Category:Letter type:DCL
MONTHYEARDCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL DCL-24-054, LCO 3.0.3 Completion Time Limits2024-05-17017 May 2024 LCO 3.0.3 Completion Time Limits DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability DCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-24-020, Nuclear Material Transaction Report for New Fuel2024-02-21021 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-014, Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage2024-02-12012 February 2024 Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage DCL-24-013, Nuclear Material Transaction Report for New Fuel2024-02-0707 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-2024-502, 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP)2024-01-25025 January 2024 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP) DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System DCL-23-092, Material Status Report for the Period Ending August 31, 20232023-09-28028 September 2023 Material Status Report for the Period Ending August 31, 2023 DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-23-083, Upcoming Meeting with Nuclear Security and Incident Response Staff2023-09-13013 September 2023 Upcoming Meeting with Nuclear Security and Incident Response Staff DCL-23-078, Nuclear Material Transaction Report for New Fuel2023-09-0606 September 2023 Nuclear Material Transaction Report for New Fuel 2024-09-09
[Table view] Category:License-Operator
MONTHYEARDCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20213012023-08-0909 August 2023 Errata for Diablo Canyon Power Plant, Units 1 and 2 - NRC Examination Report 050002752021301 and 050003232021301 ML22342B2442022-12-13013 December 2022 DC-2023-07 Corporate Notification Letter ML21075A2312021-02-12012 February 2021 DC-2021-01 Public Forms DCL-21-017, DC-2021-01 Post Exam Comments Analysis2021-02-12012 February 2021 DC-2021-01 Post Exam Comments Analysis DCL-20-017, 2020-02-Post-Exam Comments2020-03-18018 March 2020 2020-02-Post-Exam Comments ML20106E2762020-03-0606 March 2020 2020-02-Public Forms ML20106F1862020-03-0606 March 2020 2020-02-Form ES-403-1-Written Examination Grading.Pdf ML20106E4702020-03-0606 March 2020 2020-02-FINAL Outlines ML20097A4502020-03-0606 March 2020 2020-02-FINAL Written Exam ML20106E4612020-03-0606 March 2020 2020-02-DRAFT Operating Test Comments ML20097A4462020-03-0606 March 2020 2020-02-FINAL Operating Test ML20106E4632020-03-0606 March 2020 2020-02-DRAFT Operating Test ML20106E4682020-03-0606 March 2020 2020-02-DRAFT Written Exam ML20106E4652020-03-0606 March 2020 2020-02-Draft Outline Comments ML20106E4662020-03-0606 March 2020 2020-02-DRAFT Outlines ML20106E4672020-03-0606 March 2020 2020-02-DRAFT Written Exam Comments DCL-19-027, Supplement to Request for Exemption from Operator Written Examination and Operating Test2019-04-0303 April 2019 Supplement to Request for Exemption from Operator Written Examination and Operating Test ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML19007A1132019-01-0303 January 2019 NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301 DCL-18-039, Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-05-14014 May 2018 Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20183012018-03-20020 March 2018 NRC Examination Report 05000275/2018301; 05000323/2018301 ML18064A3562018-02-27027 February 2018 DC 2018-01 Post Examination Analysis ML18064A3572018-02-0909 February 2018 DC-2018-01 Draft Written Examination ML18064A3552018-02-0909 February 2018 DC 2018-01 Final Written Examination ML18064A3482018-02-0909 February 2018 DC 2018-01 Draft Operating Test Comments ML18064A3502018-02-0909 February 2018 DC 2018-01 Draft Outline Comments ML18064A3542018-02-0909 February 2018 DC 2018-01 Final Outlines ML18064A3492018-02-0909 February 2018 DC 2018-01 Draft Operating Test ML18064A3512018-02-0909 February 2018 DC 2018-01 Draft Outlines ML18081A9642018-02-0909 February 2018 DC 2018-01 Public Forms ML18064A3522018-02-0909 February 2018 DC 2018-01 Draft Written Examination Comments ML18064A3532018-02-0909 February 2018 DC 2018-01 Final Operating Test ML18019A0162018-01-19019 January 2018 NRC Initial Operator Licensing Examination Approval 05000275/2018301; 05000323/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 DCL-17-042, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17103A2512017-04-13013 April 2017 Notification of NRC Initial Operator Licensing Examination 05000275/2018301; 05000323/2018301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16321A2432016-10-20020 October 2016 2016-10 Final Written Exam ML16321A2602016-10-20020 October 2016 2016-10 Final Operating Test ML16321A3212016-10-20020 October 2016 2016-10 Post Examination Comments DCL-16-112, Diablo Canyon-2016-10 Post Examination Comments2016-10-20020 October 2016 Diablo Canyon-2016-10 Post Examination Comments ML16336A5752016-10-20020 October 2016 2016-10 Final Outlines ML16336A5722016-10-20020 October 2016 2016-10 Draft Outlines ML16336A5732016-10-20020 October 2016 Diablo-2016-10 Draft Written Examination ML16337A0232016-10-20020 October 2016 2016-10 Public Forms ML16336A5782016-10-20020 October 2016 2016-10 Written Exam Comments ML16336A5762016-10-20020 October 2016 2016-10 Operating Test Comments ML16336A5572016-10-20020 October 2016 2016-10 Draft Operating Test ML16336A5712016-10-14014 October 2016 2016-10 Draft Outline Comments 2024-04-17
[Table view] Category:Part 55 Examination Related Material
MONTHYEARDCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20213012023-08-0909 August 2023 Errata for Diablo Canyon Power Plant, Units 1 and 2 - NRC Examination Report 050002752021301 and 050003232021301 ML22342B2442022-12-13013 December 2022 DC-2023-07 Corporate Notification Letter ML21075A2312021-02-12012 February 2021 DC-2021-01 Public Forms DCL-21-017, DC-2021-01 Post Exam Comments Analysis2021-02-12012 February 2021 DC-2021-01 Post Exam Comments Analysis DCL-20-017, 2020-02-Post-Exam Comments2020-03-18018 March 2020 2020-02-Post-Exam Comments ML20097A4502020-03-0606 March 2020 2020-02-FINAL Written Exam ML20106E2762020-03-0606 March 2020 2020-02-Public Forms ML20106F1862020-03-0606 March 2020 2020-02-Form ES-403-1-Written Examination Grading.Pdf ML20106E4662020-03-0606 March 2020 2020-02-DRAFT Outlines ML20106E4702020-03-0606 March 2020 2020-02-FINAL Outlines ML20106E4682020-03-0606 March 2020 2020-02-DRAFT Written Exam ML20106E4632020-03-0606 March 2020 2020-02-DRAFT Operating Test ML20106E4672020-03-0606 March 2020 2020-02-DRAFT Written Exam Comments ML20106E4612020-03-0606 March 2020 2020-02-DRAFT Operating Test Comments ML20097A4462020-03-0606 March 2020 2020-02-FINAL Operating Test ML20106E4652020-03-0606 March 2020 2020-02-Draft Outline Comments DCL-19-027, Supplement to Request for Exemption from Operator Written Examination and Operating Test2019-04-0303 April 2019 Supplement to Request for Exemption from Operator Written Examination and