UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406 December 13, 2007 Mr. Keith J. Polson, Vice President Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093-0063
SUBJECT:
CHANGE TO THE INSPECTION PLAN FOR THE NINE MILE POINT NUCLEAR STATION
Dear Mr. Polson:
As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.
The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.
In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
K. Polson 2
Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Mr. Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects, Region I Docket Nos. 50-220, 50-410 License No. DPR-63, NPF-69
Enclosures:
Nine Mile Point Nuclear Station Inspection/Activity Plans cc w/encl:
M. J. Wallace, President, Constellation Generation J.M. Heffley, Senior Vice President and Chief Nuclear Officer C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, LLC M. J. Wetterhahn, Esquire, Winston and Strawn T. Syrell, Director, Licensing, Nine Mile Point Nuclear Station P. Tonko, President and CEO, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority P. D. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law Supervisor, Town of Scriba T. Judson, Central NY Citizens Awareness Network D. Katz, Citizens Awareness Network J. Evans, LIPA C. Adrienne Rhodes, Chairman and Executive Director, State Consumer Protection Board
K. Polson 2
Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Mr. Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects, Region I Docket Nos. 50-220, 50-410 License No. DPR-63, NPF-69
Enclosures:
Nine Mile Point Nuclear Station Inspection/Activity Plans cc w/encl:
M. J. Wallace, President, Constellation Generation J.M. Heffley, Senior Vice President and Chief Nuclear Officer C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, LLC M. J. Wetterhahn, Esquire, Winston and Strawn T. Syrell, Director, Licensing, Nine Mile Point Nuclear Station P. Tonko, President and CEO, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority P. D. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law Supervisor, Town of Scriba T. Judson, Central NY Citizens Awareness Network D. Katz, Citizens Awareness Network J. Evans, LIPA C. Adrienne Rhodes, Chairman and Executive Director, State Consumer Protection Board Distribution: see next page SUNSI Review Complete: BAB4 (Reviewer=s Initials)
DOCUMENT NAME: T:\\DRP\\BRANCH1\\ROP 8 Letters\\ROP8 Letter - NMP.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME BBickett/BAB4 GDentel/GTD DATE 12/06/07 12/06/07 OFFICIAL RECORD COPY
K. Polson 3
Distribution w/encl:
S. Collins, RA M. Dapas, DRA G. West, RI OEDO (Acting)
J. Lubinski, NRR D. Pickett, PM, NRR M. David, PM, NRR G. Dentel, DRP B. Bickett, DRP E. Knutson, SRI - Nine Mile Point D. Dempsey, RI - Nine Mile Point K. Kolek, DRP, OA Region I Docket Room (with concurrences)
J. Trapp, DRS J. Rogge, DRS M. Sykes, DRS J. White, DRS L. Doerflein, DRS R. Conte, DRS L. Scholl, DRS P. Frechette, DRS D. Silk, DRS D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA D. Holody, ORA J. Thompson, NRR (JWT1@nrc.gov)
Nine Mile Point Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 12/11/2007 14:30:48 Report 22 4
3/10 EXM
- U2 INITIAL OPERATOR LICENSING EXAM Not Applicable 02/04/2008 02/08/2008 1
U01740 FY08 NINE MILE POINT U-2 OL EXAM Not Applicable 03/10/2008 03/14/2008 1
U01740 FY08 NINE MILE POINT U-2 OL EXAM 1
7111108G
- U2 INSERVICE INSPECTION Baseline Inspections 03/24/2008 03/28/2008 2
7111108G IP Inservice Inspection Activities - BWR 1
71121
- OCC RAD SAFETY Baseline Inspections 03/24/2008 03/28/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/24/2008 03/28/2008 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 03/24/2008 03/28/2008 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 5
10/6EXAM
- U1 INITIAL OPERATOR LICENSING EXAM Not Applicable 09/15/2008 09/19/2008 1
U01690 FY09 - NINE MILE POINT 1 INITIAL OPERATOR EXAM Not Applicable 10/06/2008 10/17/2008 1
U01690 FY09 - NINE MILE POINT 1 INITIAL OPERATOR EXAM 1
7112203
- PUB RAD SAFETY - REMP Baseline Inspections 06/16/2008 06/20/2008 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 06/16/2008 06/20/2008 1, 2 71151-PR01 IP RETS/ODCM Radiological Effluent 1
- EP PROGRAM INSPECTION EP Baseline Inspectio 07/14/2008 07/18/2008 1, 2 7111402 IP Alert and Notification System Testing EP Baseline Inspectio 07/14/2008 07/18/2008 1, 2 7111403 IP Emergency Response Organization Augmentation Testing EP Baseline Inspectio 07/14/2008 07/18/2008 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes EP Baseline Inspectio 07/14/2008 07/18/2008 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 07/14/2008 07/18/2008 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 07/14/2008 07/18/2008 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 07/14/2008 07/18/2008 1, 2 71151-EP03 IP Alert & Notification System 1
71121
- OCC RAD SAFETY Baseline Inspections 08/11/2008 08/15/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 08/11/2008 08/15/2008 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 08/11/2008 08/15/2008 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 5
7111111B
- L.O.REQUAL.PROG.(FOCUS U1)+P/F RVW Baseline Inspections 12/01/2008 12/05/2008 1, 2 7111111B IP Licensed Operator Requalification Program 9
7111121
- CDBI Baseline Inspections 10/06/2008 10/10/2008 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/20/2008 10/24/2008 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/27/2008 10/31/2008 1, 2 7111121 IP Component Design Bases Inspection 1
71121
- OCC RAD SAFETY Baseline Inspections 11/03/2008 11/07/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Nine Mile Point Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 12/11/2007 14:30:48 Report 22 1
71121
- OCC RAD SAFETY Baseline Inspections 11/03/2008 11/07/2008 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 11/03/2008 11/07/2008 1, 2 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 11/03/2008 11/07/2008 1, 2 71151-PR01 IP RETS/ODCM Radiological Effluent 1
7112202
- PUB RAD SAFETY - RADWASTE Baseline Inspections 12/08/2008 12/12/2008 1, 2 7112202 IP Radioactive Material Processing and Transportation This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.