2006-001 - Annual Assessment Letter - Nine Mile Point Nuclear Station (Report 05-220/2006001 and 05-410/2006001)
ML060620273
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 03/02/2006
From: James Trapp
Reactor Projects Branch 1
To: O'Connor T
Nine Mile Point
Trapp J RGN-I/DRP/PB1/610-337-5186
References
IR-06-001
Download: ML060620273 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 March 2, 2006 Mr. Timothy J. OConnor Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093

SUBJECT:

ANNUAL ASSESSMENT LETTER - NINE MILE POINT NUCLEAR STATION (REPORT 05000220/2006001 AND 05000410/2006001)

Dear Mr. OConnor:

On February 8, 2006, the NRC staff completed its performance review of Nine Mile Point Nuclear Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2005. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the physical protection review and resultant inspection plan.

Overall, Nine Mile Point Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through September 30, 2007. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

2 T. OConnor If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mr. Brian McDermott at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

James M. Trapp, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-220, 50-410 License Nos. DPR-63, DPR-59

Enclosure:

Nine Mile Point Inspection/Activity Plan cc w/encl:

M. J. Wallace, President, Constellation Generation M. Heffley, Senior Vice President and Chief Nuclear Officer C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, LLC M. J. Wetterhahn, Esquire, Winston and Strawn P. Smith, President, New York State Energy, Research, and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority P. D. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law Supervisor, Town of Scriba T. Judson, Central NY Citizens Awareness Network D. Katz, Citizens Awareness Network J. R. Evans, LIPA C. Adrienne Rhodes, Chairman and Executive Director, State Consumer Protection Board

3 T. OConnor Distribution w/encl:

(via E-mail)

S. Collins, RA M. Dapas, DRA B. Holian, DRP A. Blough, DRS D. Lew, DRP M. Gamberoni, DRS B. Sosa, RI OEDO J. Trapp, DRP B. McDermott, DRP C. Khan, DRP R. Laufer, NRR T. Colburn, PM, NRR P. Milano, PM (backup) NRR L. Cline, SRI - Nine Mile Point B. Fuller, RI - Nine Mile Point E. Knutson, RI - Nine Mile Point K. Kolek, DRP, OA D. Screnci, ORA N. Sheehan, ORA DRS Branch Chiefs Institute of Nuclear Power Operations (INPO)

RidsNrrDirslpab ROPreports@nrc.gov Region I Docket Room (with concurrences)

DOCUMENT NAME: S:\\ROP-6 EOC Review\\ROP-6 Annual Assessment Letters\\NMP EOC.wpd SISP Review Complete: JMT (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME LCline/JMT CKhan/JMT JTrapp/JMT DATE 02/28/06 02/28/06 02/28/06 OFFICIAL RECORD COPY

Nine Mile Point Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2006 14:58:44 Report 22 5

TRI FIRE

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 05/08/2006 05/12/2006 1, 2 7111105T IP Fire Protection [Triennial]

Baseline Inspections 05/22/2006 05/26/2006 1, 2 7111105T IP Fire Protection [Triennial]

1 71121

- OCC RAD SAFETY Baseline Inspections 03/27/2006 03/31/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/27/2006 03/31/2006 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 03/27/2006 03/31/2006 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1

7111108G

- INSERVICE INSPECTION - UNIT 2 Baseline Inspections 04/03/2006 04/07/2006 2

7111108G IP Inservice Inspection Activities - BWR 1

7111112B

- MAINTENANCE RULE Baseline Inspections 06/19/2006 06/23/2006 1, 2 7111112B IP Maintenance Effectiveness 1

71121

- OCC RAD SAFETY Baseline Inspections 06/26/2006 06/30/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 06/26/2006 06/30/2006 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 06/26/2006 06/30/2006 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1

71114

- EP PRGM INSP & PI VERIFICATION Baseline Inspections 07/17/2006 07/21/2006 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 07/17/2006 07/21/2006 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 07/17/2006 07/21/2006 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 07/17/2006 07/21/2006 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 07/17/2006 07/21/2006 1, 2 71151 IP Performance Indicator Verification 1

7112203

- PUB RAD SAFETY - REMP Baseline Inspections 08/28/2006 09/01/2006 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 3

7111111B

- L.O. REQUAL.PROG. (FOCUS U1)+P/F RVW Baseline Inspections 10/09/2006 10/13/2006 1, 2 7111111B IP Licensed Operator Requalification Program 8

7111121

- CDBI (COMPONENT DESIGN BASES INSPECTION)

Baseline Inspections 09/11/2006 09/15/2006 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 09/25/2006 09/29/2006 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/09/2006 10/13/2006 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/16/2006 10/20/2006 1, 2 7111121 IP Component Design Bases Inspection 1

71121

- OCC RAD SAFETY Baseline Inspections 10/23/2006 10/27/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/23/2006 10/27/2006 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 10/23/2006 10/27/2006 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 10/23/2006 10/27/2006 1, 2 71151 IP Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Nine Mile Point Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2006 14:58:44 Report 22 4

12/11+EX

- U1 OPERATOR LICENSING INITIAL EXAM Not Applicable 11/13/2006 11/17/2006 1

U01662 FY07 - NINE MILE POINT (UNIT 1) INITIAL OPERATOR EXAM Not Applicable 12/11/2006 12/22/2006 1

U01662 FY07 - NINE MILE POINT (UNIT 1) INITIAL OPERATOR EXAM 2

7111107B

- HEAT SINK Baseline Inspections 11/13/2006 11/17/2006 1, 2 7111107B IP Heat Sink Performance 1

7112202

- PUB RAD SAFETY - RADWASTE Baseline Inspections 12/11/2006 12/15/2006 1, 2 7112202 IP Radioactive Material Processing and Transportation 1

71121

- OCC RAD SAFETY Baseline Inspections 03/26/2007 03/30/2007 1

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/26/2007 03/30/2007 1

7112102 IP ALARA Planning and Controls Baseline Inspections 03/26/2007 03/30/2007 1

7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1

71121

- OCC RAD SAFETY Baseline Inspections 05/21/2007 05/25/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 05/21/2007 05/25/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 05/21/2007 05/25/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 5

71152B

- PI&R Baseline Inspections 06/11/2007 06/15/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 06/25/2007 06/29/2007 1, 2 71152B IP Identification and Resolution of Problems 1

7112201

- PUB RAD SAFETY - RETS Baseline Inspections 07/30/2007 08/03/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 4

7111117B

- MODS AND 50.59 Baseline Inspections 09/10/2007 09/14/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 09/10/2007 09/14/2007 1, 2 7111117B IP Permanent Plant Modifications This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.