MONTHYEARIR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 IR 05000327/20240902024-03-19019 March 2024 NRC Inspection Report 05000327-2024090 and 05000328-2024090 and Preliminary Greater than Green Finding and Apparent Violation IR 05000327/20244012024-03-12012 March 2024 – Security Baseline Inspection Report 05000327/2024401 and 05000328/2024401 IR 05000259/20230062024-02-28028 February 2024 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1, 2 - Report 05000259/2023006, 05000260/2023006 and 05000296/2023006 IR 05000327/20230042024-02-12012 February 2024 Integrated Inspection Report 05000327/2023004 and 05000328/2023004 and Apparent Violation IR 05000327/20234422024-01-11011 January 2024 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter IR 05000327/20234202023-11-28028 November 2023 Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 IR 05000327/20230032023-11-0303 November 2023 Integrated Inspection Report 05000327/2023003 and 05000328/2023003 IR 05000327/20230112023-10-16016 October 2023 Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011 IR 05000327/20234032023-09-14014 September 2023 Cyber Security Inspection Report 05000327/2023403 and 05000328/2023403 (Cover Letter) IR 05000327/20230052023-08-29029 August 2023 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2023005 and 05000328/2023005 IR 05000327/20230022023-07-31031 July 2023 Integrated Inspection Report 05000327/2023002 and 05000328/2023002 IR 05000327/20230102023-07-20020 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000327/2023010 and 05000328/2023010 ML23163A0392023-06-13013 June 2023 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000327/2023011, 05000328/2023011) and Request for Information (RFI) IR 05000327/20233012023-05-15015 May 2023 NRC Operator License Examination Report 05000327/2023301 and 05000328/2023301 IR 05000327/20230012023-05-0202 May 2023 Integrated Inspection Report 05000327/2023001 and 05000328/2023001 and Exercise of Enforcement Discretion IR 05000327/20234412023-04-20020 April 2023 Final Significance Determination for a Security-Related Greater than Green Finding, Nov & Assessment Followup Letter, 05000327/2023441 & 05000328/2023441 IR 05000327/20234022023-04-13013 April 2023 Security Baseline Inspection Report 05000327/2023402 and 05000328/2023402 IR 05000327/20220062023-03-0101 March 2023 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 Report 05000327/2022006 and 05000328/2022006 IR 05000327/20234402023-02-13013 February 2023 NRC Inspection Report 05000327/2023440 and 05000328/2023440; Preliminary Greater than Green and Apparent Violation Cover Letter IR 05000327/20220042023-02-10010 February 2023 Integrated Inspection Report 05000327/2022004 and 05000328/2022004 IR 05000327/20234012023-02-0606 February 2023 Security Baseline Inspection Report 05000327/2023401 and 05000328/2023401 IR 05000327/20224402023-01-17017 January 2023 Special Inspection Report 05000327/2022440 and 05000328/2022440 and Apparent Violation - Cover IR 05000327/20220032022-11-0707 November 2022 Integrated Inspection Report 05000327/2022003 and 05000328/2022003 IR 05000327/20224012022-10-18018 October 2022 Material Control and Accounting Program Inspection Report 05000327/2022401 and 05000328/2022401 IR 05000327/20220052022-08-30030 August 2022 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327 2022005 and 05000328 2022005 - Final IR 05000327/20220022022-08-0101 August 2022 Integrated Inspection Report 05000327 2022002 and 05000328 2022002 IR 05000327/20223012022-07-21021 July 2022 Operator License Examination Report 05000327/2022301 and 05000328/2022301 IR 05000327/20220012022-05-11011 May 2022 Integrated Inspection Report 05000327/2022001, 05000328/2022001 and 07200034/2010002 IR 05000327/20220102022-04-25025 April 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000327/2022010 and 05000328/2022010 IR 05000327/20224022022-03-28028 March 2022 Security Baseline Inspection Report 05000327/2022402 and 05000328/2022402 IR 05000327/20210062022-03-0202 March 2022 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 - (Report No. 05000327/2021006 and 05000328/2021006) IR 05000327/20210042022-02-0707 February 2022 Integrated Inspection Report 05000327/2021004 and 05000328/2021004 IR 05000327/20210032021-11-10010 November 2021 Integrated Inspection Report 05000327/2021003 and 05000328/2021003 and Apparent Violation and Exercise of Enforcement Discretion IR 05000327/20210052021-08-18018 August 2021 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 Report 05000327/2021005 and 05000328/2021005 IR 05000327/20210022021-07-27027 July 2021 Integrated Inspection Report 05000327/2021002 and 05000328/2021002 IR 05000327/20210112021-07-19019 July 2021 Biennial Problem Identification and Resolution Inspection Report 05000327/2021011 and 05000328/2021011 IR 05000327/20210012021-04-27027 April 2021 Integrated Inspection Report 05000327/2021001 and 05000328/2021001 IR 05000327/20210102021-04-21021 April 2021 NRC Inspection Report 05000327/2021010 and 05000328/2021010 IR 05000327/20214012021-04-21021 April 2021 NRC Inspection Report 05000327/2021401 and 05000328/2021401 (U) IR 05000327/20200062021-03-0303 March 2021 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2020006 and 05000328/2020006 IR 05000327/20200042021-01-29029 January 2021 Integrated Inspection Report 05000327/2020004 and 05000328/2020004 ML20321A2102020-11-20020 November 2020 Security Inspection Report 05000327/2020420 and 05000328/2020420 - Cover Letter IR 05000327/20204202020-11-20020 November 2020 Security Inspection Report 05000327/2020420 and 05000328/2020420 IR 05000327/20200032020-11-10010 November 2020 Integrated Inspection Report 05000327/2020003, 05000328/2020003 and 07200034/2020002 IR 05000327/20200122020-10-20020 October 2020 Plants - Triennial Fire Protection Inspection Report 05000327/2020012 and 05000328/2020012 IR 05000327/20204012020-09-21021 September 2020 Cyber Security Inspection Report 05000327-2020401 and 05000328-2020401 2024-08-26
[Table view] Category:Letter
MONTHYEARML24298A1172024-10-24024 October 2024 Cycle 26, 180-Day Steam Generator Tube Inspection Report CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-17017 October 2024 Reactor Trip Due to a Turbine Trip ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 ML24100A0162024-04-11011 April 2024 Request for Regulatory Conference (Tennessee Valley Authority - Sequoyah Nuclear Plant) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements 2024-09-08
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 11, 2018
Mr. Joseph Vice President, Nuclear Regulatory Affairs and Support Services Licensing Tennessee Valley Authority 1101 Market Street, LP 4A Chattanooga, TN 37402-2801
SUBJECT: SEQUOYAH NUCLEAR PLANT, UNITS 1, AND 2 - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000327/2018410 AND 05000328/2018410
Dear Mr. Shea:
On March 8, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Sequoyah Nuclear Plant Units 1 and 2, and discussed the results of this inspection with Mr. B. Brigman and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
Sincerely,/RA/
Binoy Desai, Chief Plant Support Branch Division of Reactor Safety Docket Nos: 50-327 and 50-328 License Nos: DPR-77 and DPR-79
Enclosure:
NRC IR 05000327/2018410 and 05000328/2018410
w/Attachment:
Supplemental Information
cc: (See page 2) cc: Erin K. Henderson Senior Management, Fleet Regulatory Operations Tennessee Valley Authority 1101 Market Street, LP 5A-C
Chattanooga, TN 37402-2801
Mr. Matthew Rasmussen Plant Manager, Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, POB 2A-SQN Soddy Daisy, TN 37384-2000
Mr. Michael W. McBrearty Director, Plant Support (interim) Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, OPS 4A-SQN Soddy Daisy, TN 37384-2000
Mr. Jonathan T. Johnson Manager, Site Licensing (interim)
Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, OPS 4A-SQN Soddy Daisy, TN 37384-2000
Mr. F. E. Marcussen Director, Nuclear Security Tennessee Valley Authority 1101 Market Street, LP 1A Chattanooga, TN 37402-2801
Mr. Brian E. Brigman
Senior Manager Site Security Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, MPB 1A-SQN Soddy Daisy, TN 37384-2000
ML 18101A132 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB RII:DRS/PSB RII:DRP/BR6 RII:DRS/PSB SIGNATURE JDG4 BBD FJE for ADM2 BBD NAME D. Golden B. Desai A. Masters B. Desai DATE 04/ 4 /2018 04/ 4 /2018 04/ 4 /2018 04/ 4 /2018 E-MAIL COPY YES NO YES NO YES NO YES NO Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION II Docket Numbers: 50-327 and 50-328
License Numbers: DPR-77 and DPR-79
Report Numbers: 05000327/2018410 and 328/2018410
Enterprise Identifier: I-2018-410-0009
Licensee: Tennessee Valley Authority (TVA)
Facility: Sequoyah Nuclear Plant, Units 1 and 2
Location: Soddy-Daisy, TN
Dates: March 5 - 8, 2018
Inspectors: David Golden, Physical Security Inspector
Approved by: Binoy Desai, Chief Plant Support Branch Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensee's performance by conducting a Baseline Security Inspection at Sequoyah Nuclear Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below.
List of Findings and Violations No findings were identified.
Additional Tracking Items None INSPECTION SCOPES Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, "Security Inspection Program for Commercial Nuclear Power Reactors." The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REPORT DETAILS
SAFEGUARDS 71130.02 - Access Control (1 Sample)
The inspectors evaluated the security access control program. The following elements were evaluated from this IP dated January 1, 2017.
Tier I: all 19 requirements. Tier II: 7 Requirements 02.05 (a-d); 02.07 (b, d, e). Tier III: 1 Requirement 02.08.
OTHER ACTIVITIES
- BASELINE 71151 - Performance Indicator Verification (1 Sample)
The inspectors verified licensee performance indicators submittals listed below for the period from March 1, 2017, through March 1, 2018. The following elements were evaluated from this IP dated January 1, 2017.
(1) Protected Area Security Equipment Performance Index EXIT MEETINGS AND DEBRIEFS On March 8, 2018, the inspector presented the Baseline Security Inspection results to Mr. B.
Brigman and other members of the licensee staff.
LIST OF
DOCUMENTS REVIEWED
PROCEDURES
NSDP-8, Keys and Locks, Revision 08 SQN-SSI-7.7, Vehicle Access Control, Revision 41
SQN-SSI-7.6, Personnel Access Control, Revision 40
NSDP-29, Tracking and Trending and NRC Performance Indicators, Revision 09
NSDP-1, Safeguards Event Reporting Guidelines, Revision 14
CONDITION REPORTS 1380176 1307700 1369564 1274682 1383679 1272816 1339102 1270840
1307655 1369567