UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

475 ALLENDALE ROAD

KING OF PRUSSIA, PA 19406-1415

March 3, 2008

Mr. Keith J. Polson

Vice President Nine Mile Point

Nine Mile Point Nuclear Station, LLC

P.O. Box 63

Lycoming, NY 13093

SUBJECT:

ANNUAL ASSESSMENT LETTER - NINE MILE POINT NUCLEAR STATION

(REPORTS 05000220/2008001 AND 05000410/2008001)

Dear Mr. Polson:

On February 12, 2008, the U.S. Nuclear Regulatory Commission (NRC) staff completed its

performance review of Nine Mile Point Nuclear Station (NMPNS). Our technical staff reviewed

performance indicators (PIs) for the most recent quarter and inspection results for the period

from January 1 through December 31, 2007. The purpose of this letter is to inform you of our

assessment of your safety performance during this period and our plans for future inspections at

your facility.

This performance review and enclosed inspection plan do not include security information. A

separate letter designated and marked as Official Use OnlySecurity Information will include

the security cornerstone review and resultant inspection plan.

Overall, NMPNS Units 1 and 2 operated in a manner that preserved public health and safety

and fully met all cornerstone objectives. Plant performance at Unit 1 for the most recent quarter

was within the Regulatory Response column of the NRCs Action Matrix based upon all Green

PIs and one finding of low to moderate safety significance (White) identified in January 2007.

The White finding involved your Licensed Operator Requalification Training Program for Unit 1.

Specifically, the annual dynamic simulator exam integrity was unintentionally compromised at

Unit 1 for calendar years 2005 and 2006. The NRC has completed a supplemental inspection in

accordance with inspection procedure 95001. The results of that inspection were provided in

NRC Supplemental Inspection Report 05000220/2007007. As a result of that review, this

finding will be closed and will no longer be considered for plant assessment purposes, effective

January 1, 2008. Plant performance at Unit 2 for the most recent quarter in 2007, was within

the Licensee Response column of the NRC's Action Matrix, based on all inspection findings

being classified as having very low safety significance (Green) and all PIs indicating

performance at a level requiring no additional NRC oversight. Therefore, we plan to conduct

reactor oversight process (ROP) baseline inspections at Units 1 and 2.

The enclosed inspection plan details the inspections, less those related to physical protection

scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of

any scheduling conflicts and personnel availability issues well in advance of inspector arrival

onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

K. Polson

2

The inspections in the last nine months of the inspection plan are tentative and may be revised

at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to

discuss the change as soon as possible. Please contact Glenn Dentel of my staff at

610-337-5233, with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

David C. Lew, Director

Division of Reactor Projects

Region I

Docket Nos. 50-220, 50-410

License Nos. DPR-63, NPF-69

Enclosure: Nine Mile Point Inspection/Activity Plan

cc w/encl:

M. J. Wallace, President, Constellation Generation

J.M. Heffley, Senior Vice President and Chief Nuclear Officer

C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, LLC

M. J. Wetterhahn, Esquire, Winston and Strawn

M. Balboni, Deputy Secretary, New York State Energy, Research, and Development Authority

J. Spath, Program Director, New York State Energy Research and Development Authority

P. D. Eddy, Electric Division, NYS Department of Public Service

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

Supervisor, Town of Scriba

T. Judson, Central NY Citizens Awareness Network

D. Katz, Citizens Awareness Network

C. Adrienne Rhodes, Chairman and Executive Director,

State Consumer Protection Board

K. Polson

2

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to

discuss the change as soon as possible. Please contact Glenn Dentel of my staff at

610-337-5233, with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

David C. Lew, Director

Division of Reactor Projects

Region I

Docket Nos. 50-220, 50-410

License Nos. DPR-63, NPF-69

Enclosure: Nine Mile Point Inspection/Activity Plan

cc w/encl:

M. J. Wallace, President, Constellation Generation

J.M. Heffley, Senior Vice President and Chief Nuclear Officer

C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, LLC

M. J. Wetterhahn, Esquire, Winston and Strawn

M. Balboni, Deputy Secretary, New York State Energy, Research, and Development Authority

J. Spath, Program Director, New York State Energy Research and Development Authority

P. D. Eddy, Electric Division, NYS Department of Public Service

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

Supervisor, Town of Scriba

T. Judson, Central NY Citizens Awareness Network

D. Katz, Citizens Awareness Network

C. Adrienne Rhodes, Chairman and Executive Director,

State Consumer Protection Board

DISTRIBUTION

See next page

SUNSI Review Complete: BAB (Reviewer=s Initials)

DOCUMENT NAME: S:\\ROP-8 EOC Review\\Annual Assessment Letters\\Branch 1\\NMP Annual Assessment Ltr.doc

After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with

attachment/enclosure "N" = No copy

OFFICE

RI/DRP

RI/DRP

RI/DRP

NAME

BBickett/BAB

GDentel/GTD

DLew/DCL

DATE

02/26/08

02/27/08

02/29/08

OFFICIAL RECORD COPY

K. Polson

3

Distribution w/encl:

S. Collins, RA

M. Dapas, DRA

G. West, RI OEDO (Acting)

J. Lubinski, NRR

D. Pickett, PM, NRR

M. David, PM, NRR

G. Dentel, DRP

E. Knutson, Senior Resident Inspector

D. Dempsey, Resident Inspector

K. Kolek, DRP, OA

Region I Docket Room (with concurrences)

ROPreports@nrc.gov (All IRs)

