifications PMNS20240568, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specifications2024-04-24024 April 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specifications PMNS20240350, Annual Assessment Virtual Public Meeting2024-03-11011 March 2024 Annual Assessment Virtual Public Meeting PMNS20240344, Annual Assessment Public Poster Session and Open House Meeting2024-03-0707 March 2024 Annual Assessment Public Poster Session and Open House Meeting ML24044A0872024-02-14014 February 2024 TVA Slides - Watts Bar Nuclear Plant Pre-Submittal Meeting for License Amendment Request to Revise TS 3.7.11, Main Control Room Area Chilled Water System PMNS20240088, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant Technical Specifications2024-01-30030 January 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant Technical Specifications PMNS20231329, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants2023-11-28028 November 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants PMNS20231126, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 22023-10-18018 October 2023 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 ML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides PMNS20231024, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 22023-09-18018 September 2023 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 2 PMNS20230916, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 22023-08-31031 August 2023 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 2 ML23178A0832023-07-10010 July 2023 Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs PMNS20230795, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 22023-06-30030 June 2023 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 2 PMNS20230712, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants2023-06-12012 June 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants PMNS20230549, Annual Assessment Virtual Meeting for the 2022 Assessment Period2023-04-25025 April 2023 Annual Assessment Virtual Meeting for the 2022 Assessment Period PMNS20230446, Annual Assessment Public Poster Session and Openhouse Meeting2023-04-17017 April 2023 Annual Assessment Public Poster Session and Openhouse Meeting ML23044A5182023-02-15015 February 2023 Pre-Submittal Meeting Slides for Expedited License Amendment Request Re Main Control Room Chiller Completion Time Extension ML23041A3562023-02-15015 February 2023 February 15, 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension (EPID L-2022-LRM-0098) (Slides) PMNS20230127, Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, to Increase the Allowable Number of Tritium Producing Burnable Absorber Rods2023-02-13013 February 2023 Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, to Increase the Allowable Number of Tritium Producing Burnable Absorber Rods PMNS20221292, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request2023-01-11011 January 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request ML22318A1042022-11-14014 November 2022 Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide Presentation PMNS20221152, Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 22022-11-0303 November 2022 Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 2 PMNS20220956, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request2022-09-20020 September 2022 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request PMNS20220531, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah and Watts Bar Nuclear Plants2022-05-19019 May 2022 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah and Watts Bar Nuclear Plants PMNS20220379, Meeting with Tennessee Valley Authority to Discuss a Proposed Exemption Request for Watts Bar Nuclear Plant, Unit 22022-04-0808 April 2022 Meeting with Tennessee Valley Authority to Discuss a Proposed Exemption Request for Watts Bar Nuclear Plant, Unit 2 PMNS20220314, Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Sequoyah and Watts Bar Nuclear Plants2022-03-31031 March 2022 Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Sequoyah and Watts Bar Nuclear Plants PMNS20220285, Annual Assessment Meeting2022-03-29029 March 2022 Annual Assessment Meeting PMNS20211575, Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 1, Proposed License Amendment Request2022-01-18018 January 2022 Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 1, Proposed License Amendment Request PMNS20211571, Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Units 1 and 2, Tritium Producing Burnable Absorption Rods2022-01-0606 January 2022 Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Units 1 and 2, Tritium Producing Burnable Absorption Rods PMNS20211507, Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Capsule Withdrawal2021-12-0101 December 2021 Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Capsule Withdrawal ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) PMNS20211154, Meeting with Tennessee Valley Authority Regarding a Proposed Fleet Amendment Request2021-09-21021 September 2021 Meeting with Tennessee Valley Authority Regarding a Proposed Fleet Amendment Request PMNS20211126, Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 22021-09-0808 September 2021 Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2 ML21231A0972021-08-18018 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed LAR Regarding Application to Modify Watts Bar Units 1 and 2 Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board Cleaning PMNS20210945, Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 22021-08-0606 August 2021 Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2 PMNS20211003, Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Units 1 and 22021-08-0505 August 2021 Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Units 1 and 2 PMNS20210829, Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 22021-07-12012 July 2021 Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2 ML21189A0982021-07-0808 July 2021 Teleconference with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, PMNS20210702, Closed Meeting with Representatives from the Tennessee Valley Authority to Discuss a Planned Request for Exemption2021-05-25025 May 2021 Closed Meeting with Representatives from the Tennessee Valley Authority to Discuss a Planned Request for Exemption ML21117A1582021-04-27027 April 2021 Teleconference with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Units 1 and 2, Proposed License Amendment Request PMNS20210392, Annual Assessment Meeting2021-04-12012 April 2021 Annual Assessment Meeting ML21096A1312021-04-0707 April 2021 Pre-submittal Meeting for Inservice Testing (IST) Program Request for One-Time Extension of Test Frequency of WBN Unit 1 Group 6 Relief Valves ML21096A1772021-04-0606 April 2021 Teleconference with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 1, Proposed Alternative Request 2024-08-06 Category:Meeting Notice MONTHYEARPMNS20241383, Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 22024-11-0707 November 2024
[Table view]Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 2 PMNS20241229, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 22024-10-0303 October 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 PMNS20240978, Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant and Watts Bar Nuclear Plant License Amendment Request to Revise Technical Specs 3.5.2, Note 1 Related to the Residual Heat Removal System2024-08-13013 August 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant and Watts Bar Nuclear Plant License Amendment Request to Revise Technical Specs 3.5.2, Note 1 Related to the Residual Heat Removal System PMNS20241000, Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program2024-08-0606 August 2024 Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program PMNS20240831, Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program2024-06-24024 June 2024 Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program ML24137A2872024-05-16016 May 2024 Pre-Submittal Meetingfor Proposed License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources - Operating to Clarify Requirements for Diesel Generator Testing PMNS20240663, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specifications2024-05-0909 May 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specifications PMNS20240568, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specifications2024-04-24024 April 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specifications PMNS20240350, Annual Assessment Virtual Public Meeting2024-03-11011 March 2024 Annual Assessment Virtual Public Meeting PMNS20240344, Annual Assessment Public Poster Session and Open House Meeting2024-03-0707 March 2024 Annual Assessment Public Poster Session and Open House Meeting ML24044A0872024-02-14014 February 2024 TVA Slides - Watts Bar Nuclear Plant Pre-Submittal Meeting for License Amendment Request to Revise TS 3.7.11, Main Control Room Area Chilled Water System PMNS20240088, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant Technical Specifications2024-01-30030 January 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant Technical Specifications PMNS20231329, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants2023-11-28028 November 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants PMNS20231126, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 22023-10-18018 October 2023 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 PMNS20231024, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 22023-09-18018 September 2023 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 2 PMNS20230916, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 22023-08-31031 August 2023 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 2 PMNS20230795, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 22023-06-30030 June 2023 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 2 PMNS20230712, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants2023-06-12012 