Mid-Cycle Performance Review and Inspection Plan - Nine Mile Point Nuclear Station
ML052420688
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 08/30/2005
From: James Trapp
Reactor Projects Branch 1
To: Spina J
Nine Mile Point
Trapp J RGN-I/DRP/PB1/610-337-5186
References
Download: ML052420688 (5)


Text

August 30, 2005 Mr. James A. Spina Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - NINE MILE POINT NUCLEAR STATION

Dear Mr. Spina:

On August 2, 2005, the NRC staff completed its performance review of Nine Mile Point Nuclear Station for the first half of the calendar year 2005 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and the enclosed inspection plan do not include physical protection information. A separate letter designated and marked as "Exempt from Public Disclosure in accordance with 10 CFR 2.390" will include the physical protection review and a resultant inspection plan.

Plant performance for the most recent quarter at Nine Mile Point Units 1 and 2 was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting non-baseline inspections which include license renewal inspections.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2007. The plan includes those inspections which are associated with license renewal. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.

Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from a Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (Public Electronic Reading Room).

Mr. James A. Spina 2 If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5186 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects Docket Nos. 50-220, 50-410 License Nos. DPR-63, DPR-59

Enclosure:

Nine Mile Point Inspection/Activity Plan cc w/encl:

M. J. Wallace, President, Constellation Generation M. Heffley, Senior Vice President and Chief Nuclear Officer C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, LLC M. J. Wetterhahn, Esquire, Winston and Strawn Mr. William Flynn, President, New York State Energy, Research, and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority P. D. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law Supervisor, Town of Scriba T. Judson, Central NY Citizens Awareness Network D. Katz, Citizens Awareness Network

Mr. James A. Spina 3 Distribution w/encl: (via E-mail)

S. Collins, RA M. Dapas, DRA S. Lee, RI EDO Coordinator R. Laufer, NRR P. Milano, PM, NRR (Backup)

T. Colburn, PM, NRR J. Trapp, DRP C. Khan, DRP T. Setzer, DRP M. Patel, DRP H. Jones, DRP G. Hunegs, DRP, Senior Resident Inspector B. Fuller, DRP, Resident Inspector E. Knutson, DRP, Resident Inspector K. Kolek, Resident OA Region I Docket Room (with concurrences)

D. Screnci, PAO N. Sheehan, PAO DRS Director DRS Deputy Director DRS Branch Chiefs RidsNrrDipmlipb@nrc.gov Institute of Nuclear Power Operations (INPO)

DOCUMENT NAME: S:\ROP-6 Mid-Cycle Review\2005 Mid-Cycle Letters\Nine Mile Point ROP-6 Mid-Cycle Assessment Letter.wpd SISP Review Complete: JMT (Reviewers Initials)

After declaring this document An Official Agency Record it will/will not be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP /

NAME CKhan JTrapp DATE 08/16/05 08/30/05 OFFICIAL RECORD COPY

Page 1 of 2 Nine Mile Point 08/30/2005 10:26:42 Inspection / Activity Plan Report 22 08/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7111401 - EXERCISE EVALUATION & EP PI VERIFICATION 4 1, 2 IP 7111401 Exercise Evaluation 08/15/2005 08/19/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/15/2005 08/19/2005 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 08/22/2005 08/26/2005 Baseline Inspections 7111111B - LO REQUAL PROG (U2 OPTEST)&P/F RESULTS 2 1, 2 IP 7111111B Licensed Operator Requalification Program 11/14/2005 11/18/2005 Baseline Inspections MODS - MODS & 50.59 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 09/19/2005 09/23/2005 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 09/19/2005 09/23/2005 Baseline Inspections 71152B - PI&R 4 1, 2 IP 71152B Identification and Resolution of Problems 10/17/2005 10/21/2005 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 10/31/2005 11/04/2005 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 11/14/2005 11/18/2005 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 11/14/2005 11/18/2005 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 11/14/2005 11/18/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 11/14/2005 11/18/2005 Baseline Inspections LIC REN - LICENSE RENEWAL RE-INSPECTION 5 1, 2 IP 71002 License Renewal Inspection 12/05/2005 12/09/2005 License Renewal Insp 7111108G - INSERVICE INSPECTION - UNIT 2 1 2 IP 7111108G Inservice Inspection Activities - BWR 03/27/2006 03/31/2006 Baseline Inspections 71121 - OCC RAD SAFETY 1 2 IP 7112101 Access Control to Radiologically Significant Areas 03/27/2006 03/31/2006 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 03/27/2006 03/31/2006 Baseline Inspections 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/27/2006 03/31/2006 Baseline Inspections TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 3 1 IP 7111105T Fire Protection [Triennial] 05/08/2006 05/12/2006 Baseline Inspections 1 IP 7111105T Fire Protection [Triennial] 05/22/2006 05/26/2006 Baseline Inspections 7111112B - MAINTENANCE RULE 1 1, 2 IP 7111112B Maintenance Effectiveness 06/19/2006 06/23/2006 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 06/26/2006 06/30/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 06/26/2006 06/30/2006 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 06/26/2006 06/30/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Nine Mile Point 08/30/2005 10:26:42 Inspection / Activity Plan Report 22 08/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71114 - EP PRGM INSP & PI VERIFICATION 1 1, 2 IP 7111402 Alert and Notification System Testing 07/10/2006 07/14/2006 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 07/10/2006 07/14/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/10/2006 07/14/2006 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 07/10/2006 07/14/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 07/10/2006 07/14/2006 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP 1 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 08/28/2006 09/01/2006 Baseline Inspections 7111111B - L.O. REQUAL PROGRAM (FOCUS U1 OPTEST) 3 1, 2 IP 7111111B Licensed Operator Requalification Program 11/06/2006 11/10/2006 Baseline Inspections 1, 2 IP 7111111B Licensed Operator Requalification Program 11/13/2006 11/17/2006 Baseline Inspections 7111121 - SSD&PC 6 1, 2 IP 7111121 Safety System Design and Performance Capability 09/11/2006 09/15/2006 Baseline Inspections 1, 2 IP 7111121 Safety System Design and Performance Capability 09/25/2006 09/29/2006 Baseline Inspections 1, 2 IP 7111121 Safety System Design and Performance Capability 10/09/2006 10/13/2006 Baseline Inspections 1, 2 IP 7111121 Safety System Design and Performance Capability 10/16/2006 10/20/2006 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/30/2006 11/03/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/30/2006 11/03/2006 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 10/30/2006 11/03/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/30/2006 11/03/2006 Baseline Inspections 12/11+EX - U1 OPERATOR LICENSING INITIAL EXAM 4 1 U01588 NINE MILE, UNIT 1 INITIAL EXAM (8/06) 11/13/2006 11/17/2006 Not Applicable 1 U01588 NINE MILE, UNIT 1 INITIAL EXAM (8/06) 12/11/2006 12/15/2006 Not Applicable 7111107B - HEAT SINK 2 1, 2 IP 7111107B Heat Sink Performance 11/13/2006 11/17/2006 Baseline Inspections 7112202 - PUB RAD SAFETY - RADWASTE 1 1, 2 IP 7112202 Radioactive Material Processing and Transportation 12/11/2006 12/15/2006 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 03/12/2007 03/16/2007 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 03/12/2007 03/16/2007 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/12/2007 03/16/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.