Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 - Inspection Report 05000220/2017005 and 05000410/2017005
ML17241A059
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 08/28/2017
From: Anthony Dimitriadis
Reactor Projects Branch 1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2017005
Download: ML17241A059 (5)


Text

ust 28, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR NINE MILE POINT NUCLEAR STATION UNITS 1 AND 2 - INSPECTION REPORT 05000220/2017005 AND 05000410/2017005

Dear Mr. Hanson:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for your Nine Mile Point Nuclear Station Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

In addition to normal baseline inspection, the NRC will be performing a temporary instruction under Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

Please contact me at 610-337-6953 with any questions you have regarding this letter.

Sincerely,

/RA/

Anthony Dimitriadis, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-220 and 50-410 License Nos. DPR-63 and DPR-69 Enclosure:

Inspection Plan cc: Distribution via ListServ

ML17241A059 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ARosebrook ADimitriadis DATE 8/15/17 8/28/17

Page 1 of 3 Nine Mile Point 08/09/2017 12:32:57 Inspection / Activity Plan Report 22 07/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 10/23EXM - NMP2 INITIAL OL EXAM 4 2 10/23/2017 10/27/2017 U01955 FY 18 NINE MILE PT 2 EXAM (OCTOBER 2017)

2 12/11/2017 12/15/2017 U01955 FY 18 NINE MILE PT 2 EXAM (OCTOBER 2017)

RS345 - HP INSPECTION 2 1, 2 07/24/2017 07/28/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 07/24/2017 07/28/2017 IP 71124.04 Occupational Dose Assessment 1, 2 07/24/2017 07/28/2017 IP 71124.05 Radiation Monitoring Instrumentation TI-191 - FUKUSHIMA LESSONS-LEARNED 6 1, 2 08/21/2017 08/25/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 7111121M - DESIGN BASES ASSURANCE INSPECTION (TEAM) 8 1, 2 09/18/2017 09/22/2017 IP 7111121M Design Bases Assurance Inspection (Teams)

1, 2 10/02/2017 10/06/2017 IP 7111121M Design Bases Assurance Inspection (Teams)

7111111B - NMP2 REQUAL INSPECTION WITH P/F RESULTS 2 2 10/16/2017 10/20/2017 IP 7111111A Licensed Operator Requalification Program - Annual Review 2 10/16/2017 10/20/2017 IP 7111111B Licensed Operator Requalification Program EP - EP EXERCISE INSPECTION 5 1, 2 10/23/2017 10/27/2017 IP 7111401 Exercise Evaluation 1, 2 10/23/2017 10/27/2017 IP 71151 Performance Indicator Verification RS12 - HP INSPECTION 2 1, 2 09/18/2017 09/22/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/18/2017 09/22/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 09/18/2017 09/22/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 71152B - PI&R BIENNIAL 8 1, 2 10/30/2017 11/03/2017 IP 71152B Problem Identification and Resolution 1, 2 11/13/2017 11/17/2017 IP 71152B Problem Identification and Resolution 71124 - RAD SAFETY INSP 1 1, 2 03/05/2018 03/09/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 03/05/2018 03/09/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71124 - RAD SAFETY INSP 1 1, 2 04/30/2018 05/04/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/30/2018 05/04/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 04/30/2018 05/04/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/30/2018 05/04/2018 IP 71124.04 Occupational Dose Assessment This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 Nine Mile Point 08/09/2017 12:32:57 Inspection / Activity Plan Report 22 07/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site U2 ISI - UNIT 2 INSERVICE INSPECTION 2 2 04/23/2018 04/27/2018 IP 7111108G Inservice Inspection Activities - BWR 12/03EXM - NMP1 INITIAL OL EXAM 4 1 11/04/2018 11/09/2018 U01975 FY19 NINE MILE PT 1 EXAM (DECEMBER 2018)

1 12/03/2018 12/07/2018 U01975 FY19 NINE MILE PT 1 EXAM (DECEMBER 2018)

EP - EP PROGRAM INSPECTION 1 1, 2 07/16/2018 07/20/2018 IP 7111402 Alert and Notification System Testing 1, 2 07/16/2018 07/20/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 07/16/2018 07/20/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 07/16/2018 07/20/2018 IP 71151 Performance Indicator Verification 71124.08 - RADWASTE 1 1, 2 07/23/2018 07/27/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.05 - RAD INSTRUNMENTATION 1 1, 2 08/06/2018 08/10/2018 IP 71124.05 Radiation Monitoring Instrumentation REQUAL - NMP1 REQUAL INSP W/ P/F RESULTS 2 1 10/29/2018 11/02/2018 IP 7111111A Licensed Operator Requalification Program - Annual Review 1 10/29/2018 11/02/2018 IP 7111111B Licensed Operator Requalification Program 7111105T - TRIENNIAL FIRE PROTECTION 7 1 09/10/2018 09/14/2018 IP 7111105T Fire Protection [Triennial]

2 09/10/2018 09/14/2018 IP 7111105X Fire Protection - NFPA 805 (Triennial)

1 09/24/2018 09/28/2018 IP 7111105T Fire Protection [Triennial]

2 09/24/2018 09/28/2018 IP 7111105X Fire Protection - NFPA 805 (Triennial)

71124 - RAD SAFETY INSPECTION 1 1, 2 10/15/2018 10/19/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/15/2018 10/19/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/15/2018 10/19/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/15/2018 10/19/2018 IP 71124.04 Occupational Dose Assessment LR PH 4 - NMP UNIT 1 - LICENSE RENEWAL PHASE 4 2 1 02/25/2019 03/01/2019 IP 71003 Post-Approval Site Inspection for License Renewal U1 ISI - INSERVICE INSPECTION - UNIT 1 1 1 03/25/2019 03/29/2019 IP 7111108G Inservice Inspection Activities - BWR 71124 - RAD SAFETY OUT 1 1, 2 04/01/2019 04/05/2019 IP 71124.01 Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Nine Mile Point 08/09/2017 12:32:57 Inspection / Activity Plan Report 22 07/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RAD SAFETY OUT 1 1, 2 04/01/2019 04/05/2019 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 04/01/2019 04/05/2019 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/01/2019 04/05/2019 IP 71124.04 Occupational Dose Assessment 7111117T - 50.59 PROCESS 3 1, 2 04/22/2019 04/26/2019 IP 7111117T Evaluations of Changes, Tests, and Experiments 71124 - RAD SAFETY 01,02,03,04 1 1, 2 05/20/2019 05/24/2019 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 05/20/2019 05/24/2019 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 05/20/2019 05/24/2019 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 05/20/2019 05/24/2019 IP 71124.04 Occupational Dose Assessment This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.