IR 05000327/2024401

From kanterella
Jump to navigation Jump to search
– Security Baseline Inspection Report 05000327/2024401 and 05000328/2024401
ML24072A011
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/12/2024
From: Jannette Worosilo
NRC/RGN-II/DRS/PSB1
To: Jim Barstow
Tennessee Valley Authority
References
IR 2024401
Download: ML24072A011 (8)


Text

SUBJECT:

SEQUOYAH, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000327/2024401 AND 05000328/2024401

Dear James Barstow:

On March 7, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Sequoyah, Units 1 and 2 and discussed the results of this inspection with Thomas F. Marshall and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000327 and 05000328 License Nos. DPR-77 and DPR-79

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000327 and 05000328

License Numbers:

DPR-77 and DPR-79

Report Numbers:

05000327/2024401 and 05000328/2024401

Enterprise Identifier:

I-2024-401-0046

Licensee:

Tennessee Valley Authority

Facility:

Sequoyah, Units 1 and 2

Location:

Soddy Daisy, TN

Inspection Dates:

March 4 to March 7, 2024

Inspectors:

R. Womack, Senior Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Sequoyah, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type Issue Number Title Report Section Status LER 05000327,05000328/20 23-S002-00 LER 2023-S-02-00,

Sequoyah Nuclear Plant,

Units 1 and 2 - Temporary Suspension of Security Measures Due to Tornado Warning 71153 Closed

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1) Tier I: All Requirements Tier II: 02.06 a., d.; 02.08 a., d.-f., h., i.

Tier III: 02.09

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2) since the last performance of this IP.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) Unit 1: February 1, 2023, through February 29, 2024 Unit 2: February 1, 2023, through February 29, 2024 71153 - Follow Up of Events and Notices of Enforcement Discretion The inspectors evaluated the following licensee event report (LER)

Follow Up of Events and Notices of Enforcement Discretion===

(1) LER 50-327 and 328/2023-S02-00, "Temporary Suspension of Security Measures Due to Tornado Warning," ADAMS accession: ML23143A341 The inspectors determined that the cause of the condition described in the LER was not reasonably within the licensees ability to foreseen and corrected and therefore was not reasonably preventable. No performance deficiency nor violation of NRC requirements was identified

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On March 7, 2024, the inspectors presented the security baseline inspection results to Thomas F. Marshall and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1891339

11/13/2023

1893558

11/29/2023

Corrective Action

Documents

1914482

03/06/2024

1914606

03/06/2024

1914619

03/04/2024

1914886

03/06/2024

1914892

03/06/2024

Corrective Action

Documents

Resulting from

Inspection

1915190

03/06/2024

23-01-021

Safeguards Event Report

03/16/2023

23-02-032

Safeguards Event Report

04/05/2023

23-02-038

Safeguards Event Report

05/22/2023

23-04-070

Safeguards Event Report

11/13/2023

24-01-012

Safeguards Event Report

01/31/2024

TVA 42015

Vehicle Search Review/Audit

January

24

Miscellaneous

TVA 42015

Vehicle Search Review/Audit

February

24

NPG-SPP-22.201

Oversight of the Human Performance Program

Revision 14

NSDP-4

Security Organization, Expectations and Standards

Revision 27

NSDP-7.1

Security Shift Supervision

Revision 4

NSDP-7.6

Personnel Access Control

Revision 6

NSDP-7.6

Personnel Access Control

Revision 5

NSDP-7.7

Vehicle Access Control

Revision 7

Procedures

NSDP-8

Keys and Locks

Revision 9

71130.02

Self-Assessments

L17 231120 800

Audit Report SSA2308: Physical Security, Contingency Plan,

and Safeguards Information - Sequoyah Nuclear Plant (SQN)

11/27/2023

Miscellaneous

PP01 - Protected

Area Security

Equipment

PI Summary Report

February

23 through

February

24

71151

Procedures

NSDP-29

Tracking and Trending and NRC Performance Indicators

Revision 11

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Self-Assessments

1903776

IP 71151 Performance Indicator Verification, IP 71130.02

Access Control, IP 71130.09 Security Plan Changes NRC

Pre-Inspection Self-Assessment

2/14/2024

23-02-030

Safeguards Event Report

04/01/2023

NSDP-7.5-3

TVA 41945, Severe Weather Warning Checklist

04/01/2023

Miscellaneous

OPDP-1

SQN Unit 1 Operations Log - Day Shift

04/01/2023

AOP-N.02

Tornado Watch / Warning

Revision 46

71153

Procedures

NSDP-7.5

Special Situations Affecting Security

Revision 4