Category:Letter
MONTHYEARML24302A1962024-11-0101 November 2024 Ltr to SLO County Chumash Indians Re DCPP Dseis ML24302A2612024-11-0101 November 2024 Letter to Achp Re DCPP Dseis ML24302A1922024-11-0101 November 2024 Ltr to G. Frausto Coastal Band of Chumash Indians Re DCPP Dseis ML24302A1912024-11-0101 November 2024 Ltr to C. Mcdarment Tule River Tribe Re DCPP Dseis ML24302A1952024-11-0101 November 2024 Ltr to M. Olivas Tucker Ytt Re DCPP Dseis ML24302A1942024-11-0101 November 2024 Ltr to K. Kahn Santa Ynez Band of Chumash Indians Re DCPP Dseis ML24302A1972024-11-0101 November 2024 Letter to V. Sage Walker Northern Chumash Tribal Council Re DCPP Dseis ML24302A2622024-11-0101 November 2024 Letter to CA SHPO Regarding DCPP Dseis ML24302A1932024-11-0101 November 2024 Letter to G. Pierce Salinan Tribe of Monterey, SLO Re DCPP Dseis IR 05000275/20240032024-10-30030 October 2024 Integrated Inspection Report 05000275/2024003 and 05000323/2024003 and Independent Spent Fuel Storage Installation Report 07200026/2024001 ML24275A0622024-10-30030 October 2024 NRC to NMFS Request Initiate Formal Endangered Species Act Consultation and Abbreviated Essential Fish Habitat for Proposed License Renewal of DCP Plant Units 1, 2 ML24269A0122024-10-29029 October 2024 OEDO-24-00083 2.206 Petition Diablo Canyon Seismic CDF - Response to Petitioner Letter IR 05000275/20240132024-10-28028 October 2024 – License Renewal Report 05000275/2024013 and 05000323/2024013 ML24284A3122024-10-28028 October 2024 Ltr to P Ting, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants ML24284A3112024-10-28028 October 2024 Ltr to a Peck, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants ML24261B9492024-10-24024 October 2024 Issuance of Amendment Nos. 246 and 248 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 IR 05000275/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000275/2024404 and 05000323/2024404 ML24277A0292024-10-18018 October 2024 NRC to Fws Req. for Concurrence W. Endangered Species Act Determinations for Diablo Canyon Power Plant Units 1,2, ISFSI Proposed License Renewals in San Luis Obispo Co., CA DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 IR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation ML24240A0222024-09-20020 September 2024 Letter to A. Peck Environmental Impact Statement Scoping Summary Report for Diablo Canyon Nuclear Power Plant Units 1 and 2 ML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20243012024-07-10010 July 2024 NRC Initial Operator Licensing Examination Approval 05000275/2024301; 05000323/2024301 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL ML24155A2182024-06-18018 June 2024 OEDO-23-00350-NRR - (LTR-23-0228-1) - Closure Letter - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) ML24200A2052024-06-0707 June 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for Diablo Canyon License Renewal ML24099A2192024-05-29029 May 2024 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b 2024-09-09
[Table view] Category:License-Operator