Operating Test ML19007A1132019-01-0303 January 2019 NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301 DCL-18-039, Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-05-14014 May 2018 Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20183012018-03-20020 March 2018 NRC Examination Report 05000275/2018301; 05000323/2018301 ML18064A3562018-02-27027 February 2018 DC 2018-01 Post Examination Analysis ML18064A3482018-02-0909 February 2018 DC 2018-01 Draft Operating Test Comments ML18064A3502018-02-0909 February 2018 DC 2018-01 Draft Outline Comments ML18064A3542018-02-0909 February 2018 DC 2018-01 Final Outlines ML18064A3532018-02-0909 February 2018 DC 2018-01 Final Operating Test ML18064A3492018-02-0909 February 2018 DC 2018-01 Draft Operating Test ML18064A3552018-02-0909 February 2018 DC 2018-01 Final Written Examination ML18064A3512018-02-0909 February 2018 DC 2018-01 Draft Outlines ML18064A3522018-02-0909 February 2018 DC 2018-01 Draft Written Examination Comments ML18081A9642018-02-0909 February 2018 DC 2018-01 Public Forms ML18064A3572018-02-0909 February 2018 DC-2018-01 Draft Written Examination ML18019A0162018-01-19019 January 2018 NRC Initial Operator Licensing Examination Approval 05000275/2018301; 05000323/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 DCL-17-042, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17103A2512017-04-13013 April 2017 Notification of NRC Initial Operator Licensing Examination 05000275/2018301; 05000323/2018301 ML16337A0232016-10-20020 October 2016 2016-10 Public Forms ML16336A5572016-10-20020 October 2016 2016-10 Draft Operating Test ML16336A5752016-10-20020 October 2016 2016-10 Final Outlines ML16336A5732016-10-20020 October 2016 Diablo-2016-10 Draft Written Examination ML16336A5722016-10-20020 October 2016 2016-10 Draft Outlines ML16336A5782016-10-20020 October 2016 2016-10 Written Exam Comments ML16336A5762016-10-20020 October 2016 2016-10 Operating Test Comments ML16321A3212016-10-20020 October 2016 2016-10 Post Examination Comments DCL-16-112, Diablo Canyon-2016-10 Post Examination Comments2016-10-20020 October 2016 Diablo Canyon-2016-10 Post Examination Comments ML16321A2602016-10-20020 October 2016 2016-10 Final Operating Test ML16321A2432016-10-20020 October 2016 2016-10 Final Written Exam ML16336A5712016-10-14014 October 2016 2016-10 Draft Outline Comments ML16278A6092016-10-0404 October 2016 NRC Initial Operator Licensing Examination Approval 05000275/2016302; 05000323/2016302 ML16272A1472016-09-28028 September 2016 Generic Fundamentals Examination Results Sept 2016 2024-04-17
[Table view] |
Text
Personal Information Redacted Personal Information Redacted Redacted Personal Information Redacted
Personal Information Redacted Personal Information Redacted
TEST ITEM ANALYSIS WORKSHEET - L091 NRC Analysis Results 1 - Poorly Written Question 2 - Excessive Dificulty CORRECT 3 - Knowledge Weakness ANSWER 4 - Open Ref Question QUESTION % CORRECT QUESTION 5 - Poor Test Taking Skills 6 - Poor Job Validity Question Mike Brown (RO) Jim Knight (RO) Mike Lee (RO) Josh Meade (RO) Bill LaLone (SRO) Frank Lee (SRO)
Aaron Cortes (RO) Brian Sawyer (RO) Adam Peck (SRO) Lisa Upshaw (SRO) 7 - Outdated/Invalid Question Bernie Buzzelli (RO) Jacob Brancheau (RO) John Clipperton (RO) Charles Bowler (SRO) Henry Clardy (SRO) Jeremy Cobbs (SRO) Bryan Galvan (SRO) Shane Guess (SRO) Darrell Johnson (SRO) Heather Lewis (SRO) Adrion Van Beurden (SR 50% Requires Analysis 1 C C C C C C C D C C C C C C C C C C C C C C 95% 1 2 B B B B B B B B B B B B B B B B B B B B A B 95% 2 3 A A A A A A B A A A A A A A A A A A B A B A 86% 3 4 B C B A B B B B B B B B B A B B B B B B B A 81% 4 5 D D D D D D D D D D D D D D D D D D D D D D 100% 5 6 B A B C B B A B D B A A B B A B B B A B A B 57% 6 7 B B D B B B B B B B B B B B B B B B B B B B 95% 7 8 D D D D D D C D D D D D D D D D D D D D D C 90% 8 9 C A C C C B C C C D C C C A C C A C D C C C 71% 9 10 A A A A A A A A A A B A A A B A A A A A B A 86% 10 11 D D D D D D D D D D D D D D D D D D D D D D 100% 11 12 A B A D A A B A A D D D A A D A A D C A A A 57% 12 13 D D B D A D D D A D D B A D D D D D D D D D 76% 13 14 A A A A A A A A A A A A A A A A A A A A A A 100% 14 15 A A A A A A A A A A A A A A A A A A A A B A 95% 15 16 D D D C D D D B D C B D C C C C C D C C D C 43% 16 17 A A A A A A A B A A A A A A B A A A B A A A 86% 17 18 C C C C C C C C C C C C A C C C C C C C C C 95% 18 19 C C C C C C C C C C C C C C A C A C C C D C 86% 19 20 B B B B A B B B B B B B B B B B B B B B B B 95% 20 21 D D D D D D D D D D D C D D D D D D D D D D 95% 21 22 C C C C C C C C C C C C C C C C C C C C C C 100% 22 23 C C C C C C C C C C D C C C C C C C C B B B 81% 23 24 C D D D C D A D D D D D D D D C D C D C D D 19% 24 25 C C C C C C C C C C C C C C C C C C A C C C 95% 25 26 C C C C C C C C C C C C C C D C B C C C C C 90% 26 27 A A A A A A A A A A A A A A A A A A A A A A 100% 27 28 A A A A C A A A A A A C A A A A A A A A A A 90% 28 29 C C C C C C C C C C C C C D C C C C C C C C 95% 29 30 D D D D D D C D D D D D B D D D D D D D D D 90% 30 31 D D D D D D D D D D D D D D D D D D D D D D 100% 31 32 B A B B B B B B B B B B B D B C B B C B A C 71% 32 33 C C C C C C C C C C C C C C C C C C B C C C 95% 33 34 C C C C C C C C C C C C C C C C C C C C C C 100% 34 35 D D D D D D A C D D D D D D D D D D D D D D 90% 35 36 B B B B B B B B B B B B B B B B B B B B B B 100% 36 37 B B B B B B B B B B A B B B B B B B B B B C 90% 37 38 B B B B B B B B B B B B B B B B B B B B B B 100% 38 39 A A A A A A A A A A A A A A A A A A A A A A 100% 39 40 A A A A A A A A A A A A A A A A A A A A A A 100% 40 41 C A C C D C A C C C C C C C C C D C D C D D 67% 41 42 C B C C C C A B C C C A C C C C C C D C C A 71% 42 43 D D D D D D B D D D D D D D D D D D D D D D 95% 43 44 B B B B B B B C B B C B B B B B C C B B B B 81% 44 45 C C C C C C C C C C C C C C C C C C C C C C 100% 45 46 B B B B B B A B B B B B B B B B B B B B B B 95% 46 47 C A C A C C D B C C D C C C A C C C C C B C 67% 47 1of3
TEST ITEM ANALYSIS WORKSHEET - L091 NRC 1 - Poorly Written Question 2 - Excessive Dificulty CORRECT 3 - Knowledge Weakness ANSWER 4 - Open Ref Question QUESTION % CORRECT QUESTION 5 - Poor Test Taking Skills 6 - Poor Job Validity Question Mike Brown (RO) Jim Knight (RO) Mike Lee (RO) Josh Meade (RO) Bill LaLone (SRO) Frank Lee (SRO)
Aaron Cortes (RO) Brian Sawyer (RO) Adam Peck (SRO) Lisa Upshaw (SRO 7 - Outdated/Invalid Question Bernie Buzzelli (RO Jacob Brancheau (RO John Clipperton (RO Charles Bowler (SRO Henry Clardy (SRO Jeremy Cobbs (SRO Bryan Galvan (SRO Shane Guess (SRO Darrell Johnson (SRO Heather Lewis (SRO Adrion Van Beurden 50% Requires Analysis 48 D D D D D D B D C D D D D D D D D D D D A A 81% 48 49 D D D D D D D D B D B D D D D D D D D D D D 90% 49 50 D D D D D D D D D D D D D D D D D D D D C D 95% 50 51 B B B B B A B B B B B B B B B B B B B B B B 95% 51 52 D D C C C D D D C D D D D C D D D D C C D D 67% 52 53 D D D D D D C C D D D B D D D B D D C D C B 67% 