J. Trapp, DRS

J. Rogge, DRS

S. Hansell, DRS

J. White, DRS

L. Doerflein, DRS

R. Conte, DRS

L. Scholl, DRS

P. Frechette, DRS

D. Silk, DRS

D. Screnci, PAO

N. Sheehan, PAO

R. Barkley, ORA

D. Holody, ORA

J. Thompson, NRR (JWT1@nrc.gov)

Nine Mile Point

Inspection / Activity Plan

01/01/2008 - 06/30/2009

Inspection

Type

Inspection Activity

Planned Dates

Start End

No. of Staff

on Site

Title

Unit

Number

Page 1 of 2

02/28/2008

15:47:46

Report 22

3

3/10 EXM

- U2 INITIAL OPERATOR LICENSING EXAM

Not Applicable

FY08 NINE MILE POINT U- 2 OL EXAM

02/04/2008

02/08/2008

1

U01740

Not Applicable

FY08 NINE MILE POINT U- 2 OL EXAM

03/10/2008

03/14/2008

1

U01740

1

7111108G

- U2 INSERVICE INSPECTION

Baseline Inspections

Inservice Inspection Activities - BWR

03/24/2008

03/28/2008

2

7111108G

IP

1

71121

- OCC RAD SAFETY

Baseline Inspections

Access Control to Radiologically Significant Areas

03/24/2008

03/28/2008

1, 2

7112101

IP

Baseline Inspections

ALARA Planning and Controls

03/24/2008

03/28/2008

1, 2

7112102

IP

Baseline Inspections

Radiation Monitoring Instrumentation and Protective Equipment

03/24/2008

03/28/2008

1, 2

7112103

IP

5

10/6EXAM

- U1 INITIAL OPERATOR LICENSING EXAM

Not Applicable

FY09 - NINE MILE POINT 1 INITIAL OPERATOR EXAM

09/15/2008

09/19/2008

1

U01690

Not Applicable

FY09 - NINE MILE POINT 1 INITIAL OPERATOR EXAM

10/06/2008

10/17/2008

1

U01690

1

7112203

- PUB RAD SAFETY - REMP

Baseline Inspections

Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program

06/23/2008

06/27/2008

1, 2

7112203

IP

Baseline Inspections

RETS/ODCM Radiological Effluent

06/23/2008

06/27/2008

1, 2

71151-PR01

IP

1

EP

- EP PROGRAM INSPECTION

EP Baseline Inspection

Alert and Notification System Testing

07/14/2008

07/18/2008

1, 2

7111402

IP

EP Baseline Inspection

Emergency Response Organization Augmentation Testing

07/14/2008

07/18/2008

1, 2

7111403

IP

EP Baseline Inspection

Emergency Action Level and Emergency Plan Changes

07/14/2008

07/18/2008

1, 2

7111404

IP

EP Baseline Inspection

Correction of Emergency Preparedness Weaknesses and Deficiencies

07/14/2008

07/18/2008

1, 2

7111405

IP

Baseline Inspections

Drill/Exercise Performance

07/14/2008

07/18/2008

1, 2

71151-EP01

IP

Baseline Inspections

ERO Drill Participation

07/14/2008

07/18/2008

1, 2

71151-EP02

IP

Baseline Inspections

Alert & Notification System

07/14/2008

07/18/2008

1, 2

71151-EP03

IP

4

TI 171

- TI 171

Generic Safety Inspectio

Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies

07/28/2008

08/01/2008

1, 2

2515/171

IP

1

71121

- OCC RAD SAFETY

Baseline Inspections

Access Control to Radiologically Significant Areas

08/11/2008

08/15/2008

1, 2

7112101

IP

Baseline Inspections

ALARA Planning and Controls

08/11/2008

08/15/2008

1, 2

7112102

IP

Baseline Inspections

Radiation Monitoring Instrumentation and Protective Equipment

08/11/2008

08/15/2008

1, 2

7112103

IP

3

7111111B

- L.O.REQUAL.PROG.(FOCUS U1)+P/F RVW

Baseline Inspections

Licensed Operator Requalification Program

12/01/2008

12/05/2008

1, 2

7111111B

IP

6

7111121

- CDBI

Baseline Inspections

Component Design Bases Inspection

10/06/2008

10/10/2008

1, 2

7111121

IP

Baseline Inspections

Component Design Bases Inspection

10/20/2008

10/24/2008

1, 2

7111121

IP

Baseline Inspections

Component Design Bases Inspection

10/27/2008

10/31/2008

1, 2

7111121

IP

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Nine Mile Point

Inspection / Activity Plan

01/01/2008 - 06/30/2009

Inspection

Type

Inspection Activity

Planned Dates

Start End

No. of Staff

on Site

Title

Unit

Number

Page 2 of 2

02/28/2008

15:47:46

Report 22

1

71121

- OCC RAD SAFETY

Baseline Inspections

Access Control to Radiologically Significant Areas

11/03/2008

11/07/2008

1, 2

7112101

IP

Baseline Inspections

ALARA Planning and Controls

11/03/2008

11/07/2008

1, 2

7112102

IP

Baseline Inspections

Occupational Exposure Control Effectiveness

11/03/2008

11/07/2008

1, 2

71151-OR01

IP

Baseline Inspections

RETS/ODCM Radiological Effluent

11/03/2008

11/07/2008

1, 2

71151-PR01

IP

1

7112202

- PUB RAD SAFETY - RADWASTE

Baseline Inspections

Radioactive Material Processing and Transportation

12/08/2008

12/12/2008

1, 2

7112202

IP

1

7112201

- PUB RAD SAFETY - RETS

Baseline Inspections

Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems

02/09/2009

02/13/2009

1, 2

7112201

IP

1

7111108G

- U1 INSERVICE INSPECTION

Baseline Inspections

Inservice Inspection Activities - BWR

03/23/2009

03/27/2009

1

7111108G

IP

1

71121

- OCC RAD SAFETY

Baseline Inspections

Access Control to Radiologically Significant Areas

03/23/2009

03/27/2009

1

7112101

IP

Baseline Inspections

ALARA Planning and Controls

03/23/2009

03/27/2009

1

7112102

IP

Baseline Inspections

Radiation Monitoring Instrumentation and Protective Equipment

03/23/2009

03/27/2009

1

7112103

IP

3

TRI FIRE

- TRIENNIAL FIRE PROTECTION INSPECTION

Baseline Inspections

Fire Protection [Triennial]

06/01/2009

06/05/2009

1, 2

7111105T

IP

Baseline Inspections

Fire Protection [Triennial]

06/15/2009

06/19/2009

1, 2

7111105T

IP