UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2006 Mr. Timothy J. OConnor Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - NINE MILE POINT NUCLEAR STATION

Dear Mr. OConnor:

On August 9, 2006, the NRC staff completed its performance review of Nine Mile Point Nuclear Station for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter at Nine Mile Point Units 1 and 2 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

2 T. OConner If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Brian J. McDermott, Chief Projects Branch 1 Division of Reactor Projects Docket Nos. 50-220, 50-410 License Nos. DPR-63, DPR-59

Enclosure:

Nine Mile Point Inspection/Activity Plan cc w/encl:

M. J. Wallace, President, Constellation Generation M. Heffley, Senior Vice President and Chief Nuclear Officer C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, LLC M. J. Wetterhahn, Esquire, Winston and Strawn P. Smith, President, New York State Energy, Research, and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority P. D. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law Supervisor, Town of Scriba T. Judson, Central NY Citizens Awareness Network D. Katz, Citizens Awareness Network

2 T. OConner If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Brian J. McDermott, Chief Projects Branch 1 Division of Reactor Projects Docket Nos. 50-220, 50-410 License Nos. DPR-63, DPR-59

Enclosure:

Nine Mile Point Inspection/ Activity Plan Distribution w/encl:

S. Collins, RA M. Dapas, DRA B. Sosa, RI OEDO R. Laufer, NRR J. Boska, PM, NRR B. McDermott, DRP A. Burritt, DRP K. Kolaczyk, DRP, Senior Resident Inspector M. Marshfield, DRP, Resident Inspector S. DiMora, DRP, Resident OA Region I Docket Room (with concurrences)

D. Screnci, PAO N. Sheenhan, PAO DRS Director DRS Deputy Director DRS Branch Chiefs RidsNrrDiplipb@nrs.gov Institute of Nuclear Power Operations (INPO)

SUNSI Review Complete: __ALB______ (Reviewers Initials)

DOCUMENT NAME: S:\\ROP 7 Mid Cycle Review\\2006 ROP7 Mid-Cycle Letters\\Nine Mile ROP-7 Mid-Cycle Ltr.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME LCline/ALB ABurritt BMcDermott DATE 08/25/06 08/25/06 08/31/06 OFFICIAL RECORD COPY

Nine Mile Point Inspection / Activity Plan 07/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/31/2006 09:37:27 Report 22 3

92709

- STRIKE CONTINGENCY PLANS Other Routine 06/01/2006 07/31/2006 1, 2 92709 IP Licensee Strike Contingency Plans 8

92711-OA

- CONTINUED IMPLEMENTATION OF STRIKE PLANS Other Routine 07/01/2006 07/15/2006 1, 2 92711 IP Continued Implementation Of Strike Plans During An Extended Strike 2

71114

- EP PRGM INSP & PI VERIFICATION Baseline Inspections 07/31/2006 08/04/2006 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 07/31/2006 08/04/2006 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 07/31/2006 08/04/2006 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 07/31/2006 08/04/2006 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 07/31/2006 08/04/2006 1, 2 71151 IP Performance Indicator Verification 7

7111121

- CDBI (COMPONENT DESIGN BASES INSPECTION)

Baseline Inspections 09/11/2006 09/15/2006 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 09/25/2006 09/29/2006 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/09/2006 10/13/2006 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/16/2006 10/20/2006 1, 2 7111121 IP Component Design Bases Inspection 3

7111111B

- L.O. REQUAL.PROG. (FOCUS U1)+P/F RVW Baseline Inspections 10/09/2006 10/13/2006 1, 2 7111111B IP Licensed Operator Requalification Program 2

TI 169

- MSPI VERIFICATION Safety Issues 10/01/2006 12/31/2006 1, 2 2515/169 IP Mitigating Systems Performance Index Verification 1

71121

- OCC RAD SAFETY Baseline Inspections 10/30/2006 11/03/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/30/2006 11/03/2006 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 10/30/2006 11/03/2006 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 10/30/2006 11/03/2006 1, 2 71151 IP Performance Indicator Verification 3

12/11+EX

- U1 OPERATOR LICENSING INITIAL EXAM Not Applicable 11/13/2006 11/17/2006 1

U01662 FY07 - NINE MILE POINT (UNIT 1) INITIAL OPERATOR EXAM Not Applicable 12/11/2006 12/22/2006 1

U01662 FY07 - NINE MILE POINT (UNIT 1) INITIAL OPERATOR EXAM 2

7111107B

- HEAT SINK Baseline Inspections 11/13/2006 11/17/2006 1, 2 7111107B IP Heat Sink Performance 1

7112202

- PUB RAD SAFETY - RADWASTE Baseline Inspections 12/11/2006 12/15/2006 1, 2 7112202 IP Radioactive Material Processing and Transportation 1

71121

- OCC RAD SAFETY Baseline Inspections 03/26/2007 03/30/2007 1

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/26/2007 03/30/2007 1

7112102 IP ALARA Planning and Controls Baseline Inspections 03/26/2007 03/30/2007 1

7112103 IP Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Nine Mile Point Inspection / Activity Plan 07/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/31/2006 09:37:27 Report 22 1

71121

- OCC RAD SAFETY Baseline Inspections 05/21/2007 05/25/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 05/21/2007 05/25/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 05/21/2007 05/25/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 5

71152B

- PI&R Baseline Inspections 06/11/2007 06/15/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 06/25/2007 06/29/2007 1, 2 71152B IP Identification and Resolution of Problems 1

7112203

- PUB RAD SAFETY - REMP Baseline Inspections 06/04/2007 06/08/2007 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1

7112201

- PUB RAD SAFETY - RETS Baseline Inspections 07/30/2007 08/03/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 3

7111111B

- L.O.REQUAL.PROG.(FOCUS U2)+P/F RVW Baseline Inspections 10/29/2007 11/02/2007 1, 2 7111111B IP Licensed Operator Requalification Program 4

7111117B

- MODS AND 50.59 Baseline Inspections 09/10/2007 09/14/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 09/10/2007 09/14/2007 1, 2 7111117B IP Permanent Plant Modifications 1

71121

- OCC RAD SAFETY Baseline Inspections 11/05/2007 11/09/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/05/2007 11/09/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 11/05/2007 11/09/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 11/05/2007 11/09/2007 1, 2 71151 IP Performance Indicator Verification 4

7111401

- EP EXERCISE & PI VERIFICATION Baseline Inspections 11/12/2007 11/16/2007 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 11/12/2007 11/16/2007 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 11/12/2007 11/16/2007 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 11/12/2007 11/16/2007 1, 2 71151-EP03 IP Alert & Notification System 1

71121

- OCC RAD SAFETY Baseline Inspections 03/24/2008 03/28/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/24/2008 03/28/2008 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 03/24/2008 03/28/2008 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.