Nuclear Generating Plant - NRC Security Inspection Report 05000302/2009403
ML092160343
Person / Time
Site: Crystal River Duke energy icon.png
Issue date: 08/04/2009
From: Ernstes M
NRC/RGN-II/DRS/PSB2
To: Franke J
Progress Energy Florida
References
IR-09-403
Download: ML092160343 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 August 4, 2009 Mr. Jon Vice President, Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C)

15760 W. Power Line Street Crystal River, FL 34428-6708 SUBJECT: CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT- NRC SECURITY INSPECTION REPORT 05000302/2009403

Dear Mr. Franke:

On July 9, 2009, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Crystal River Unit 3 Nuclear Generating Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC=s Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed with Mr. and other members of your staff on July 9, 2009.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. FPC 2 If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Michael Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-302 License No.: DPR-72 Enclosure: Inspection Report 05000302/2009403 w/Attachment: Supplemental Information cc w/encl.: See Page 3 FPC 3 cc w/Encl:

Brian C. McCabe Manager, Nuclear Regulatory Affairs Progress Energy Carolinas, Inc.

P.O. Box 10429 Southport, NC 28461-0429 James W. Holt Plant General Manager Crystal River Nuclear Plant (NA2C)

15760 W. Power Line Street Crystal River, FL 34428-6708 R. J. Duncan, II Vice President Nuclear Operations Carolina Power & Light Company P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 Christos Kamilaris Director Fleet Support Services Carolina Power & Light Company P.O. Box 1551 Raleigh, NC 27602-1551 Thomas D. Walt Vice President Nuclear Oversight Carolina Power and Light Company P.O. Box 1551 Raleigh, NC 27602-1551 Attachment _________________________ X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRP SIGNATURE /RA/ /RA/ /RA/

NAME J. Shehee M. Ernstes M. Sykes DATE 8/4/2009 8/4/2009 8/3/2009 8/ /2009 8/ /2009 8/ /2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO