MONTHYEARIR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter IR 05000327/20234422024-01-11011 January 2024 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter IR 05000327/20234202023-11-28028 November 2023 Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 IR 05000327/20230032023-11-0303 November 2023 Integrated Inspection Report 05000327/2023003 and 05000328/2023003 IR 05000327/20230112023-10-16016 October 2023 Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011 IR 05000327/20234032023-09-14014 September 2023 Cyber Security Inspection Report 05000327/2023403 and 05000328/2023403 (Cover Letter) IR 05000327/20230052023-08-29029 August 2023 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2023005 and 05000328/2023005 IR 05000327/20230022023-07-31031 July 2023 Integrated Inspection Report 05000327/2023002 and 05000328/2023002 IR 05000327/20230102023-07-20020 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000327/2023010 and 05000328/2023010 ML23163A0392023-06-13013 June 2023 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000327/2023011, 05000328/2023011) and Request for Information (RFI) IR 05000327/20233012023-05-15015 May 2023 NRC Operator License Examination Report 05000327/2023301 and 05000328/2023301 IR 05000327/20230012023-05-0202 May 2023 Integrated Inspection Report 05000327/2023001 and 05000328/2023001 and Exercise of Enforcement Discretion IR 05000327/20234412023-04-20020 April 2023 Final Significance Determination for a Security-Related Greater than Green Finding, Nov & Assessment Followup Letter, 05000327/2023441 & 05000328/2023441 IR 05000327/20234022023-04-13013 April 2023 Security Baseline Inspection Report 05000327/2023402 and 05000328/2023402 IR 05000327/20220062023-03-0101 March 2023 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 Report 05000327/2022006 and 05000328/2022006 IR 05000327/20234402023-02-13013 February 2023 NRC Inspection Report 05000327/2023440 and 05000328/2023440; Preliminary Greater than Green and Apparent Violation Cover Letter IR 05000327/20220042023-02-10010 February 2023 Integrated Inspection Report 05000327/2022004 and 05000328/2022004 IR 05000327/20234012023-02-0606 February 2023 Security Baseline Inspection Report 05000327/2023401 and 05000328/2023401 IR 05000327/20224402023-01-17017 January 2023 Special Inspection Report 05000327/2022440 and 05000328/2022440 and Apparent Violation - Cover IR 05000327/20220032022-11-0707 November 2022 Integrated Inspection Report 05000327/2022003 and 05000328/2022003 IR 05000327/20224012022-10-18018 October 2022 Material Control and Accounting Program Inspection Report 05000327/2022401 and 05000328/2022401 IR 05000327/20220052022-08-30030 August 2022 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327 2022005 and 05000328 2022005 - Final IR 05000327/20220022022-08-0101 August 2022 Integrated Inspection Report 05000327 2022002 and 05000328 2022002 IR 05000327/20223012022-07-21021 July 2022 Operator License Examination Report 05000327/2022301 and 05000328/2022301 IR 05000327/20220012022-05-11011 May 2022 Integrated Inspection Report 05000327/2022001, 05000328/2022001 and 07200034/2010002 IR 05000327/20220102022-04-25025 April 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000327/2022010 and 05000328/2022010 IR 05000327/20224022022-03-28028 March 2022 Security Baseline Inspection Report 05000327/2022402 and 05000328/2022402 IR 05000327/20210062022-03-0202 March 2022 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 - (Report No. 05000327/2021006 and 05000328/2021006) IR 05000327/20210042022-02-0707 February 2022 Integrated Inspection Report 05000327/2021004 and 05000328/2021004 IR 05000327/20210032021-11-10010 November 2021 Integrated Inspection Report 05000327/2021003 and 05000328/2021003 and Apparent Violation and Exercise of Enforcement Discretion IR 05000327/20210052021-08-18018 August 2021 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 Report 05000327/2021005 and 05000328/2021005 IR 05000327/20210022021-07-27027 July 2021 Integrated Inspection Report 05000327/2021002 and 05000328/2021002 IR 05000327/20210112021-07-19019 July 2021 Biennial Problem Identification and Resolution Inspection Report 05000327/2021011 and 05000328/2021011 IR 05000327/20210012021-04-27027 April 2021 Integrated Inspection Report 05000327/2021001 and 05000328/2021001 IR 05000327/20210102021-04-21021 April 2021 NRC Inspection Report 05000327/2021010 and 05000328/2021010 IR 05000327/20214012021-04-21021 April 2021 NRC Inspection Report 05000327/2021401 and 05000328/2021401 (U) IR 05000327/20200062021-03-0303 March 2021 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2020006 and 05000328/2020006 IR 05000327/20200042021-01-29029 January 2021 Integrated Inspection Report 05000327/2020004 and 05000328/2020004 ML20321A2102020-11-20020 November 2020 Security Inspection Report 05000327/2020420 and 05000328/2020420 - Cover Letter IR 05000327/20204202020-11-20020 November 2020 Security Inspection Report 05000327/2020420 and 05000328/2020420 IR 05000327/20200032020-11-10010 November 2020 Integrated Inspection Report 05000327/2020003, 05000328/2020003 and 07200034/2020002 IR 05000327/20200122020-10-20020 October 2020 Plants - Triennial Fire Protection Inspection Report 05000327/2020012 and 05000328/2020012 IR 05000327/20204012020-09-21021 September 2020 Cyber Security Inspection Report 05000327-2020401 and 05000328-2020401 IR 05000327/20204022020-09-18018 September 2020 Regulatory Commission Security Baseline Inspection Report 05000327/2020402 and 05000328/2020402 IR 05000237/20203012020-08-27027 August 2020 NRC Initial License Examination Report 05000237/2020301; 05000249/2020301 IR 05000327/20200052020-08-18018 August 2020 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2020005 and 05000328/2020005 IR 05000327/20200022020-07-23023 July 2020 Integrated Inspection Report 05000327/2020002 and 05000328/2020002 IR 05000327/20200012020-05-0505 May 2020 Integrated Inspection Report 05000327/2020001 and 05000328/2020001 IR 05000327/20203012020-04-24024 April 2020 NRC Operator License Examination Report 05000327/2020301 and 05000328/2020301 2024-07-31
[Table view] Category:Letter
MONTHYEARIR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 ML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24018A0142024-01-17017 January 2024 Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913 ML24011A3202024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), December 2023 IR 05000327/20234422024-01-11011 January 2024 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter ML24011A3162024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), August 2023 ML24011A3192024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), November 2023 ML24011A3172024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), September 2023 ML24011A3182024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), October 2023 ML24010A2132024-01-10010 January 2024 CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers ML24018A0952024-01-0404 January 2024 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0 ML24004A0332024-01-0303 January 2024 Interim Report of a Deviation or Failure to Comply Crompton Instruments Type 077 Ammeter ML24004A0402024-01-0303 January 2024 Response to NRCs November 8, 2023, Request for Additional Information - Related to Independent Spent Fuel Storage Installation CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) ML23346A1222023-12-12012 December 2023 Annual Non-Radiological Environmental Operating Report - 2023 IR 05000327/20234202023-11-28028 November 2023 Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23324A4362023-11-0909 November 2023 Exam Corporate Notification Letter Aka 210-day Letter ML23307A0822023-11-0808 November 2023 Request for Additional Information August 4, 2022, Exemption Request for Deviating from the Conditions of Certificate of Compliance No. 1032, Amendment No. 3, Related to Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation IR 05000327/20230032023-11-0303 November 2023 Integrated Inspection Report 05000327/2023003 and 05000328/2023003 ML23306A1592023-11-0202 November 2023 Enforcement Action EA-22-129 Inspection Readiness Notification ML23292A0792023-10-19019 October 2023 Tennessee Valley Authority - Emergency Plan Implementing Procedure Revision, Includes EPIP-5, Revision 58, General Emergency IR 05000327/20230112023-10-16016 October 2023 Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011 ML23285A0882023-10-12012 October 2023 Submittal of Sequoyah Nuclear Plant, Units 1 and 2, Submittal of Updated Final Safety Analysis Report Amendment 31 ML23284A4252023-10-11011 October 2023 10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report; Commitment Summary Report; and Update to the Fire Protection Report ML23283A2792023-10-10010 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Requirements Manual 2024-07-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION ril 11, 2018
SUBJECT:
SEQUOYAH NUCLEAR PLANT, UNITS 1, AND 2 - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000327/2018410 AND 05000328/2018410
Dear Mr. Shea:
On March 8, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Sequoyah Nuclear Plant Units 1 and 2, and discussed the results of this inspection with Mr. B. Brigman and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Binoy Desai, Chief Plant Support Branch Division of Reactor Safety Docket Nos: 50-327 and 50-328 License Nos: DPR-77 and DPR-79
Enclosure:
NRC IR 05000327/2018410 and 05000328/2018410 w/Attachment: Supplemental Information
REGION II==
Docket Numbers: 50-327 and 50-328 License Numbers: DPR-77 and DPR-79 Report Numbers: 05000327/2018410 and 328/2018410 Enterprise Identifier: I-2018-410-0009 Licensee: Tennessee Valley Authority (TVA)
Facility: Sequoyah Nuclear Plant, Units 1 and 2 Location: Soddy-Daisy, TN Dates: March 5 - 8, 2018 Inspectors: David Golden, Physical Security Inspector Approved by: Binoy Desai, Chief Plant Support Branch Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at Sequoyah Nuclear Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below.
List of Findings and Violations No findings were identified.
Additional Tracking Items None
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REPORT DETAILS
SAFEGUARDS
71130.02 - Access Control
Main article: IP 71130.02
The inspectors evaluated the security access control program. The following elements were evaluated from this IP dated January 1, 2017.
Tier I: all 19 requirements.
Tier II: 7 Requirements 02.05 (a-d); 02.07 (b, d, e).
Tier III: 1 Requirement
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below for the period from March 1, 2017, through March 1, 2018. The following elements were evaluated from this IP dated January 1, 2017.
- (1) Protected Area Security Equipment Performance Index
EXIT MEETINGS AND DEBRIEFS
On March 8, 2018, the inspector presented the Baseline Security Inspection results to Mr. B.
Brigman and other members of the licensee staff.
LIST OF
DOCUMENTS REVIEWED
PROCEDURES
NSDP-8, Keys and Locks, Revision 08
SQN-SSI-7.7, Vehicle Access Control, Revision 41
SQN-SSI-7.6, Personnel Access Control, Revision 40
NSDP-29, Tracking and Trending and NRC Performance Indicators, Revision 09
NSDP-1, Safeguards Event Reporting Guidelines, Revision 14
CONDITION REPORTS
1380176 1307700
1369564 1274682
1383679 1272816
1339102 1270840
1307655 1369567
Attachment