2007 Annual Assessment Letter EOC 2007 ROP8 - Nine Mile Point (05000220-08-001, 05000410-08-001)
ML080610012
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 03/03/2008
From: David Lew
Division Reactor Projects I
To: Polson K
Nine Mile Point
Dentel, G RGN-I/DRP/BR1/610-337-5233
References
IR-08-001
Download: ML080610012 (6)


See also: IR 05000220/2008001

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

475 ALLENDALE ROAD

KING OF PRUSSIA, PA 19406-1415

March 3, 2008

Mr. Keith J. Polson

Vice President Nine Mile Point

Nine Mile Point Nuclear Station, LLC

P.O. Box 63

Lycoming, NY 13093

SUBJECT: ANNUAL ASSESSMENT LETTER - NINE MILE POINT NUCLEAR STATION

(REPORTS 05000220/2008001 AND 05000410/2008001)

Dear Mr. Polson:

On February 12, 2008, the U.S. Nuclear Regulatory Commission (NRC) staff completed its

performance review of Nine Mile Point Nuclear Station (NMPNS). Our technical staff reviewed

performance indicators (PIs) for the most recent quarter and inspection results for the period

from January 1 through December 31, 2007. The purpose of this letter is to inform you of our

assessment of your safety performance during this period and our plans for future inspections at

your facility.

This performance review and enclosed inspection plan do not include security information. A

separate letter designated and marked as Official Use OnlySecurity Information will include

the security cornerstone review and resultant inspection plan.

Overall, NMPNS Units 1 and 2 operated in a manner that preserved public health and safety

and fully met all cornerstone objectives. Plant performance at Unit 1 for the most recent quarter

was within the Regulatory Response column of the NRCs Action Matrix based upon all Green

PIs and one finding of low to moderate safety significance (White) identified in January 2007.

The White finding involved your Licensed Operator Requalification Training Program for Unit 1.

Specifically, the annual dynamic simulator exam integrity was unintentionally compromised at

Unit 1 for calendar years 2005 and 2006. The NRC has completed a supplemental inspection in

accordance with inspection procedure 95001. The results of that inspection were provided in

NRC Supplemental Inspection Report 05000220/2007007. As a result of that review, this

finding will be closed and will no longer be considered for plant assessment purposes, effective

January 1, 2008. Plant performance at Unit 2 for the most recent quarter in 2007, was within

the Licensee Response column of the NRC's Action Matrix, based on all inspection findings

being classified as having very low safety significance (Green) and all PIs indicating

performance at a level requiring no additional NRC oversight. Therefore, we plan to conduct

reactor oversight process (ROP) baseline inspections at Units 1 and 2.

The enclosed inspection plan details the inspections, less those related to physical protection

scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of

any scheduling conflicts and personnel availability issues well in advance of inspector arrival

onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

K. Polson 2

The inspections in the last nine months of the inspection plan are tentative and may be revised

at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to

discuss the change as soon as possible. Please contact Glenn Dentel of my staff at

610-337-5233, with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

David C. Lew, Director

Division of Reactor Projects

Region I

Docket Nos. 50-220, 50-410

License Nos. DPR-63, NPF-69

Enclosure: Nine Mile Point Inspection/Activity Plan

cc w/encl:

M. J. Wallace, President, Constellation Generation

J.M. Heffley, Senior Vice President and Chief Nuclear Officer

C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, LLC

M. J. Wetterhahn, Esquire, Winston and Strawn

M. Balboni, Deputy Secretary, New York State Energy, Research, and Development Authority

J. Spath, Program Director, New York State Energy Research and Development Authority

P. D. Eddy, Electric Division, NYS Department of Public Service

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

Supervisor, Town of Scriba

T. Judson, Central NY Citizens Awareness Network

D. Katz, Citizens Awareness Network

C. Adrienne Rhodes, Chairman and Executive Director,

State Consumer Protection Board

K. Polson 2

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to

discuss the change as soon as possible. Please contact Glenn Dentel of my staff at

610-337-5233, with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

David C. Lew, Director

Division of Reactor Projects

Region I

Docket Nos. 50-220, 50-410

License Nos. DPR-63, NPF-69

Enclosure: Nine Mile Point Inspection/Activity Plan

cc w/encl:

M. J. Wallace, President, Constellation Generation

J.M. Heffley, Senior Vice President and Chief Nuclear Officer

C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, LLC

M. J. Wetterhahn, Esquire, Winston and Strawn

M. Balboni, Deputy Secretary, New York State Energy, Research, and Development Authority

J. Spath, Program Director, New York State Energy Research and Development Authority

P. D. Eddy, Electric Division, NYS Department of Public Service

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

Supervisor, Town of Scriba

T. Judson, Central NY Citizens Awareness Network

D. Katz, Citizens Awareness Network

C. Adrienne Rhodes, Chairman and Executive Director,

State Consumer Protection Board

DISTRIBUTION

See next page

SUNSI Review Complete: BAB (Reviewer=s Initials)

DOCUMENT NAME: S:\ROP-8 EOC Review\Annual Assessment Letters\Branch 1\NMP Annual Assessment Ltr.doc

After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with

attachment/enclosure "N" = No copy

OFFICE RI/DRP RI/DRP RI/DRP

NAME BBickett/BAB GDentel/GTD DLew/DCL

DATE 02/26/08 02/27/08 02/29/08

OFFICIAL RECORD COPY

K. Polson 3

Distribution w/encl:

S. Collins, RA J. Rogge, DRS

M. Dapas, DRA S. Hansell, DRS

G. West, RI OEDO (Acting) J. White, DRS

J. Lubinski, NRR L. Doerflein, DRS

D. Pickett, PM, NRR R. Conte, DRS

M. David, PM, NRR L. Scholl, DRS

G. Dentel, DRP P. Frechette, DRS

E. Knutson, Senior Resident Inspector D. Silk, DRS

D. Dempsey, Resident Inspector D. Screnci, PAO

K. Kolek, DRP, OA N. Sheehan, PAO

Region I Docket Room (with concurrences) R. Barkley, ORA

ROPreports@nrc.gov (All IRs) D. Holody, ORA

J. Trapp, DRS J. Thompson, NRR (JWT1@nrc.gov)

Page 1 of 2 Nine Mile Point

02/28/2008 15:47:46 Inspection / Activity Plan

Report 22

01/01/2008 - 06/30/2009

Unit No. of Staff Planned Dates Inspection

Number Inspection Activity Title on Site Start End Type

3/10 EXM - U2 INITIAL OPERATOR LICENSING EXAM 3

1 U01740 FY08 NINE MILE POINT U- 2 OL EXAM 02/04/2008 02/08/2008 Not Applicable

1 U01740 FY08 NINE MILE POINT U- 2 OL EXAM 03/10/2008 03/14/2008 Not Applicable

7111108G - U2 INSERVICE INSPECTION 1

2 IP 7111108G Inservice Inspection Activities - BWR 03/24/2008 03/28/2008 Baseline Inspections

71121 - OCC RAD SAFETY 1

1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/24/2008 03/28/2008 Baseline Inspections

1, 2 IP 7112102 ALARA Planning and Controls 03/24/2008 03/28/2008 Baseline Inspections

1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/24/2008 03/28/2008 Baseline Inspections

10/6EXAM - U1 INITIAL OPERATOR LICENSING EXAM 5

1 U01690 FY09 - NINE MILE POINT 1 INITIAL OPERATOR EXAM 09/15/2008 09/19/2008 Not Applicable

1 U01690 FY09 - NINE MILE POINT 1 INITIAL OPERATOR EXAM 10/06/2008 10/17/2008 Not Applicable

7112203 - PUB RAD SAFETY - REMP 1

1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 06/23/2008 06/27/2008 Baseline Inspections

1, 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 06/23/2008 06/27/2008 Baseline Inspections

EP - EP PROGRAM INSPECTION 1

1, 2 IP 7111402 Alert and Notification System Testing 07/14/2008 07/18/2008 EP Baseline Inspection

1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 07/14/2008 07/18/2008 EP Baseline Inspection

1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/14/2008 07/18/2008 EP Baseline Inspection

1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 07/14/2008 07/18/2008 EP Baseline Inspection

1, 2 IP 71151-EP01 Drill/Exercise Performance 07/14/2008 07/18/2008 Baseline Inspections

1, 2 IP 71151-EP02 ERO Drill Participation 07/14/2008 07/18/2008 Baseline Inspections

1, 2 IP 71151-EP03 Alert & Notification System 07/14/2008 07/18/2008 Baseline Inspections

TI 171 - TI 171 4

1, 2 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 07/28/2008 08/01/2008 Generic Safety Inspectio

71121 - OCC RAD SAFETY 1

1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/11/2008 08/15/2008 Baseline Inspections

1, 2 IP 7112102 ALARA Planning and Controls 08/11/2008 08/15/2008 Baseline Inspections

1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/11/2008 08/15/2008 Baseline Inspections

7111111B - L.O.REQUAL.PROG.(FOCUS U1)+P/F RVW 3

1, 2 IP 7111111B Licensed Operator Requalification Program 12/01/2008 12/05/2008 Baseline Inspections

7111121 - CDBI 6

1, 2 IP 7111121 Component Design Bases Inspection 10/06/2008 10/10/2008 Baseline Inspections

1, 2 IP 7111121 Component Design Bases Inspection 10/20/2008 10/24/2008 Baseline Inspections

1, 2 IP 7111121 Component Design Bases Inspection 10/27/2008 10/31/2008 Baseline Inspections

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Nine Mile Point

02/28/2008 15:47:46 Inspection / Activity Plan

Report 22

01/01/2008 - 06/30/2009

Unit No. of Staff Planned Dates Inspection

Number Inspection Activity Title on Site Start End Type

71121 - OCC RAD SAFETY 1

1, 2 IP 7112101 Access Control to Radiologically Significant Areas 11/03/2008 11/07/2008 Baseline Inspections

1, 2 IP 7112102 ALARA Planning and Controls 11/03/2008 11/07/2008 Baseline Inspections

1, 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 11/03/2008 11/07/2008 Baseline Inspections

1, 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 11/03/2008 11/07/2008 Baseline Inspections

7112202 - PUB RAD SAFETY - RADWASTE 1

1, 2 IP 7112202 Radioactive Material Processing and Transportation 12/08/2008 12/12/2008 Baseline Inspections

7112201 - PUB RAD SAFETY - RETS 1

1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 02/09/2009 02/13/2009 Baseline Inspections

7111108G - U1 INSERVICE INSPECTION 1

1 IP 7111108G Inservice Inspection Activities - BWR 03/23/2009 03/27/2009 Baseline Inspections

71121 - OCC RAD SAFETY 1

1 IP 7112101 Access Control to Radiologically Significant Areas 03/23/2009 03/27/2009 Baseline Inspections

1 IP 7112102 ALARA Planning and Controls 03/23/2009 03/27/2009 Baseline Inspections

1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/23/2009 03/27/2009 Baseline Inspections

TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 3

1, 2 IP 7111105T Fire Protection [Triennial] 06/01/2009 06/05/2009 Baseline Inspections

1, 2 IP 7111105T Fire Protection [Triennial] 06/15/2009 06/19/2009 Baseline Inspections

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.