53 54 C C C C C C C C C C C C C C C C C C C C C C 100% 54 55 D D D D D D D D D D A D D D D D D D D D D A 90% 55 56 A A A A A A A A A A A A A A A A A A A A A A 100% 56 57 D D D B B D B B B D B D D D D D A D D D D D 67% 57 58 B A C B C C C C C B C C B B B B B B C A B B 48% 58 59 D D D D D B D D D D D D D D D D D D D D D D 95% 59 60 B B A A B B D B B B B B B B B B A B B B B B 81% 60 61 D D D D D D D D D D D D D D D D D D D D A D 95% 61 62 A A A A A A A A A A A A A A B A A A B A A A 90% 62 63 B D B B B B B B B B C B B B B B B B B B D D 81% 63 64 A A A A A A A A A A A A A A A A A A A A A A 100% 64 65 A D A A A A A A A A B A C A D D C A A C C D 57% 65 66 C C C B C C C C C C C C C C C C C C C C C C 95% 66 67 A A A A A A A A A A A A A A A A A A A A A A 100% 67 68 C A A A C A A A C C A C C A A A A C A C D C 38% 68 69 A A A C A A A A A A A B A A A A B A A A A A 86% 69 70 A A A B A A A A D A A A A A A A A A A A D D 81% 70 71 A A A A A A B A A D A A A A A A A A A A B A 86% 71 72 B D B D B D D B D D B D B D D D B D D D D D 29% 72 73 B B B B D D D B B B B D B B B B B B B B B B 81% 73 74 B B B B B B B B D B B B B B B B D B B B B B 90% 74 75 B B B B B B B B B B B B B A B B A B B B B B 90% 75 81.3% 90.7% 81.3% 89.3% 89.3% 72.0% 84.0% 85.3% 92.0% 78.7% 84.0% 92.0% 86.7% 82.7% 92.0% 81.3% 96.0% 76.0% 92.0% 72.0% 78.7% 84.6% Class Average (RO Exam) 5 Number 50% Correct (1-75) 2of3
TEST ITEM ANALYSIS WORKSHEET - L091 NRC 1 - Poorly Written Question 2 - Excessive Dificulty CORRECT 3 - Knowledge Weakness ANSWER 4 - Open Ref Question QUESTION % CORRECT QUESTION 5 - Poor Test Taking Skills 6 - Poor Job Validity Question Mike Brown (RO) Jim Knight (RO) Mike Lee (RO) Josh Meade (RO) Bill LaLone (SRO) Frank Lee (SRO)
Aaron Cortes (RO) Brian Sawyer (RO) Adam Peck (SRO) Lisa Upshaw (SRO 7 - Outdated/Invalid Question Bernie Buzzelli (RO Jacob Brancheau (RO John Clipperton (RO Charles Bowler (SRO Henry Clardy (SRO Jeremy Cobbs (SRO Bryan Galvan (SRO Shane Guess (SRO Darrell Johnson (SRO Heather Lewis (SRO Adrion Van Beurden 50% Requires Analysis 76 B C C B B B B B B B B B B 83% 76 77 B B C B B B B B B A B B C 75% 77 78 A A A A A A A A A A A A A 100% 78 79 D C D D D D D D D D D D D 92% 79 80 C C C C C C C C C D C C C 92% 80 81 B B B B B B B B B B B B B 100% 81 82 D D D D D D D D D D D D D 100% 82 83 D D B D D D D D D A D D D 83% 83 84 D A D D A D D D D D D A D 75% 84 85 C C C C C C D C C C C C C 92% 85 86 C C C C C C C C C C C C C 100% 86 87 A A A A A A A C A A A A A 92% 87 88 A A B B D D B D B A A D D 25% 88 89 B B B B B B B B B B B B B 100% 89 90 A B A B A A B A A B B C B 42% 90 91 D D D D B D D D D A D D D 83% 91 92 C A C C C C C C C C C C D 83% 92 93 B B B B B B B B B B B C B 92% 93 94 D D D D D D D C D D D A D 83% 94 95 B B B B B B B B B B B B B 100% 95 96 A D B A C C A C A A A C A 50% 96 97 A A C A B A C B A A C C C 42% 97 98 A C A A A A A A A A A A A 92% 98 99 B B B B B B B B B B B B B 100% 99 100 B B B B B B B B B B B B B 100% 100 72.0% 76.0% 92.0% 80.0% 92.0% 84.0% 80.0% 96.0% 80.0% 92.0% 72.0% 80.0% 83.0% Class Average (SRO Exam) 77.0% 82.0% 92.0% 85.0% 85.0% 90.0% 81.0% 96.0% 77.0% 92.0% 72.0% 79.0% 84.0% Class Ave (RO and SRO Exams) 4 Number 50% Correct (76-100) 9 Total Questions 50% Correct 3of3
All NRC Written exam questions were reviewed by the Training staff with the candidates. The following questions were missed by more than 50% of the candidates and remediated with the class. Any additional actions are documented at the end of the question.
Notification 50416268 written to capture the test item analysis and subsequent corrective actions.
16.
Unit 1 is at full power in a normal electric plant alignment.
A sudden power reduction on the 500 kV grid causes a small frequency oscillation to occur.
Which of the following will occur in response to the oscillation?
A. The Voltage Regulator will switch to MANUAL and operator action will be needed to adjust generator frequency to 60 Hz.
B. Frequency will oscillate until the operator takes the Voltage Regulator to MANUAL to maintain generator frequency at 60 Hz.
C. The DEHC Load Loop will vary turbine load to dampen the oscillation.
D. The Power System Stabilizer will vary generator terminal voltage to dampen the oscillation.
Missed by 57% (12 of 21) 9 selected the correct answer, D 10 selected answer C 2 selected answer B Additional action: none
24.
Which of the following describes the sequence for stopping the ECCS CCPs and SI pumps in E-1.1, SI Termination?
A. Stop One ECCS CCP, realign charging, restore letdown; then stop both SI pumps B. Stop both SI pumps, realign charging, restore letdown; then stop one ECCS CCP C. Stop one ECCS CCP; realign charging; then stop both SI pumps D. Stop both SI pumps and one ECCS CCP; then realign charging and restore letdown Missed by 81% (17 of 21) 4 selected the correct answer, C 16 selected answer D 1 selected answer A Additional action: Challenged by the utility. Refer to documentation.
58.
Which of the following is the maximum design core temperature that can be indicated by an Incore Thermocouple?
A. 1250°F B. 2300°F C. 4700°F D. 5000°F Missed by 52% (11 of 21) 10 selected the correct answer, B 9 selected answer C 2 selected answer A Additional action: none, however, to be clear, question needs to state that it is core exit temperature, not core temperature.
68.
GIVEN:
- Boron concentration is 150 ppm Rod H-8 is discovered to be untrippable.
Which of the following describes the effect, if any, on Shutdown Margin (SDM)?
A. No effect because one rod is already assumed to be stuck when calculating SDM.
B. SDM is less by 665 pcm.
C. SDM is less by 1236 pcm.
D. SDM is less by 1330 pcm.
Missed by 62% (13 of 21) 8 selected the correct answer, C 12 selected answer A 1 selected answer D Additional action: none
72.
Unit 1 is at full power.
Power is lost to CCW radiation monitor, RM-17A and PK11-22, Rad Mon Sys Failure/CVI Bypass, alarms.
What action, if any, must be taken by the crew to maintain adequate sample flow through RM-17B?
A. Verify CCW heat exchanger 1-1 is in service.
B. Verify CCW heat exchanger 1-2 is in service.
C. Place a second CCW heat exchanger in service.
D. No action required, there is adequate flow through RM-17B with either heat exchanger in service.
Missed by 71% (15 of 21) 6 selected the correct answer, B 15 selected answer C Additional action: challenged by utility. Refer to documentation.
88.
GIVEN:
- The crew has just completed draining the RCS to 107 feet 8 inches, in accordance with OP A-2:III, Reactor Vessel - Draining to Half Loop/Half Loop Operations with Fuel in Vessel
- RCS temperature is stable As the operator matches charging and letdown, RHR pump amps begin to rapidly swing approximately 10 amps, peak to peak.
Which of the following actions will be taken by the Shift Foreman?
