03/03/2010, Fermi Power Plant EOC Annual Assessment Letter (05000341-10-001)
ML100610249
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/03/2010
From: John Giessner
Reactor Projects Region 3 Branch 4
To: Davis J M
Detroit Edison
References
IR-10-001
Download: ML100610249 (6)


Text

March 3, 2010

Mr. Jack Senior Vice President and

Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166

SUBJECT: ANNUAL ASSESSMENT LETTER - FERMI POWER PLANT, UNIT 2 (05000341/2010001)

Dear Mr. Davis:

On February 10, 2010, the NRC staff completed its performance review of Fermi Power Plant, Unit 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the Security Cornerstone review and resultant inspection plan.

Overall, Fermi Unit 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC

=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC

oversight (Green). Therefore, we plan to condu ct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several special and infrequently performed inspection procedures (IPs) which include: IP 60854.1, "Preoperational Testing of Independent Spent Fuel Storage Facility Installations at Operating Plants"; IP 60855.1,

"Operation of an Independent Spent Fuel Storage Installation at Operating Plants"; IP 92702,

"Follow-up on Traditional Enforcement Actions In cluding Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders"; and IP 92709, "Licensee Strike Contingency Plans." The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC

=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9619 with any questions you may have regarding this letter or the inspection plan.

Sincerely,/RA/ John B. Giessner, Chief

Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43

Enclosure:

Fermi Inspection/Activity Plan

cc w/encl: Distribution via ListServ

Inspection / Activity Plan Page 1 of 2 02/24/2010 Report 22 03/01/2010

-06/30/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Fermi ISFSI-ISFSI INSPECTION 2 2 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 60854.1 01/01/2010 05/31/2010 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 05/01/2010 07/31/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 03/29/2010 04/02/2010 STRIKE-STRIKE CONTINGENCY - OPS/MAINT/RP 2 2 IP Licensee Strike Contingency Plans 92709 03/29/2010 06/04/2010 TI-TEMPORARY INSTRUCTION 2515/180 1 2 IP Inspection of Procedures and Processes for Managing Fatigue 2515/180 05/20/2010 05/20/2010 BI EP-EP EXERCISE INSPECTION / PI VERIFICATION 3 2 IP Exercise Evaluation 7111401 06/07/2010 06/11/2010 2 IP Drill/Exercise Performance 71151-EP01 06/07/2010 06/11/2010 2 IP ERO Drill Participation 71151-EP02 06/07/2010 06/11/2010 2 IP A lert & Notification System 71151-EP03 06/07/2010 06/11/2010 OL PREP-FERMI INIT PREP - AUG. 2010 3 2 IP Followup On Corrective Actions For Violations And Deviations 92702 08/09/2010 08/13/2010 2 OL - INITIAL EXAM - AUG 2010 - FERM W90219 08/09/2010 08/13/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 08/23/2010 08/27/2010 2 IP Occupational ALARA Planning and Controls 71124.02 08/23/2010 08/27/2010 2 IP Reactor Coolant System Activity 71151-BI01 08/23/2010 08/27/2010 2 IP Occupational Exposure Control Effectiveness 71151-OR01 08/23/2010 08/27/2010 2 IP RETS/ODCM Radiological Effluent 71151-PR01 08/23/2010 08/27/2010 OL EXAM-FERMI INIT EXAM - AUG. 2010 3 2 OL - INITIAL EXAM - AUG 2010 - FERM W90219 08/30/2010 09/03/2010 BI ENG-ENGINEERING INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - BWR 7111108G 10/24/2010 11/11/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/01/2010 11/05/2010 2 IP Occupational ALARA Planning and Controls 71124.02 11/01/2010 11/05/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 2 IP Radiation Monitoring Instrumentation 71124.05 11/29/2010 12/03/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 2 IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 03/28/2011 04/01/2011 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 02/24/2010 Report 22 03/01/2010

-06/30/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Fermi BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/28/2011 04/01/2011 2 IP Occupational ALARA Planning and Controls 71124.02 03/28/2011 04/01/2011 BI EP-EP ROUTINE INSPECTION / PI VERIFICATION 2 2 IP Radiological Environmental Monitoring Program 7111402 04/18/2011 04/22/2011 2 IP Emergency Response Organization Augmentation Testing 7111403 04/18/2011 04/22/2011 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 04/18/2011 04/22/2011 2 IP Drill/Exercise Performance 71151-EP01 04/18/2011 04/22/2011 2 IP ERO Drill Participation 71151-EP02 04/18/2011 04/22/2011 2 IP A lert & Notification System 71151-EP03 04/18/2011 04/22/2011 BI ENG-TRIENNIAL FIRE PROTECTION INSPECTION 3 2 IP Fire Protection [Triennial]

7111105T 04/18/2011 05/20/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 06/13/2011 06/17/2011 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/13/2011 06/17/2011 2 IP Occupational Dose Assessment 71124.04 06/13/2011 06/17/2011 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.