Mid-Cycle Performance Review and Inspection Plan - 2013 Nine Mile Point Nuclear Station Units 1 and 2
ML12244A327
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 09/04/2012
From: Glenn Dentel
Reactor Projects Branch 1
To: Langdon K
Nine Mile Point
Dentel G
References
IR-12-006
Download: ML12244A327 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 September 4, 2012 Mr. Kenneth Langdon, Site Vice President Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093-0063

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

NINE MILE POINT NUCLEAR STATION UNITS 1 AND 2 (REPORT 05000220/2012006 AND 05000410/2012006)

Dear Mr. Langdon:

On August 14, 2012,S the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Nine Mile Point Nuclear Station (NMPNS) Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011 through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into the ROP performance assessment program governed by IMC 0305, Operating Reactor Assessment Program.

The NRC determined the performance at NMPNS Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP)

Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2013.

Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agencys actions related to Fukushima, the NRC will perform TI-187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns and TI-188 Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns. Additionally, inspections will be performed for the preparations and initial loading of your Independent Spent Fuel Storage Installation. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

K. Langdon 2

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5233 with any questions you have regarding this letter.

Sincerely,

/RA/

Glenn T. Dentel Chief Projects Branch 1 Division of Reactor Projects Docket Nos. 50-220, 50-410 License Nos. DPR-63, NFP-69

Enclosure:

Inspection Plan cc w/encl: Distribution via ListServ

ML12244A327 SUNSI Review Non-Sensitive Sensitive

Publicly Available

Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SShaffer GDentel DATE 08/23/12 08/31/12

Page 1 of 2 08/22/2012 14:29:47 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Nine Mile Point Inspection / Activity Plan 07/01/2012 - 12/31/2013 EP PROGR

- EP PROGRAM INSPECTION 1

1, 2 IP Alert and Notification System Testing 7111402 07/16/2012 07/20/2012 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 07/16/2012 07/20/2012 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 07/16/2012 07/20/2012 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 07/16/2012 07/20/2012 60854

- ISFSI DRY RUN & INITIAL LOADING 3

1, 2 IP Preoperational Testing Of An ISFSI 60854 07/23/2012 07/27/2012 1, 2 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 60854.1 07/23/2012 07/27/2012 1, 2 IP Preoperational Testing Of An ISFSI 60854 08/27/2012 08/31/2012 1, 2 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 60854.1 08/27/2012 08/31/2012 1, 2 IP Review of 10 CFR 72.212(b) Evaluations 60856 08/27/2012 08/31/2012 1, 2 IP Review of 10 CFR 72.212(b) Evaluations at Operating Plants 60856.1 08/27/2012 08/31/2012 1, 2 IP Operation Of An ISFSI 60855 09/10/2012 09/14/2012 1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 09/10/2012 09/14/2012 71124

- AIRBORNE RAD & DOSE ASSESSMENT 1

1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 07/23/2012 07/26/2012 1

IP Occupational Dose Assessment 71124.04 07/23/2012 07/26/2012 TI-187

- TI-187 INSP NTTF - FLOODING WALKDOWNS 2

1, 2 IP Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 2515/187 07/23/2012 12/31/2012 TI-188

- TI-188 INSP NTTF - SEISMIC WALKDOWNS 2

1, 2 IP Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns 2515/188 07/23/2012 12/31/2012 71004

- FAC INSP POWER UPRATE 1

1, 2 IP Power Uprate 71004 08/06/2012 08/10/2012 7111111B

- NMP1 ON-SITE RQL INSP W/ P/F RESULTS 2

1 IP Licensed Operator Requalification Program 7111111B 11/12/2012 11/16/2012 71124

- RAD MONT INSTRUMENTATION 1

1, 2 IP Radiation Monitoring Instrumentation 71124.05 09/24/2012 09/27/2012 71124

- RAD EFFLUENT MONITOR TREATMENT PI 1

1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 11/26/2012 11/29/2012 1

IP Occupational Exposure Control Effectiveness 71151-OR01 11/26/2012 11/29/2012 2

IP RETS/ODCM Radiological Effluent 71151-PR01 11/26/2012 11/29/2012 11/12EXM

- NMP1 INITIAL EXAM 4

1 FY13-NMP1 INITIAL OPERATOR LICENSING EXAM U01861 04/15/2013 04/19/2013 1

FY13-NMP1 INITIAL OPERATOR LICENSING EXAM U01861 05/13/2013 05/24/2013 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 08/22/2012 14:29:47 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Nine Mile Point Inspection / Activity Plan 07/01/2012 - 12/31/2013 71124

- RAD HAZARD ACCESS/ALARA 1

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/25/2013 02/28/2013 1

IP Occupational ALARA Planning and Controls 71124.02 02/25/2013 02/28/2013 71124

- HP INSPECTION IP 71124.01,.02,.03 &.04 1

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/01/2013 04/04/2013 1

IP Occupational ALARA Planning and Controls 71124.02 04/01/2013 04/04/2013 1

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/01/2013 04/04/2013 1

IP Occupational Dose Assessment 71124.04 04/01/2013 04/04/2013 7111108G

- U1 INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - BWR 7111108G 04/08/2013 04/12/2013 71124

- RAD ENVIRONMENTAL MONITORING PROGRAM 1

1 IP Radiological Environmental Monitoring Program 71124.07 05/05/2013 05/10/2013 EP EX

- EP EXERCISE EVALUATION 5

1, 2 IP Exercise Evaluation 7111401 06/17/2013 06/21/2013 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 06/17/2013 06/21/2013 PI&R

- PI&R 4

1, 2 IP Problem Identification and Resolution 71152B 08/05/2013 08/09/2013 1, 2 IP Problem Identification and Resolution 71152B 08/19/2013 08/23/2013 7111117

- PERMANENT PLANT MODIFICATIONS 3

1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 09/16/2013 09/20/2013 1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 09/30/2013 10/04/2013 7111111B

- NMP2 REQUAL INSPECTION WITH P/F RESULTS 2

2 IP Licensed Operator Requalification Program 7111111B 12/02/2013 12/06/2013 7111107T

- TRIENNIAL HEAT SINK 1

1, 2 IP Heat Sink Performance 7111107T 11/18/2013 11/22/2013 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.