September 13, 2006, Summary of Meeting with South Carolina Electric & Gas Re Generic Letter 96-06 (TAC No. M96872)
ML062760528
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 10/24/2006
From: Martin R
NRC/NRR/ADRO/DORL/LPLC
To:
Martin R, NRR/DORL, 415-1493
Shared Package
ML062910160 List:
References
TAC M96872
Download: ML062760528 (4)


Text

October 24, 2006 LICENSEE: South Carolina Electric & Gas Company FACILITY: Virgil C. Summer Nuclear Station

SUBJECT:

SUMMARY

OF SEPTEMBER 13, 2006, MEETING WITH SOUTH CAROLINA ELECTRIC & GAS, ON GENERIC LETTER 96-06 (TAC NO. M96872)

On September 13, 2006, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of South Carolina Electric & Gas (SCE&G) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the schedule for the licensees commitments concerning the resolution of Generic Letter (GL) 96-06, Assurance of Equipment Operability and containment Integrity During Design-Basis Accident Conditions, for the V. C. Summer Nuclear Station (VCSNS). A list of attendees is provided as Enclosure 1. Members of the public were not in attendance.

The licensees slides are included in Enclosure 2. As part of the resolution of GL 96-06 for VCSNS to reduce the potential for waterhammer, the licensee had committed to implement certain modifications during the Fall 2006 refueling outage. These modifications included delaying the opening of valve 3107 A for five seconds after the start of a service water booster pump replacement of valve 3107 A with an air operated butterfly valve that fast closes and installation of a vacuum relief valve downstream of valve 3107 A. The licensee changed the schedule for these modifications for the spring 2008 refueling outage. The licensee stated that the reasons for the rescheduling included management challenges with issuance of the design change package and the requirement to use available implementation resources for other activities such as the containment sump modifications. The licensee stated that the risk of not making the modifications as previously planned is very low.

The current status of the NRC staffs assessment of GL 96-06 issues for the VCSNS is presented in its letter dated August 22, 2006, wherein certain issues are reported to be closed and the need for additional information on remaining issues is identified. The licensee stated that they would respond to that letter within 60 days of the date of the meeting.

The NRC staff present at the meeting did not identify an objection to the licensees plans to reschedule the implementation of the modifications. The NRC staff plans to continue its review of the GL 96-06 issue for VCSNS upon receipt of the licensees response to the staffs August 22, 2006, letter.

/RA/

Robert E. Martin, Senior Project Manager Plant Licensing Branch 2-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-395

Enclosures:

1. List of Attendees
2. Licensee Handout(s) cc w/encls: See next page

SUMMARY

OF SEPTEMBER 13, 2006, MEETING WITH SOUTH CAROLINA ELECTRIC & GAS, ON GENERIC LETTER 96-06 (TAC NO. M96872)

LIST OF ATTENDEES SCE&G C. Barbier A. D. Torres R. B Stokes NRC C. Gratton G. Hammer J. Tatum Enclosure 1

The NRC staff present at the meeting did not identify an objection to the licensees plans to reschedule the implementation of the modifications. The NRC staff plans to continue its review of the GL 96-06 issue for VCSNS upon receipt of the licensees response to the staffs August 22, 2006, letter.

/RA/

Robert E. Martin, Senior Project Manager Plant Licensing Branch 2-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-395

Enclosures:

1. List of Attendees
2. Licensee Handout cc w/encls: See next page DISTRIBUTION:

Public RidsAcrsAcnwMailCenter RidsRgn2MailCenter LPL2-1 R/f R. Jasinski, NRR RidsnrrDorlLPL2-1 C. Gratton RidsNrrPMRMartin G. Hammer RidsNrrLACSola J. Tatum RidsOgcRp S. Lee (EDO, Rgn II)

Package: ML062910160 Enclosure 2 (Meeting Handouts): ML062990478 Meeting Summary: ML062760528 NRC-001 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NAME RMartin RSola EMarinos DATE 10/24/06 10/24/06 10/24/06 OFFICIAL RECORD

Virgil C. Summer Nuclear Station cc:

Mr. R. J. White Nuclear Coordinator S.C. Public Service Authority c/o Virgil C. Summer Nuclear Station Post Office Box 88, Mail Code 802 Jenkinsville, SC 29065 Resident Inspector/Summer NPS c/o U.S. Nuclear Regulatory Commission 576 Stairway Road Jenkinsville, SC 29065 Chairman, Fairfield County Council Drawer 60 Winnsboro, SC 29180 Mr. Henry Porter, Assistant Director Division of Waste Management Bureau of Land & Waste Management Dept. of Health & Environmental Control 2600 Bull Street Columbia, SC 29201 Mr. Thomas D. Gatlin, General Manager Nuclear Plant Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88, Mail Code 300 Jenkinsville, SC 29065 Mr. Robert G. Sweet, Manager Nuclear Licensing South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88, Mail Code 830 Jenkinsville, SC 29065 Ms. Kathryn M. Sutton Morgan, Lewis & Bockius LLP 111 Pennsylvania Avenue, NW.

Washington, DC 20004