MONTHYEARIR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis ML24250A0182024-08-0202 August 2024 DC-2024-07 Public Forms IR 05000275/20243012024-07-10010 July 2024 NRC Initial Operator Licensing Examination Approval 05000275/2024301; 05000323/2024301 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20213012023-08-0909 August 2023 Errata for Diablo Canyon Power Plant, Units 1 and 2 - NRC Examination Report 050002752021301 and 050003232021301 ML22342B2442022-12-13013 December 2022 DC-2023-07 Corporate Notification Letter DCL-21-017, DC-2021-01 Post Exam Comments Analysis2021-02-12012 February 2021 DC-2021-01 Post Exam Comments Analysis ML21075A2312021-02-12012 February 2021 DC-2021-01 Public Forms DCL-20-017, 2020-02-Post-Exam Comments2020-03-18018 March 2020 2020-02-Post-Exam Comments ML20097A4462020-03-0606 March 2020 2020-02-FINAL Operating Test ML20106E4702020-03-0606 March 2020 2020-02-FINAL Outlines ML20106F1862020-03-0606 March 2020 2020-02-Form ES-403-1-Written Examination Grading.Pdf ML20106E2762020-03-0606 March 2020 2020-02-Public Forms ML20106E4662020-03-0606 March 2020 2020-02-DRAFT Outlines ML20106E4632020-03-0606 March 2020 2020-02-DRAFT Operating Test ML20106E4672020-03-0606 March 2020 2020-02-DRAFT Written Exam Comments ML20106E4682020-03-0606 March 2020 2020-02-DRAFT Written Exam ML20106E4652020-03-0606 March 2020 2020-02-Draft Outline Comments ML20097A4502020-03-0606 March 2020 2020-02-FINAL Written Exam ML20106E4612020-03-0606 March 2020 2020-02-DRAFT Operating Test Comments DCL-19-027, Supplement to Request for Exemption from Operator Written Examination and Operating Test2019-04-0303 April 2019 Supplement to Request for Exemption from Operator Written Examination and Operating Test ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML19007A1132019-01-0303 January 2019 NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301 DCL-18-039, Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-05-14014 May 2018 Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20183012018-03-20020 March 2018 NRC Examination Report 05000275/2018301; 05000323/2018301 ML18064A3562018-02-27027 February 2018 DC 2018-01 Post Examination Analysis ML18064A3552018-02-0909 February 2018 DC 2018-01 Final Written Examination ML18064A3572018-02-0909 February 2018 DC-2018-01 Draft Written Examination ML18064A3542018-02-0909 February 2018 DC 2018-01 Final Outlines ML18081A9642018-02-0909 February 2018 DC 2018-01 Public Forms ML18064A3522018-02-0909 February 2018 DC 2018-01 Draft Written Examination Comments ML18064A3482018-02-0909 February 2018 DC 2018-01 Draft Operating Test Comments ML18064A3502018-02-0909 February 2018 DC 2018-01 Draft Outline Comments ML18064A3492018-02-0909 February 2018 DC 2018-01 Draft Operating Test ML18064A3532018-02-0909 February 2018 DC 2018-01 Final Operating Test ML18064A3512018-02-0909 February 2018 DC 2018-01 Draft Outlines ML18019A0162018-01-19019 January 2018 NRC Initial Operator Licensing Examination Approval 05000275/2018301; 05000323/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 DCL-17-042, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17103A2512017-04-13013 April 2017 Notification of NRC Initial Operator Licensing Examination 05000275/2018301; 05000323/2018301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16337A0232016-10-20020 October 2016 2016-10 Public Forms ML16336A5732016-10-20020 October 2016 Diablo-2016-10 Draft Written Examination ML16336A5722016-10-20020 October 2016 2016-10 Draft Outlines ML16336A5752016-10-20020 October 2016 2016-10 Final Outlines ML16336A5782016-10-20020 October 2016 2016-10 Written Exam Comments ML16336A5762016-10-20020 October 2016 