IR 05000315/2023010

From kanterella
Jump to navigation Jump to search
Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010
ML23030B899
Person / Time
Site: Cook  
(DPR-058, DPR-074)
Issue date: 01/31/2023
From: Nestor Feliz-Adorno
NRC/RGN-III/DORS/ERPB
To: Lies Q
Indiana Michigan Power Co
References
IR 2023010
Download: ML23030B899 (1)


Text

SUBJECT:

DONALD C. COOK NUCLEAR PLANT - PHASE 4 POST-APPROVAL LICENSE RENEWAL INSPECTION REPORT 05000315/2023010 AND 05000316/2023010

Dear Q. Shane Lies:

On January 13, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Donald C. Cook Nuclear Plant. On January 17, 2023, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Néstor J. Féliz Adorno, Chief Engineering & Reactor Projects Branch Division of Operating Reactor Safety Docket Nos. 05000315 and 05000316 License Nos. DPR-58 and DPR-74

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000315 and 05000316

License Numbers:

DPR-58 and DPR-74

Report Numbers:

05000315/2023010 and 05000316/2023010

Enterprise Identifier:

I-2023-010-0021

Licensee:

Indiana Michigan Power Company Nuclear Generation Group

Facility:

Donald C. Cook Nuclear Plant

Location:

Bridgman, MI

Inspection Dates:

January 09, 2023 to January 13, 2023

Inspectors:

A. Dahbur, Senior Reactor Inspector

M. Domke, Reactor Inspector

E. Magnuson, Reactor Inspector

Approved By:

Néstor J. Féliz Adorno, Chief

Engineering & Reactor Projects Branch

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Phase 4 Post-Approval License Renewal Inspection at Donald C.

Cook Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

===71003 - Post-Approval Site Inspection for License Renewal The NRC conducted this Phase 4 Post -Approval Site Inspection for License Renewal in accordance with the License Renewal Inspection Program (LRIP). Per Inspection Manual Chapter 2516, the LRIP is the process used by NRC staff to verify the adequacy of Aging Management Programs (AMPs), Time Limited Aging Analyses (TLAAs), and other activities associated with an applicants request to renew an operating license of a commercial nuclear power plant beyond the initial licensing period under Title 10 of the Code of Federal Regulations (CFR), Part 54, Requirements for the Renewal of Operating Licenses for Nuclear Power Plants. This inspection evaluated the licensee implementation of aging management activities by reviewing the AMPs listed below.

Post-Approval Site Inspection for License Renewal===

(1)15.1.6, Buried Piping Inspection Program (2)15.1.11, Environmental Qualification of Electric Components Program (3)15.1.14, Fire Water System Program (4)15.1.22, Instrument Air Quality Program (5)15.1.23, Non-EQ Inaccessible Medium-Voltage Cable Program (6)15.1.24, Non-EQ Instrumentation Circuits Test Review Program (7)15.1.42, Wall Thinning Monitoring Program

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On January 17, 2023, the inspectors presented the Phase 4 Post-Approval License Renewal Inspection results to Q. Shane Lies, Senior VP and Chief Nuclear Officer and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

DIT-B-03569-O1

The Minimum Required Pipe Wall Thickness Value Based on

Axial Loading for Select Unit-1 NESW Piping Segments

Shown in Table-1

10/07/2014

Calculations

DIT-B-03570-O1

Minimum Required Pipe Wall Thickness Value Based on

Axial Loading for Select Unit 2 NESW Piping Segments

Shown in Table-1

01/26/2015

AR 2011-10619

2-TK-39-DN Dew Point Greater than 34 Degrees F

09/19/2011

AR 2011-8350

2-TK-39-DN Dew Point Not Meeting Acceptance Criteria

07/20/2011

AR 2013-13007

U1 North Control Air Receiver Dewpoint Is High out of Spec

09/04/2013

AR 2013-5789

1-NRI-32 Shorted Outer Shield near Detector Well

04/20/2013

AR 2014-3138

U2 North Dry Air Receiver High Dewpoint

03/05/2014

AR 2015-12751

PHB Tank and Tank Vent Line Coating Damaged/Disbonded

09/30/2015

AR 2015-13346

Degraded Coating on AFW Discharge Piping Detailed

Description

10/14/2015

AR 2015-13632

2-DR-265 Excavation Backfilled with Open Inspection Preds

10/20/2015

AR 2015-5381

2-XRV-11 Not Open to Regenerate Control Air Drying Tower

04/15/2015

AR 2015-8078

U2 North Dry Air Receiver Dew Point High

06/16/2015

AR 2016-1134

Buried Lake Township Water Line Coating/Pipe Degradation

01/28/2016

AR 2016-2730

1-OME-122W, CAD Timer Not Advancing-Dewpoint 41 Deg

F

03/30/2016

AR 2016-2907

Plant Air Quality to Digital Positioners

03/14/2016

AR 2016-8766

Coating Degradation on Buried Transformer Drain Piping

07/29/2016

AR 2017-2160

U2 North Control Air Dewpoint High out-of-Spec

2/22/2017

AR 2017-2511

2-TK-39-DN Dew Point Not Meeting Acceptance Criteria

07/05/2017

AR 2017-6969

High Dew Point on 2-TK-39-DS (CA South Dry Air Receiver)

07/20/2017

AR 2017-9689

Minor Surface Corrosion/Paint Degraded on 8 Condensate

Pipe

09/29/2017

AR 2018-10056

Control Air Dewpoint of 2-TK-39-DN above Acceptance

Criteria

10/31/2018

AR 2018-10698

Unit 2 Control Air Dryer Failure, 2-OME-122W

11/28/2018

71003

Corrective Action

Documents

AR 2018-11453

inch Well Water Break

2/22/2018

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AR 2018-2296

2-NRI-31 CHAR Test Indicates a Short at The Detector

03/03/2018

AR 2018-8658

High out of Spec. Control Air dewpoint in 2-TK-39-DN

09/05/2018

AR 2019-11684

CD Fuel Oil Storage Tank Recommended Future Repairs

10/21/2019

AR 2020-6941

U2 Manual Reactor Trip and Auto Safety Injection

09/09/2020

AR 2020-8047

Filters Do Not Literally Meet Implied LRA Requirements

10/09/2020

AR 2020-8661

Update The SPV List and FMEA's for Charging & Spray

Valves

10/15/2020

AR 2020-8677

Sample U2 Containment Control Air Quality

10/15/2020

AR 2021-10328

U2 PAC Oil Sample Port Misting Oil

2/21/2021

AR 2021-1470

Water Leak at Access Road Just North of East Sewage Bldg

2/15/2021

AR 2021-1660

Received Ann. 204, Drop 33 CNTMT Control Air Header

Press Lo

2/24/2021

AR 2021-6956

Control Air Dew Point > Acceptance Criteria at 2-TK-39-DN

08/11/2021

AR 2021-8469

Evaluate Degraded Lead Paint Coating on Pipe

10/12/2021

AR 2022-0089

Unit 2 PAC Oil Mist Eliminator Not Working

01/04/2022

AR 2022-1386

U2 PAC Oil Misting Following Compressor Replacement

2/17/2022

AR 2022-3335

Surface Rust on Piping

04/19/2022

GT 2015-1005

Air Operated Valve Program Self Assessment

03/14/2016

GT 2020-10439

NRC Information Notice 2020-04

2/23/2020

AR 2022-9895

Condition Adverse to Regulatory Compliance

2/06/2022

AR 2023-0242

Oxidation on Air Dryer Piping

01/10/2023

AR 2023-0243

Gasket Misaligned on 2-SI-14

01/10/2023

AR 2023-0245

Conduit Contact above Control Air Dryer

01/10/2023

AR 2023-0247

Corrosion on 2-HE-24 Inlet Line

01/10/2023

AR 2023-0273

Correct Documentation and Edison DB for Non-Existent

Manhole

01/11/2023

Corrective Action

Documents

Resulting from

Inspection

AR 2023-0299

Incorrect Use of Westinghouse Document to Justify

Condition

01/11/2023

Engineering

Changes

57371

Removal of Bellows, Protective Cover, and Weld Build Up for

Containment Penetration 1-CPN-26

Engineering

Evaluations

11.68

Closed Head Sprinkler Sampling/Testing/Replacement

Program Plan Basis Document and Proposed Closed Spray

Head Sampling Plan

06/30/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

11.72

Fire Water System Piping Internal Inspection Program

11.77

D. C. Cook Nuclear Plant (CNP) Replacement Plan for The

Unit 1 and Unit 2 Fire Protection Ring Header and MIC

Mitigation Program

COO-96475

Special Test of Selective Leaching Evaluation

(4 components)

06/08/2017

D.C-66895

Selective Leaching Analysis of Underground Fire Protection

Valve

06/14/2022

EQER 2011-005

EQ Evaluation of Class 1E Equipment for License Renewal

installed at DC Cook Nuclear Plant, Units 1 and 2

2/27/2011

2-EHP-5022-

001-001

FAC Inspection and Mitigation Program

2-EHP-5030-

CAR-001

Characterization Testing Program

2-EHP-5070-

UPTI-001

Underground Piping and Tank Integrity Program

EHI-5054

Wall Thinning Monitoring Program

EHI-5070-UPTI

Underground Piping and Tank Integrity Program

FPE-5070-FP

Fire Protection Aging Management Program

IHP-6040-064-

001

Control Air Performance Monitoring

Procedures

PMI-2270

Fire Protection Program

55433968

Non-EQ Instrumentation Circuits Test

01/20/2014

5551213501

NNPF, Replace I-CPN-26 Assembly Piping

04/28/2022

C10005974001

Inspect Manholes without Special Requirements

06/22/2022

WO-55459734

2016 EDG Carbon and Copper Excavation

09/16/2016

WO-55515707

Tank 47 (AB) Underground Diesel Tank Internal Inspection

and UTT Examination October 2019

2/16/2019

Work Orders

WO-55516301

Tank 47 (CD) Underground Diesel Tank Internal Inspection

and UTT Examination October 2019

2/16/2019