A. Direct the operator to immediately secure the running RHR pump and go to OP AP SD-2, Loss of RCS Inventory.
B. Direct the operator to immediately secure the running RHR pump and go to OP AP SD-5, Loss of Residual Heat Removal.
C. Direct the operator to increase charging flow and raise level to greater than 108 feet, if vortexing continues, secure the running RHR pump and go to OP AP SD-2, Loss of RCS Inventory D. Direct the operator to increase charging flow and raise level to greater than 108 feet, if vortexing continues, secure the running RHR pump and go to OP AP SD-5, Loss of Residual Heat Removal.
Missed by 75% (9 of 12) 3 selected the correct answer, A 4 selected answer B 5 selected answer D Additional action: as test item enhancement, add indication of lowering RCS level.
96.
Under what condition may LCO 3.0.5 be used to restore inoperable equipment to service and what is the reason the LCO is used?
A. Demonstrating the OPERABILITY of the equipment, because the applicable LCO Required Action is not being met while the equipment is in service and not OPERABLE.
B. Performing corrective maintenance or troubleshooting, because the applicable LCO Required Action is not being met while the equipment is in service and not OPERABLE.
C. Demonstrating the OPERABILITY of the equipment, because without the exception, the Required Action is to enter LCO 3.0.3.
D. Performing corrective maintenance or troubleshooting, because without the exception, the Required Action is to enter LCO 3.0.3.
Missed by 50% (6 of 12) 6 selected the correct answer, A 1 selected answer B 4 selected answer C 1 selected answer D Additional action: none.
97.
GIVEN:
- Control Room Ventilation Supply Fans S-38 and S-40 are out of service Control Room Ventilation Supply Fan S-36 trips.
Which of the following Required Actions, if any, must be taken?
A. No action required for either unit, LCO 3.7.10 is satisfied.
B. Unit 1 must enter LCO 3.7.10 Condition A. No Action required for Unit 2.
C. Both Unit 1 and Unit 2 must enter LCO 3.7.10 Condition A.
D. Both Unit 1 and Unit 2 must enter LCO 3.7.10 Condition B.
Missed by 58% (7 of 12) 5 selected the correct answer, A 2 selected answer B 5 selected answer C Additional action: evaluate if position of switches A-2 and D-2 should be added to question setup.
L091 Exam Questions 07/08/2011 Time Name Number Question/Answer 1.
0820 Cortes 13 When it says any other alarms is that at the inverter or PKs (control room)? Ans. PKs 2.
Is RCS pressure lowering because the PORV is lowering (pressure) or is it 0855 Sawyer 32 something else, such as AFW flow? Ans. Answer question based on the information given in the question.
3.
How close should I read the graph, interpolate, or round? Ans. Answer the 0855 Cortes 18 question using the graph as you would in the plant.
4.
fails to close does that mean the valve fails to close (as in the valve 0926 Lewis 31 position) or fails to close as in its still open? Ans. The valve fails to close (open).
5.
Lower setpoint, does that mean taking the controller setpoint or the 0935 Peck 44 raise/lower pushbuttons? Ans. As it says, lower the setpoint.
L091 Exam Questions 07/08/2011 Time Name Number Question/Answer 6.
0937 Galvan 29 PCV-135 initial response? Ans. Response to the plant conditions given.
7.
0952 Guess 46 Problem with the inverter or upstream of the inverter? Ans. Read the question, again.
8.
1015 Meade 53 Do both units lose offsite power? Question doesnt make sense. Ans.
Assume only what question tells you.
9.
1052 Cortes 60 Does AIR-S-1 supply the Containment Service Air header or the environment? Ans. Supplying air to Containment.
10.
1310 Peck 88 Is level stable at 1078, can I assume it is still at that level? Ans. Answer the question based on the information given.
L091 Exam Questions 07/08/2011 Time Name Number Question/Answer 11.
1310 Bowler 89 What is the containment pressure trend when App E was performed? Ans.
Answer the question based on the pressure given in the question.
12.
1310 LaLone 97 What about the other Control Room Vent equipment? Ans. Based your answer on the information given in the question.
13.
1315 Upshaw 97 What about the CRVS transfer switches? Ans. System is in a normal alignment for the conditions given.
14.
1316 Van Beurden 97 What about the CRVS transfer switches? Ans. System is in a normal alignment for the conditions given.