February 19, 2009
SUBJECT:
CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - NRC SECURITY
INSPECTION REPORT 05000302/2009402
Dear:
Mr. Young:
On February 6, 2009, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Crystal River Unit 3 Nuclear Generating Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC=s Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on February 6, 2009, with Mr. J. Franke and other members of your staff.
This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1). B FPC
2 Should you have any questions concerning this letter, please contact us.
Sincerely,
/RA/
Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety
Docket No.: 50-302 License No.: DPR-72
Enclosure: Inspection Report 05000302/2009402
w/Attachment: Supplemental Information cc w/Encl.: (See Page 3) FPC
3 cc w/Encl:
Brian C. McCabe Manager Nuclear Regulatory Affairs Progress Energy PEB 5 P.O. Box 1551 Raleigh, NC 27602-1551
James W. Holt Plant General Manager Crystal River Nuclear Plant (NA2C)
15760 W. Power Line Street Crystal River, FL 34428-6708
R. J. Duncan, II Vice President Nuclear Operations Carolina Power & Light Company P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165
Christos Kamilaris Director Fleet Support Services Carolina Power & Light Company P.O. Box 1551 Raleigh, NC 27602-1551
T. D. Walt Vice President Nuclear Oversight Carolina Power and Light Company P.O. Box 1551 Raleigh, NC 27602-1551
_________________________
OFFICE RII:DRS RII:DRS RII:DRS RII:DRS RII:DRP
SIGNATURE
/RA/
/RA/
/RA/
/RA/
/R/A
NAME K. Davis A. Richardson J. Wallo M. Ernstes M. Sykes
DATE 2/8/2009 2/19/2009 2/18/2009 2/19/2009 2/18/2009
E-MAIL COPY?
YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO