VC Summer, Enclosure to Meeting Summary, September 13, 2006, Meeting with South Carolina Electric & Gas, on Generic Letter 96-06 (TAC M96872)
ML062990478
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 10/24/2006
From: Martin R
NRC/NRR/ADRO/DORL/LPLII-2
To:
South Carolina Electric & Gas Co
Martin RE, NRR/DLPM, 415-1493
Shared Package
ML062910160 List:
References
TAC M96872
Download: ML062990478 (4)


Text

Introduction Reason for Commitment Change

" Management Challenge

- Design Change Package late issue

- Planning & Scheduling not timely

- Implementation Resources

" Risk of implementing Design Change

- Risk of impact to SW supply to RBCU function without corresponding risk improvement from design change Plant Safety in Current Configuration VCSNS will remain safe:

  • Water hammer condition exists only when SW aligned to RBCU's and LOOP
  • Becomes significant only when SW aligned to RBCU's, w/LOOP, and w/LOCA or MSLB

- PRA indicates very low risk (1.74E-07/yr)

- Phase 1 actions in place

  • Real Life Experience

- No damage to piping or hangers Enclosure 2

I Schedule for Design Change Implementation (Commitment change required)

Implementation by 5/2008 (Refueling 17)

- Extensive modification

- Unit shutdown required

- Next scheduled shutdown for refueling Resolution of Technical Issues from NRC letter August 22, 2006

" VCSNS reviewed NRC ltr. dated 8/22/2006

" No additional explanation necessary

" VCSNS expects to respond in the next 60 days

Introduction Purpose of Visit

" Discuss VCSNS commitments associated with Generic Letter (GL) 96-06.

- Implement design changes by 10/06

1. Delay opening 3107A/B
2. Install vacuum relief valves
3. Replace 3107AJB

" VCSNS wishes to alter this commitment FIGURE 2a Modification WWIl Coilutkrain - RBCUsalignedWithSWsysem WATERHAMAMER 14110A110N- hAM1.WU 2 .W-SMMSWSPq upmd~ard rg.~mdSWBP PHASE 1 - LOOPo.,an SWb-W P.W. Wd-OLW PHASE 2- VW. 3107Afttdo- 8WdkqP PHASE 32-SAMdIotM SMW310A IA Need I -NSWH PHASES. ý1 31OIAISE.W 1.SW 301 ICStupy va*,m

-lc

  • MI cu ~

.IiI HA.

"TO,SW Pond

V. C. Summer Nuclear Station Generic Letter 96-06 Discussion Brad Stokes, Manager Design Engineering Alan Torres, Manager Planning and Scheduling Chuck Barbier, Principle Design Engineer - Piping CM

ýe ýZý Agenda

  • Introduction
  • Plant Safety in Current Configuration
  • Schedule for Implementation of Modifications
  • Resolution of Technical Issues
  • Open discussion I

NRC/VCSNS Open Discussion FIGURE 2a Modification Inital Configuration - RBCUs aligned with SW system 3109A WATER HAMMER MITIGATION - Mod to install: XAA-1

1. vacuum relief valve downstream of 3107A
2. replace 3107A with an air operated butterfly valve that fast closes upon de-energize ofSWBP 3108B 3109B
3. delay opening of valve 3107A for five seconds after start of SWBP XAA-I B Lý PHASE 1 - LOOP occurs causing SW booster pumps to de-energize.

Fast closing valve PHASE 2 - Valve 3107A fast closes and traps traps water above it Column of fluid above it PHASE 3 - Void formed below 3107A is filled with air by vacuum relief valves PHASE 4 - After 41 seconds, SW Vacuum booster pumps re-energized, 3107A valve 5 sec Relief delayed opening allows fluid flow momentum to Valve build preventing further void formation PHASE 5 - air void downstream 3107A flushed to SW pond

'AIAA SW Booster Pump SW Supply De-energizedIdue -

to LOOP IC Supply IC Return Vacuum relief valve replaces vacuum void To SW Pond with air