2016-10 Operating Test Comments ML16336A5572016-10-20020 October 2016 2016-10 Draft Operating Test ML16321A2432016-10-20020 October 2016 2016-10 Final Written Exam 2024-08-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 ML24250A0182024-08-0202 August 2024 DC-2024-07 Public Forms DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis IR 05000275/20243012024-07-10010 July 2024 NRC Initial Operator Licensing Examination Approval 05000275/2024301; 05000323/2024301 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20213012023-08-0909 August 2023 Errata for Diablo Canyon Power Plant, Units 1 and 2 - NRC Examination Report 050002752021301 and 050003232021301 ML22342B2442022-12-13013 December 2022 DC-2023-07 Corporate Notification Letter DCL-21-017, DC-2021-01 Post Exam Comments Analysis2021-02-12012 February 2021 DC-2021-01 Post Exam Comments Analysis ML21075A2312021-02-12012 February 2021 DC-2021-01 Public Forms DCL-20-017, 2020-02-Post-Exam Comments2020-03-18018 March 2020 2020-02-Post-Exam Comments ML20106E2762020-03-0606 March 2020 2020-02-Public Forms ML20106E4662020-03-0606 March 2020 2020-02-DRAFT Outlines ML20106F1862020-03-0606 March 2020 2020-02-Form ES-403-1-Written Examination Grading.Pdf ML20106E4632020-03-0606 March 2020 2020-02-DRAFT Operating Test ML20106E4612020-03-0606 March 2020 2020-02-DRAFT Operating Test Comments ML20097A4462020-03-0606 March 2020 2020-02-FINAL Operating Test ML20106E4652020-03-0606 March 2020 2020-02-Draft Outline Comments ML20097A4502020-03-0606 March 2020 2020-02-FINAL Written Exam ML20106E4672020-03-0606 March 2020 2020-02-DRAFT Written Exam Comments ML20106E4682020-03-0606 March 2020 2020-02-DRAFT Written Exam ML20106E4702020-03-0606 March 2020 2020-02-FINAL Outlines DCL-19-027, Supplement to Request for Exemption from Operator Written Examination and Operating Test2019-04-0303 April 2019 Supplement to Request for Exemption from Operator Written Examination and Operating Test ML19007A1132019-01-0303 January 2019 NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301 DCL-18-039, Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-05-14014 May 2018 Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20183012018-03-20020 March 2018 NRC Examination Report 05000275/2018301; 05000323/2018301 ML18064A3562018-02-27027 February 2018 DC 2018-01 Post Examination Analysis ML18064A3482018-02-0909 February 2018 DC 2018-01 Draft Operating Test Comments ML18081A9642018-02-0909 February 2018 DC 2018-01 Public Forms ML18064A3572018-02-0909 February 2018 DC-2018-01 Draft Written Examination ML18064A3502018-02-0909 February 2018 DC 2018-01 Draft Outline Comments ML18064A3542018-02-0909 February 2018 DC 2018-01 Final Outlines ML18064A3552018-02-0909 February 2018 DC 2018-01 Final Written Examination ML18064A3532018-02-0909 February 2018 DC 2018-01 Final Operating Test ML18064A3522018-02-0909 February 2018 DC 2018-01 Draft Written Examination Comments ML18064A3492018-02-0909 February 2018 DC 2018-01 Draft Operating Test ML18064A3512018-02-0909 February 2018 DC 2018-01 Draft Outlines ML18019A0162018-01-19019 January 2018 NRC Initial Operator Licensing Examination Approval 05000275/2018301; 05000323/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 DCL-17-042, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17103A2512017-04-13013 April 2017 Notification of NRC Initial Operator Licensing Examination 05000275/2018301; 05000323/2018301 ML16321A2602016-10-20020 October 2016 2016-10 Final Operating Test ML16336A5572016-10-20020 October 2016 2016-10 Draft Operating Test ML16336A5752016-10-20020 October 2016 2016-10 Final Outlines ML16336A5732016-10-20020 October 2016 Diablo-2016-10 Draft Written Examination ML16336A5722016-10-20020 October 2016 2016-10 Draft Outlines ML16337A0232016-10-20020 October 2016 2016-10 Public Forms ML16336A5782016-10-20020 October 2016 2016-10 Written Exam Comments ML16336A5762016-10-20020 October 2016 2016-10 Operating Test Comments ML16321A3212016-10-20020 October 2016 2016-10 Post Examination Comments DCL-16-112, Diablo Canyon-2016-10 Post Examination Comments2016-10-20020 October 2016 Diablo Canyon-2016-10 Post Examination Comments 2024-08-02
[Table view] |
See also: IR 05000275/2011301
Text
PersonalInformationRedactedPersonalInformationRedacted
RedactedPersonalInformationRedacted
PersonalInformationRedactedPersonalInformationRedacted
TEST ITEM ANALYSIS WORKSHEET -
L091 NRC Analysis Results
1 - Poorly Written Question
2 - Excessive Dificulty
3 - Knowledge Weakness
4 - Open Ref Question
5 - Poor Test Taking Skills
6 - Poor Job Validity Question
7 - Outdated/Invalid Question
50% Re q uires Anal
y sis 1 C CCCCCCDCCCCCCCCCCCCCC
95%1 2 B BBBBBBBBBBBBBBBBBBBAB
95%2 3 A AAAAABAAAAAAAAAAABABA
86%3 4 BCBABBBBBBBBBABBBBBBBA
81%4 5 D DDDDDDDDDDDDDDDDDDDDD
100%5 6 BABCBBABDBAABBABBBABAB
57%6 7 BBDBBBBBBBBBBBBBBBBBBB
95%7 8 D DDDDDCDDDDDDDDDDDDDDC
90%8 9 CACCCBCCCDCCCACCACDCCC
71%9 10 A AAAAAAAAABAAABAAAAABA
86%10 11 D DDDDDDDDDDDDDDDDDDDDD
100%11 12 ABADAABAADDDAADAADCAAA
57%12 13 DDBDADDDADDBADDDDDDDDD
76%13 14 A AAAAAAAAAAAAAAAAAAAAA
100%14 15 A AAAAAAAAAAAAAAAAAAABA
95%15 16 DDDCDDDBDCBDCCCCCDCCDC
43%16 17 A AAAAAABAAAAAABAAABAAA
86%17 18 CCCCCCCCCCCCACCCCCCCCC
95%18 19 CCCCCCCCCCCCCCACACCCDC
86%19 20 B BBBABBBBBBBBBBBBBBBBB
95%20 21 D DDDDDDDDDDCDDDDDDDDDD
95%21 22 C CCCCCCCCCCCCCCCCCCCCC
100%22 23 CCCCCCCCCCDCCCCCCCCBBB
81%23 24 CDDDCDADDDDDDDDCDCDCDD
19%24 25 CCCCCCCCCCCCCCCCCCACCC
95%25 26 CCCCCCCCCCCCCCDCBCCCCC
90%26 27 A AAAAAAAAAAAAAAAAAAAAA
100%27 28 AAAACAAAAAACAAAAAAAAAA
90%28 29 C CCCCCCCCCCCCDCCCCCCCC
95%29 30 DDDDDDCDDDDDBDDDDDDDDD
90%30 31 D DDDDDDDDDDDDDDDDDDDDD
100%31 32 BABBBBBBBBBBBDBCBBCBAC
71%32 33 CCCCCCCCCCCCCCCCCCBCCC
95%33 34 C CCCCCCCCCCCCCCCCCCCCC
100%34 35 DDDDDDACDDDDDDDDDDDDDD
90%35 36 B BBBBBBBBBBBBBBBBBBBBB
100%36 37 BBBBBBBBBBABBBBBBBBBBC
90%37 38 B BBBBBBBBBBBBBBBBBBBBB
100%38 39 A AAAAAAAAAAAAAAAAAAAAA
100%39 40 A AAAAAAAAAAAAAAAAAAAAA
100%40 41 CACCDCACCCCCCCCCDCDCDD
67%41 42 CBCCCCABCCCACCCCCCDCCA
71%42 43 DDDDDDBDDDDDDDDDDDDDDD
95%43 44 BBBBBBBCBBCBBBBBCCBBBB
81%44 45 C CCCCCCCCCCCCCCCCCCCCC
100%45 46 B BBBBBABBBBBBBBBBBBBBB
95%46 47 CACACCDBCCDCCCACCCCCBC
67%47Jeremy Cobbs (SRO)Charles Bowler (SRO)Henry Clardy (SRO)Brian Sawyer (RO)Darrell Johnson (SRO)
Adrion Van Beurden (S
R% CORRECTQUESTIONBill LaLone (SRO)Frank Lee (SRO)Shane Guess (SRO)Aaron Cortes (RO)John Clipperton (RO)Jacob Brancheau (RO)Mike Brown (RO)Bryan Galvan (SRO)Jim Knight (RO)Mike Lee (RO)Heather Lewis (SRO)Adam Peck (SRO)Josh Meade (RO)Lisa Upshaw (SRO)QUESTION CORRECT ANSWERBernie Buzzelli (RO)
1of3
TEST ITEM ANALYSIS WORKSHEET -
L091 NRC 1 - Poorly Written Question
2 - Excessive Dificulty
3 - Knowledge Weakness
4 - Open Ref Question
5 - Poor Test Taking Skills
6 - Poor Job Validity Question
7 - Outdated/Invalid Question
50% Re q uires Anal
y sisJeremy Cobbs (SR
OCharles Bowler (SR
OHenry Clardy (SROBrian Sawyer (RO
)Darrell Johnson (SR
O Adrion Van Beurden % CORRECTQUESTIONBill LaLone (SRO)Frank Lee (SRO)Shane Guess (SR
OAaron Cortes (RO)John Clipperton (R
OJacob Brancheau (R
OMike Brown (RO)Bryan Galvan (SR
OJim Knight (RO)Mike Lee (RO)Heather Lewis (SR
OAdam Peck (SRO)Josh Meade (RO)Lisa Upshaw (SROQUESTION CORRECT ANSWERBernie Buzzelli (R
O 48 DDDDDDBDCDDDDDDDDDDDAA
81%48 49 DDDDDDDDBDBDDDDDDDDDDD
90%49 50 D DDDDDDDDDDDDDDDDDDDCD
95%50 51 B BBBBABBBBBBBBBBBBBBBB
95%51 52 D DCCCDDDCDDDDCDDDDCCDD
67%52 53 DDDDDDCCDDDBDDDBDDCDCB
67%53 54 C CCCCCCCCCCCCCCCCCCCCC
100%54 55 DDDDDDDDDDADDDDDDDDDDA
90%55 56 A AAAAAAAAAAAAAAAAAAAAA
100%56 57 DDDBBDBBBDBDDDDDADDDDD
67%57 58 BACBCCCCCBCCBBBBBBCABB
48%58 59 DDDDDBDDDDDDDDDDDDDDDD
95%59 60 BBAABBDBBBBBBBBBABBBBB
81%60 61 DDDDDDDDDDDDDDDDDDDDAD
95%61 62 A AAAAAAAAAAAAABAAABAAA
90%62 63 BDBBBBBBBBCBBBBBBBBBDD
81%63 64 A AAAAAAAAAAAAAAAAAAAAA
100%64 65 ADAAAAAAAABACADDCAACCD
57%65 66 CCCBCCCCCCCCCCCCCCCCCC
95%66 67 A AAAAAAAAAAAAAAAAAAAAA
100%67 68 CAAACAAACCACCAAAACACDC
38%68 69 AAACAAAAAAABAAAABAAAAA
86%69 70 AAABAAAADAAAAAAAAAAADD
81%70 71 AAAAAABAADAAAAAAAAAABA
86%71 72 BDBDBDDBDDBDBDDDBDDDDD
29%72 73 BBBBDDDBBBBDBBBBBBBBBB
81%73 74 BBBBBBBBDBBBBBBBDBBBBB
90%74 75 B BBBBBBBBBBBBABBABBBBB
90%7581.3%90.7%81.3%89.3%89.3%
72.0%84.0%85.3%92.0%
78.7%84.0%92.0%86.7%82.7%92.0%81.3%96.0%
76.0%92.0%72.0%78.7%
84.6%5 Class Average (RO Exam)
Number 50% Correct (1-75)
2of3
TEST ITEM ANALYSIS WORKSHEET -
L091 NRC 1 - Poorly Written Question
2 - Excessive Dificulty
3 - Knowledge Weakness
4 - Open Ref Question
5 - Poor Test Taking Skills
6 - Poor Job Validity Question
7 - Outdated/Invalid Question
50% Re q uires Anal
y sisJeremy Cobbs (SR
OCharles Bowler (SR
OHenry Clardy (SROBrian Sawyer (RO
)Darrell Johnson (SR
O Adrion Van Beurden % CORRECTQUESTIONBill LaLone (SRO)Frank Lee (SRO)Shane Guess (SR
OAaron Cortes (RO)John Clipperton (R
OJacob Brancheau (R
OMike Brown (RO)Bryan Galvan (SR
OJim Knight (RO)Mike Lee (RO)Heather Lewis (SR
OAdam Peck (SRO)Josh Meade (RO)Lisa Upshaw (SROQUESTION CORRECT ANSWERBernie Buzzelli (R
O 76 BCCBBBBBBBBBB
83%76 77 BBCBBBBBBABBC
75%77 78 A AAAAAAAAAAAA
100%78 79 D CDDDDDDDDDDD
92%79 80 C CCCCCCCCDCCC
92%80 81 B BBBBBBBBBBBB
100%81 82 D DDDDDDDDDDDD
100%82 83 DDBDDDDDDADDD
83%83 84 DADDADDDDDDAD
75%84 85 C CCCCCDCCCCCC
92%85 86 C CCCCCCCCCCCC
100%86 87 AAAAAAACAAAAA
92%87 88 AABBDDBDBAADD
25%88 89 B BBBBBBBBBBBB
100%89 90 ABABAABAABBCB
42%90 91 DDDDBDDDDADDD
83%91 92 CACCCCCCCCCCD
83%92 93 BBBBBBBBBBBCB
92%93 94 DDDDDDDCDDDAD
83%94 95 B BBBBBBBBBBBB
100%95 96 ADBACCACAAACA
50%96 97 AACABACBAACCC
42%97 98 ACAAAAAAAAAAA
92%98 99 B BBBBBBBBBBBB
100%99 100 B BBBBBBBBBBBB
100%10072.0%76.0%92.0%80.0%92.0%84.0%80.0%96.0%80.0%92.0%72.0%80.0%83.0%77.0%82.0%92.0%85.0%85.0%90.0%81.0%96.0%
77.0%92.0%72.0%79.0%
84.0%49Total Questions 50% Correct
Class Ave (RO and SRO Exams)
Number 50% Correct (76-100)
Class Average (SRO Exam)
3of3
All NRC Written exam questions were re
viewed by the Training staff with the candidates. The following questions were missed by more than 50% of
the candidates and remediated with the class. Any additional actions are documented at the end of the
question.
Notification 50416268 written to capture the test item analysis and subsequent corrective actions.
16.
Unit 1 is at full power in a normal electric plant alignment.
A sudden power reduction on the 500 kV grid causes a small frequency oscillation to occur.
Which of the following will occur in response to the oscillation?
A. The Voltage Regulator will switch to MAN
UAL and operator action will be needed
to adjust generator frequency to 60 Hz.
B. Frequency will oscillate until
the operator takes the Vo
ltage Regulator to MANUAL to maintain generator frequency at 60 Hz.
C. The DEHC Load Loop will vary turbine load to dampen the oscillation.
D. The Power System Stabilizer will vary generator terminal voltage to dampen the
oscillation.
Missed by 57% (12 of 21)
9 selected the correct answer, D
10 selected answer C
2 selected answer B
Additional action: none
24.
Which of the following describes the sequence for stopping the ECCS CCPs and SI pumps in E-1.1, SI Termination?
A. Stop One ECCS CCP, realign charging, restore letdown; then stop both SI pumps
B. Stop both SI pumps, realign charging, rest
ore letdown; then stop one ECCS CCP
C. Stop one ECCS CCP; realign char
ging; then stop both SI pumps
D. Stop both SI pumps and one ECCS CCP; then
realign charging and restore letdown
Missed by 81% (17 of 21)
4 selected the correct answer, C
16 selected answer D
1 selected answer A
Additional action: Challenged by the utility. Refer to documentation.
58.
Which of the following is the maximum design core temperature that can be indicated by an Incore Thermocouple?
A. 1250°F
B. 2300°F
C. 4700°F
D. 5000°F
Missed by 52% (11 of 21)
10 selected the correct answer, B
9 selected answer C
2 selected answer A
Additional action: none, however, to
be clear, question needs to
state that it is core exit temperature, not core temperature.
68.
GIVEN: * Unit 1 is at full power
- Boron concentration is 150 ppm
Rod H-8 is discovered to be untrippable.
Which of the following describes the eff
ect, if any, on Shutdown Margin (SDM)?
A. No effect because one rod is already assumed to be stuck when calculating SDM.
B. SDM is less by 665 pcm.
C. SDM is less by 1236 pcm.
D. SDM is less by 1330 pcm.
Missed by 62% (13 of 21)
8 selected the correct answer, C
12 selected answer A
1 selected answer D
Additional action: none
72.
Unit 1 is at full power.
Power is lost to CCW radiation moni
tor, RM-17A and PK11-22, Rad Mon Sys Failure/CVI Bypass, alarms.
What action, if any, must be taken by the crew to maintain adequate sample flow through
RM-17B?
A. Verify CCW heat exchange
r 1-1 is in service.
B. Verify CCW heat exchange
r 1-2 is in service.
C. Place a second CCW heat exchanger in service.
D. No action required, there is adequate fl
ow through RM-17B with either heat exchanger in service.
Missed by 71% (15 of 21)
6 selected the correct answer, B
15 selected answer C
Additional action: challenged by utility. Refer to documentation.
88.
GIVEN: * The crew has just completed draining th
e RCS to 107 feet 8 inches, in accordance with OP A-2:III, Reactor Vessel - Draining to Half Loop/Half Loop Operations with Fuel in Vessel
- RCS temperature is stable
As the operator matches chargi
ng and letdown, RHR pump am
ps begin to rapidly swing approximately 10 amps, peak to peak.
Which of the following actions will be taken by the Shift Foreman?
A. Direct the operator
to immediately secure the running RHR pump and go to OP AP
SD-2, Loss of RCS Inventory.
B. Direct the operator
to immediately secure the running RHR pump and go to OP AP SD-5, Loss of Residual Heat Removal.
C. Direct the operator to incr
ease charging flow and raise le
vel to greater than 108 feet, if vortexing continues, secure the running RHR pump and
go to OP AP SD-2, Loss of
RCS Inventory
D. Direct the operator to incr
ease charging flow and raise le
vel to greater than 108 feet, if vortexing continues, secure the running RHR pump and
go to OP AP SD-5, Loss of Residual Heat Removal.
Missed by 75% (9 of 12)
3 selected the correct answer, A
4 selected answer B
5 selected answer D
Additional action: as test item enhancement, add indication of lowering RCS level.
96.
Under what condition may LCO 3.0.5 be used to restore inoperable equipment to service and what is the reason the LCO is used?
A. Demonstrating the OPERABILITY of the equipment, because the applicable LCO Required Action is not being met while the equipment is in service and not OPERABLE.
B. Performing corrective maintenance or troub
leshooting, because the applicable LCO Required Action is not being met while the equipment is in service and not OPERABLE.
C. Demonstrating the OPERABILITY of the equipment, because without the exception, the Required Action is to enter LCO 3.0.3.
D. Performing corrective maintenance or
troubleshooting, because without the
exception, the Required Acti
on is to enter LCO 3.0.3.
Missed by 50% (6 of 12)
6 selected the correct answer, A
1 selected answer B
4 selected answer C
1 selected answer D
Additional action: none.
97.
GIVEN: * Unit 1 is at full power
- Control Room Ventilation Supply Fans
S-38 and S-40 are out of service
Control Room Ventilation Supply Fan S-36 trips.
Which of the following Required Actions, if any, must be taken?
A. No action required for either unit, LCO 3.7.10 is satisfied.
B. Unit 1 must enter LCO 3.7.10 Condition A. No Action required for Unit 2.
C. Both Unit 1 and Unit 2 must enter LCO 3.7.10 Condition A.
D. Both Unit 1 and Unit 2 must enter LCO 3.7.10 Condition B.
Missed by 58% (7 of 12)
5 selected the correct answer, A
2 selected answer B
5 selected answer C
Additional action: evaluate if position of
switches A-2 and D-2 should be added to
question setup.
L091 Exam Questions
07/08/2011
Time Name Number Question/Answer
1.
0820 Cortes 13
When it says "any other alarms" is that
at the inverter or PK's (control room)? Ans. PKs
2.
0855 Sawyer 32 Is RCS pressure lowering because the PORV is lowering (pressure) or is it
something else, such as AFW flow? Ans. Answer question based on the information given in the question.
3.
0855 Cortes 18 How close should I read the graph, interpolate, or round? Ans. Answer the
question using the graph as you would in the plant.
4.
0926 Lewis 31 "fails to close" does that mean the valve fails to close (as in the valve position) or fails to close as in its still open? Ans. The valve fails to close (open). 5.
0935 Peck 44 Lower setpoint, does that mean taki
ng the controller setpoint or the raise/lower pushbuttons? Ans. As
it says, lower the setpoint.
L091 Exam Questions
07/08/2011
Time Name Number Question/Answer
6.
0937 Galvan 29
PCV-135 initial response? Ans. Response to the plant conditions given.
7.
0952 Guess 46
Problem with the inverter or upstream of the inverter? Ans. Read the
question, again.
8.
1015 Meade 53
Do both units lose offsite power? Question doesn't make sense. Ans.
Assume only what question tells you.
9.
1052 Cortes 60
Does AIR-S-1 supply the Containm
ent Service Air header or the environment? Ans. Supplying air to Containment.
10.
1310 Peck 88
Is level stable at 107'8", can I assume it is still at that level? Ans. Answer the question based on the information given.
L091 Exam Questions
07/08/2011
Time Name Number Question/Answer
11.
1310 Bowler 89
What is the containment pressure trend when App E was performed? Ans.
Answer the question based on the
pressure given in the question.
12.
1310 LaLone 97
What about the other Control Room Vent equipment? Ans. Based your answer on the information
given in the question.
13.
1315 Upshaw 97
What about the CRVS transfer switches? Ans. System is in a normal
alignment for the conditions given.
14.
1316 Van Beurden
97
What about the CRVS transfer switches? Ans. System is in a normal
alignment for the conditions given.