ML15258A024
From kanterella
Revision as of 17:28, 27 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Letter Sequence Request | |
---|---|
CAC:MF6548, (Open) | |
MONTHYEARML15258A0242015-09-11011 September 2015
[Table View]Supplement to 10 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval Project stage: Request ML16032A0312016-02-0404 February 2016 Request for Use of Alternative REL-PP1 Associated with Pump Inservice Testing (CAC Nos. MF6548 and MF6549) Project stage: Other 2015-09-11 |
ML15258A024 | |
Person / Time | |
---|---|
Site: | Cook ![]() |
Issue date: | 09/11/2015 |
From: | Gebbie J P Indiana Michigan Power Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
AEP-NRC-201 5-91 | |
Download: ML15258A024 (3) | |
Similar Documents at Cook | |
---|---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARAEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023
[Table view]Form OAR-1, Owner'S Activity Report AEP-NRC-2022-50, Form OAR-1, Owner'S Activity Report2022-08-25025 August 2022 Form OAR-1, Owner'S Activity Report AEP-NRC-2022-42, Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-07-18018 July 2022 Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements AEP-NRC-2021-35, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-052021-05-0404 May 2021 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-05 AEP-NRC-2021-01, Form OAR-1, Owner'S Activity Report2021-01-14014 January 2021 Form OAR-1, Owner'S Activity Report AEP-NRC-2020-51, CFR 50.55a Request Associated with the Fifth Ten-Year Inservice Testing Interval2020-10-0505 October 2020 CFR 50.55a Request Associated with the Fifth Ten-Year Inservice Testing Interval AEP-NRC-2020-08, Form OAR-1, Owner'S Activity Report2020-01-29029 January 2020 Form OAR-1, Owner'S Activity Report AEP-NRC-2019-35, Form OAR-1, Owner'S Activity Report2019-08-0101 August 2019 Form OAR-1, Owner'S Activity Report AEP-NRC-2018-47, Submittal of Form OAR-1, Owner'S Activity Report2018-07-31031 July 2018 Submittal of Form OAR-1, Owner'S Activity Report AEP-NRC-2018-19, Submittal of 2017 Steam Generator Tube Inspection Report2018-05-22022 May 2018 Submittal of 2017 Steam Generator Tube Inspection Report AEP-NRC-2018-14, Form OAR-1, Owner'S Activity Report2018-03-23023 March 2018 Form OAR-1, Owner'S Activity Report AEP-NRC-2017-13, Transmittal of 2016 Steam Generator Tube Inspection Report2017-05-24024 May 2017 Transmittal of 2016 Steam Generator Tube Inspection Report AEP-NRC-2016-35, Fifth 10-Year Interval Pump and Valve Inservice Testing Program2016-06-30030 June 2016 Fifth 10-Year Interval Pump and Valve Inservice Testing Program ML15258A0242015-09-11011 September 2015 Supplement to 10 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval AEP-NRC-2015-65, Form OAR-1, Owner'S Activity Report2015-07-21021 July 2015 Form OAR-1, Owner'S Activity Report AEP-NRC-2015-01, Steam Generator Tube Inspection Report2015-04-13013 April 2015 Steam Generator Tube Inspection Report AEP-NRC-2015-06, Form OAR-1, Owner'S Activity Report2015-01-21021 January 2015 Form OAR-1, Owner'S Activity Report AEP-NRC-2014-13, Form OAR-1 Owner'S Activity Report2014-02-0707 February 2014 Form OAR-1 Owner'S Activity Report AEP-NRC-2013-54, Submittal of Form OAR-1, Owner'S Activity Report2013-08-14014 August 2013 Submittal of Form OAR-1, Owner'S Activity Report AEP-NRC-2012-63, 2012 Steam Generator Tube Inspection Report2012-10-0202 October 2012 2012 Steam Generator Tube Inspection Report ML12053A2622012-01-20020 January 2012 Form OAR-1 Owner'S Activity Report ML1106704232011-02-28028 February 2011 Form OAR-1 Owner'S Activity Report AEP-NRC-2010-56, Submittal of Owner'S Activity Report for Inservice Inspection Activities2010-07-0101 July 2010 Submittal of Owner'S Activity Report for Inservice Inspection Activities AEP-NRC-2010-19, Fourth Ten-Year Interval Inservice Testing Program Relief Request REL-0042010-02-0505 February 2010 Fourth Ten-Year Interval Inservice Testing Program Relief Request REL-004 ML1007506762009-10-23023 October 2009 Enclosure to AEP-NRC-2010-21, Donald C. Cook, Units 1 & 2 - ISI Program Plan Fourth Ten-Year Inspection Interval AEP-NRC-2009-51, Inservice Inspection Summary Report, Cycle 18, 2009 Refueling Outage2009-07-29029 July 2009 Inservice Inspection Summary Report, Cycle 18, 2009 Refueling Outage ML0904304002009-01-14014 January 2009 Request to Extend Inservice Inspection Interval for the Reactor Vessel Weld Examination and Request for License Amendment for Submittal of ISI Information and Analyses - Response to Request for Additional Information AEP-NRC-2008-41, Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination and Request for License - Amendment for Submittal of ISI Information and Analyses2008-10-0909 October 2008 Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination and Request for License - Amendment for Submittal of ISI Information and Analyses ML0822702052008-08-0505 August 2008 Relief Requests for Inservice Pressure Testing AEP-NRC-2008-12, Inservice Inspection Summary Report for Period of 11/14/2006 Through 04/29/20082008-07-24024 July 2008 Inservice Inspection Summary Report for Period of 11/14/2006 Through 04/29/2008 ML0804605022008-02-0404 February 2008 Inservice Inspection Summary Report for the Period of May 5, 2006 to November 6, 2007 ML0705206452007-02-0909 February 2007 Inservice Inspection Summary Report ML0631304122006-10-31031 October 2006 Steam Generator Tube Inservice Inspection Report ML0622804742006-08-0404 August 2006 Inservice Inspection Summary Report ML0600601102005-12-28028 December 2005 Fourth 10-Year Interval Pump and Valve Inservice Testing Program ML0521404632005-07-21021 July 2005 Inservice Inspection Summary Report ML0511601762005-04-15015 April 2005 Proposed Alternative to the ASME Code, Section XI, Repair Requirements ML0503903572005-01-31031 January 2005 Inservice Inspection Summary Report ML0430904912004-10-28028 October 2004 Steam Generator Tube Inservice Inspection Report ML0405600602004-02-19019 February 2004 Inservice Inspection Summary Report ML0326706222003-09-18018 September 2003 Inservice Inspection Summary Report ML0225301462002-09-0606 September 2002 NIS-1 Report for Inservice Inspection (ISI) Activities for Cycle 18 Refueling Outage (April 22, 2002 to June 9, 2002) ML0216804782002-06-13013 June 2002 Addendum to 1998 NIS-1 Report for Inservice Inspection Activities ML0215603962002-06-0303 June 2002 Steam Generator Tube Inservice Inspection Report ML0213700502002-05-15015 May 2002 NIS-1 Report for Inservice Inspection (ISI) Activities 2023-01-31 Category:Letter MONTHYEARIR 05000315/20230042024-01-31031 January 2024
[Table view]Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08 |
Retrieved from "https://kanterella.com/w/index.php?title=ML15258A024&oldid=390275"