June 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants PMNS20230549, Annual Assessment Virtual Meeting for the 2022 Assessment Period2023-04-25025 April 2023 Annual Assessment Virtual Meeting for the 2022 Assessment Period PMNS20230446, Annual Assessment Public Poster Session and Openhouse Meeting2023-04-17017 April 2023 Annual Assessment Public Poster Session and Openhouse Meeting PMNS20230127, Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, to Increase the Allowable Number of Tritium Producing Burnable Absorber Rods2023-02-13013 February 2023 Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, to Increase the Allowable Number of Tritium Producing Burnable Absorber Rods PMNS20221292, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request2023-01-11011 January 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request PMNS20221152, Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 22022-11-0303 November 2022 Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 2 PMNS20220956, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request2022-09-20020 September 2022 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request PMNS20220531, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah and Watts Bar Nuclear Plants2022-05-19019 May 2022 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah and Watts Bar Nuclear Plants PMNS20220379, Meeting with Tennessee Valley Authority to Discuss a Proposed Exemption Request for Watts Bar Nuclear Plant, Unit 22022-04-0808 April 2022 Meeting with Tennessee Valley Authority to Discuss a Proposed Exemption Request for Watts Bar Nuclear Plant, Unit 2 PMNS20220314, Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Sequoyah and Watts Bar Nuclear Plants2022-03-31031 March 2022 Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Sequoyah and Watts Bar Nuclear Plants PMNS20220285, Annual Assessment Meeting2022-03-29029 March 2022 Annual Assessment Meeting PMNS20211575, Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 1, Proposed License Amendment Request2022-01-18018 January 2022 Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 1, Proposed License Amendment Request PMNS20211571, Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Units 1 and 2, Tritium Producing Burnable Absorption Rods2022-01-0606 January 2022 Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Units 1 and 2, Tritium Producing Burnable Absorption Rods PMNS20211507, Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Capsule Withdrawal2021-12-0101 December 2021 Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Capsule Withdrawal PMNS20211154, Meeting with Tennessee Valley Authority Regarding a Proposed Fleet Amendment Request2021-09-21021 September 2021 Meeting with Tennessee Valley Authority Regarding a Proposed Fleet Amendment Request PMNS20211126, Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 22021-09-0808 September 2021 Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2 PMNS20210945, Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 22021-08-0606 August 2021 Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2 PMNS20211003, Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Units 1 and 22021-08-0505 August 2021 Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Units 1 and 2 PMNS20210829, Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 22021-07-12012 July 2021 Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2 ML21189A0982021-07-0808 July 2021 Teleconference with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, PMNS20210702, Closed Meeting with Representatives from the Tennessee Valley Authority to Discuss a Planned Request for Exemption2021-05-25025 May 2021 Closed Meeting with Representatives from the Tennessee Valley Authority to Discuss a Planned Request for Exemption ML21117A1582021-04-27027 April 2021 Teleconference with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Units 1 and 2, Proposed License Amendment Request PMNS20210392, Annual Assessment Meeting2021-04-12012 April 2021 Annual Assessment Meeting ML21096A1772021-04-0606 April 2021 Teleconference with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 1, Proposed Alternative Request ML21083A0632021-03-24024 March 2021 Teleconference with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 1, Proposed Alternative Request PMNS20210104, Meeting with Tennessee Valley Authority Regarding Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 22021-02-0101 February 2021 Meeting with Tennessee Valley Authority Regarding Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2 ML21019A0152021-01-19019 January 2021 Teleconference with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Planned Steam Generator License Amendment Requests ML20349A3132020-12-14014 December 2020 Teleconference Call with Tennessee Valley Authority Regarding Planned License Amendment Requests Related to the Watts Bar Nuclear Plant, Unit 2 Steam Generator Replacement ML20342A3592020-12-0707 December 2020 Teleconference Call with Tennessee Valley Authority Regarding Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2 ML20315A3992020-11-10010 November 2020 Teleconference Call with Tennessee Valley Authority Regarding Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2 ML20295A5382020-10-21021 October 2020 Teleconference Call with Tennessee Valley Authority Regarding a Non-Conservative Technical Specification for the Watts Bar Nuclear Plant ML20279A2882020-10-0505 October 2020 Teleconference Call with Tennessee Valley Authority Regarding a Non-Conservative Technical Specification for the Watts Bar Nuclear Plant ML20167A1202020-06-30030 June 2020 Public Meeting Notice - Notice of Predecisional Enforcement Conference (Pec) Between U.S. Nuclear Regulatory Commission (NRC) and Tennessee Valley Authority (TVA) (EA-20-006, EA-20-007) 2024-08-06 Category:Memoranda MONTHYEARML24089A0712024-04-0101 April 2024
[Table view]3/20/24 & 3/27/24 2023 TVA Public Annual Assessment Meeting Summary ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML21060A9122021-03-17017 March 2021 Memo to File: Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Watts Bar ISFSI ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML19142A3602019-05-21021 May 2019 May 9, 2019 Summary of Public Meeting; Watts Bar Nuclear Plant ML18227A5992018-08-23023 August 2018 Request to Use a Later Edition of the Asme Boiler and Pressure Vessel Code, Section XI for Containment Inservice Inspection Activities ML18165A3962018-06-14014 June 2018 Summary of Public Meeting Concerning Annual Assessment of Watts Bar Nuclear Plant - Docket Nos. 50-390 and 391 ML17356A2692017-12-20020 December 2017 Construction Lessons Learned Report ML17332A2012017-11-28028 November 2017 Approval for Exceedance of the Watts Bar Maximum Baseline Inspection Samples ML17192A0312017-06-26026 June 2017 Construction Inspection and Oversight Lessons Learned ML17151A5092017-05-31031 May 2017 Public Meeting Summary - 2016 Annual Assessment Public Meeting Regarding Watts Bar Nuclear Plant ML16252A2042016-09-0909 September 2016 Memo Ico Staff Review of Watts Bar Nuclear Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, Revision 20 (Ns113989) for Verification of ASM Order EA-14-044 Implementation (Cac# L25130) ML16194A2522016-07-12012 July 2016 Memorandum to T. Mossman Technical Assistance Request-Review of Physical Security Plan for the Watts Bar Nuclear Plant Independent Spent Fuel Storage Installation (CAC No. L25130) ML16131A6172016-05-10010 May 2016 Summary of Public Meeting with Watts Bar, Units 1 and 2, to Discuss the Annual Assessment ML15259A4172015-10-21021 October 2015 the U.S. Nuclear Regulatory Commission Staff Evaluation of the Final Rule for Continued Storage of Spent Nuclear Fuel for the Operating License Environmental Review for Watts Bar Nuclear Plant, Unit 2 ML15288A3052015-10-15015 October 2015 Readiness of Watts Bar Unit 2 to Receive an Operating License ML15096A2042015-04-23023 April 2015 Reactor Oversight Process Transition Plan for Watts Bar Nuclear Plant, Unit 2 ML15104A2982015-04-10010 April 2015 March 26, 2015, Summary of Public Meeting with Watts Bar, Unit 2, Senior Management ML15104A2392015-04-10010 April 2015 March 26, 2015, Summary of Public Meeting with Watts Bar, Unit 2, EOC Assessment ML15084A4242015-03-25025 March 2015 March 17, 2015, Summary of Public Meeting with Watts Bar, Unit 1, Concerning Annual Assessment ML15015A4772015-02-0202 February 2015 Environmental Protection Plan (Non-Radiological) Technical Specification Review ML14247A4522014-08-28028 August 2014 FEMA Response to NRC for Watts Bar Nuclear Site ML14234A1462014-08-20020 August 2014 Memo to D. Safer Re M141030: Welcome Package for D.Safer for the Briefing on Watts Bar Unit 2 License Application Review ML14231B0102014-08-19019 August 2014 Summary of the Public Meeting to Discuss Aspects of Tva'S Response to 2009 Confirmatory Order, August 18, 2014 ML14197A6082014-08-0606 August 2014 July 1, 2014, Summary of Category 1 Public Meeting with Tennessee Valley Authority to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14364A1682014-06-0202 June 2014 Flowserve Corp., Vermont, Formal Evaluation of Deviations Reported - Notification of Defect - Watts Bar II ML14015A4522014-01-16016 January 2014 Notice of Meeting with Tennessee Valley Authority Regarding Open Items for Watts Bar Unit 2 ML14014A3262014-01-16016 January 2014 Notice of Forthcoming Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant (WBN) Unit 1 Fire Protection Amendment Request ML13352A4332013-12-19019 December 2013 Notice of Meeting with Tennessee Valley Authority Regarding Status of Construction and Licensing of Watts Bar Nuclear Plant, Unit 2 ML13213A4102013-08-0202 August 2013 Notice of Forthcoming Meeting with Tennessee Valley Authority on Watts Bar Electrical System LAR Review ML13126A2522013-07-25025 July 2013 Request for Additional Information on the 2013 Decommissioning Funding Status Report ML13149A1222013-05-30030 May 2013 Notice of Meeting with Tennessee Valley Authority Regarding Status of Construction and Licensing of Watts Bar Nuclear Plant, Unit 2 ML13105A3942013-04-16016 April 2013 Location Change - Notice of Forthcoming Meeting for Public Meeting with Tennessee Valley Authority (TVA) on 2.1 Response Extension Request, Sequoyah Nuclear Plant and Watts Bar Nuclear Plant ML13078A4212013-03-19019 March 2013 Public Meeting Notice Tennessee Valley Authority, Browns Ferry, Sequoyah, Watts Bar for Commercial Grade Dedication Program ML13072A1212013-03-19019 March 2013 Differing Professional Opinion Involving External Flooding (DPO-2012-003) ML13035A0572013-02-0404 February 2013 2/7/13 Cancellation of Public Meeting with TVA Re 2.1 Response Schedule for Watts Bar Nuclear Plant, Unit 1 ML13025A1742013-01-25025 January 2013 Meeting Notice with TVA to Discuss the Schedule to Respond to Recommendation 2.1 of the Near-Term Task Force Review of the Insights from the Fukushima Da-ichi Accident ML13007A0452013-01-0808 January 2013 1/23/13 Notice of Forthcoming Meeting with Tennessee Valley Authority Proposed Watts Bar Nuclear Plant, Units 1 License Amendment ML12362A1132012-12-27027 December 2012 1/7/2013 Cancellation Notice of Public Meeting with TVA Re Watts Bar Nuclear Plant, Units 1 and 2, Regarding a Proposed License Amendment Request ML12319A1722012-11-14014 November 2012 Meeting Notice with Tennessee Valley Authority to Discuss Hydrology Issues at Watts Bar Nuclear Plant, Unit 1 IR 05000390/20100082012-07-0606 July 2012 Errata for Electronic Closure of Watts Bar Inspection Report 05000390/2010-008 Memo Dated July 21, 2011 (ML 112020591) ML12158A5082012-06-12012 June 2012 Safety Concern Regarding Hydrology/Flooding Subsequent to May 31, 2012, Public Meeting ML12109A4282012-05-17017 May 2012 Final TIA 4 18 12 ML12122A6742012-05-0303 May 2012 Open Door Policy in the Matter of Watts Bar Nuclear Plant, Unit 1-Safety Concern Regarding Hydrology/Flooding ML12115A1652012-04-24024 April 2012 Follow-Up to Safety Concern Regarding Hydrology/Flooding ML1207501092012-03-15015 March 2012 Notice of Meeting with Tennessee Valley Authority to Discuss Pre-submittal Planning for Licensing Basis Change Regarding Hydrology for Watts Bar Nuclear Plant, Unit 1 ML1204610612012-02-0606 February 2012 Minutes of the ACRS Plant Operations and Fire Proctection Subcommittee Meeting December 15, 2011 (Open) IR 05000327/20100082011-07-21021 July 2011 IR 05000327-10-008, 05000328-10-008 for Electronic Closure of Sequoyah, and IR 05000390-10-008 for Watts Bar ML1120205912011-07-21021 July 2011 IR 05000327-10-008, 05000328-10-008 for Electronic Closure of Sequoyah, and IR 05000390-10-008 for Watts Bar 2024-04-01 |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 16, 2014 MEMORANDUM TO: Jessie F. Quichocho, Chief Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Justin C. Pople, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licens Office of Nuclear Reactor Regul *
SUBJECT:
FORTHCOMING MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA) REGARDING SAFETY EVALUATION REPORT OPEN ITEMS RELATED TO WATTS BAR NUCLEAR PLANT, UNIT 2 DATE & TIME: Tuesday, January 28, 2014 2:30 p.m. - 4:00 p.m.
PURPOSE: To discuss the status of open items resulting from the NRC staff's review of the Final Safety Analysis Report for Watts Bar Nuclear Plant, Unit 2.
LOCATION: U.S. Nuclear Regulatory Commission (NRC)
One White Flint North Room 07-B04 11555 Rockville Pike, Rockville, Maryland CATEGORY 1:* This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR). TVA licensing staff will be participating.
NRC TVA J. Poole, NRR I G. Mathru, NRR G. Arent I R. Mathew, NRR I R. Pederson, NRR et al. l
- Commission's Policy Statement on AEnhancing Public Participation in NRC Meetings@ (67 FR 36920), May 28, 2002.
J. Quichocho Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call or e-mail one of the meeting contacts listed below before January 24, 2014, 2:30 p.m. (Eastern Time) to get the telephone number and the pass code.
MEETING CONTACTS: Justin Poole, NRR Jeanne Dion, NRR 301-415-2048 301-415-1349 Justin.Poole@nrc.gov Jeanne.Dion@ nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),
please notify one of the NRC meeting contacts. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-reqion.html.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
Docket No. 50-391
Enclosure:
Agenda cc w/encl: Distribution via Listserv
AGENDA FORTHCOMING MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA)
Tuesday, January 28. 2014 Time 2:30 p.m. - 4:00 p.m. (EST) 2:30 PM - 2:35 PM Introduction and Meeting Scope 2:35 PM- 3:50 PM Discussion on Electrical and Offsite dose calculation open items.
3:50PM-4:00PM Opportunity for Public Comment 4:00PM Meeting Adjourned Enclosure
ML14015A452 DORULPL2-2 DORL/LPL2-OFFICE /PM iT 2/PM DORLILPL2-2/LA DORULPL2-2/BC DORLILPL2-2/PM DORL/LPL2-2/PM NAME JDion JPoole BCiayton JQuichocho JDion JPoole DATE 01/15/14 01/15/14 01/15/14 01/15/14 01/16/14 01/16/14