ML22340A139

From kanterella
Jump to navigation Jump to search
Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports
ML22340A139
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/30/2022
From: Scarpello M
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML22340A137 List: ... further results
References
AEP-NRC-2022-62
Download: ML22340A139 (1)


Text

INDIANA MICHIGAN POWIR.

Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390 An ADI Company BOUNDLESS ENERG Y-November 30, 2022 Docket Nos.:

50-315 50-316 U. S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 indianamichiganpower.com AEP-NRC-2022-62 10 CFR 50.71(e) 10 CFR 50.59(d)(2) 10 CFR 50.54(a)(3) 10 CFR 54.37(b) 10 CFR 50.71(e) UPDATE AND RELATED SITE CHANGE REPORTS

References:

1. Nuclear Energy Institute 98-03, "Guidelines for Updating Final Safety Analysis Reports," Revision 1, dated June 1999.
2. Letter from J. B. Hickman, U. S. Nuclear Regulatory Commission (NRC), to E. E. Fitzpatrick, Indiana Michigan Power Company (l&M), "Donald C. Cook Nuclear Plant, Units 1 and 2 -

Exemption to 10 CFR 50.71(e)(4)

(TAC Nos. M99494 and M99495)," dated March 3, 1998.

3. Letter from Q.

Shane Lies, l&M, to NRC Document Control Desk, "Donald C. Cook Nuclear Plant Units 1 and 2, 10 CFR 50.71(e) Update and Related Site Change Reports," AEP-NRC-2021-19, dated April 19, 2021.

Indiana Michigan Power Company (l&M), the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, hereby submits the CNP Updated Final Safety Analysis Report (UFSAR) update as required by 10 CFR 50.71(e), utilizing the guidance published in Reference 1. The reporting period for this update is from October 18, 2020, through May 30, 2022. Reference 2 requires l&M to submit updates to the CNP UFSAR once every Unit 1 fuel cycle, within six months of the end of the refueling outage, not to exceed 24 months from the last submittal. The most recent Unit 1 refueling outage ended May 30, 2022. The last update submittal was provided on April 19, 2021, by Reference 3.

Notice: When separated from Security Related Information (i.e., Enclosure 3), this document is decontrolled, provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

s

~

~\\")

R-.

0\\L Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390

Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390 U. S. Nuclear Regulatory Commission AEP-NRC-2022-62 Page 2 In addition to the UFSAR, the following reports are provided:

CNP Report of Changes, Tests, and Experiments as required by 10 CFR 50.59(d)(2);

CNP Commitment Change Summary Report as recommended by Nuclear Energy Institute 99-04, "Guidelines for Managing Nuclear Regulatory Commission Commitment Changes;"

Changes to the CNP Unit 1 and Unit 2 Technical Specification (TS) Bases reflected in updated copies of the TS Bases consistent with CNP Unit 1 and Unit 2 TS 5.5.12.d; Changes to the CNP Unit 1 and Unit 2 Technical Requirements Manuals (TRMs) reflected in updated copies of the TRMs; and Changes and updates to the CNP Fire Protection Program reflected in updated copies of the applicable documents; No changes were made to the CNP Quality Assurance Program Description during the reporting period.

l&M is providing all information on Optical Storage Media (OSM) following guidance from Revision 9 of "Guidance for Electronic Submissions to the NRC," to the extent practical. In some areas of the UFSAR, image resolution is less than the desired 300 pixels per inch. This is primarily seen in older graphics and the l&M logo. Text search capability and page image printing is not affected. provides a summary of the information contained on each disk. Enclosure 2 provides the directory structure and file listing for each disk.

Enclosures 3 and 5 have been reviewed in accordance with the guidance provided in Regulatory Issue Summary 2015-17, "Review and Submission of Updates to Final Safety Analysis Reports, Emergency Preparedness Documents, and Fire Protection Documents," and Enclosure 3 has been determined to contain information to be withheld from public disclosure in accordance with 10 CFR 2.390. Therefore, a redacted copy has been provided as Enclosure 4. This letter contains no new or modified regulatory commitments. Should you have any questions, please contact me at (269) 466-2649.

Notice: When separated from Security Related Information (i.e., Enclosure 3), this document is decontrolled, provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390

Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390 U. S. Nuclear Regulatory Commission AEP-NRC-2022-62 Page 3 Pursuant to 10 CFR 50. 71 ( e )(2), I certify that the information provided accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirements and changes made under the provisions of 10 CFR 50.59.

~~

Michael K. Scarpello Regulatory Affairs Director BMC/sjh : Electronic File Submittal Summary :

Directory Structure and File Listing for Optical Storage Media :

Optical Storage Media (OSM) #1 :

Optical Storage Media (OSM) #2 :

Optical Storage Media (OSM) #3 c:

R. J Ancona - MPSC, w/o enclosures INPO-OSM #1 EGLE - RMD/RPS, w/o enclosures J.B. Giessner-NRC Region Ill M. G. Menze-AEP Ft. Wayne, w/o enclosures NRC Resident Inspector R. M. Sistevaris -AEP Ft. Wayne, w/o enclosures S. P. Wall - NRC Washington, DC A. J. Williamson - AEP Ft. Wayne, w/o enclosures Notice: When separated from Security Related Information (i.e., Enclosure 3), this document is decontrolled, provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390

Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390 to AEP-NRC-2022-62 Page 1 of 1 Electronic File Submittal Summary Optical Storage Media (OSM) #1 (Enclosure 3) - Donald C. Cook Nuclear Plant (CNP)

Updated Final Safety Analysis Report (UFSAR), Revision 31. OSM #1 contains Revision 31 of the CNP UFSAR in its entirety. A non-proprietary file reader (Adobe Acrobat Reader) is required to view the document.

OSM #2 (Enclosure 4) contains a Redacted Revision 31 of the CNP UFSAR in its entirety.

A non-proprietary file reader (Adobe Acrobat Reader) is required to view the document.

OSM #3 (Enclosure 5) contains the following documents:

CNP Report of Changes, Tests, and Experiments Pursuant to 10 CFR 50.59( d)(2)

CNP Commitment Change Summary CNP Unit 1 Technical Specification (TS) Bases - Revision 88 CNP Unit 2 TS Bases - Revision 84 CNP Unit 1 Technical Requirement Manual (TRM) - Revision 90 CNP Unit 2 TRM - Revision 90 CNP National Fire Protection Association 805 Fire Protection Program Manual -

Revision 5 CNP Nuclear Safety Capability Assessment - Revision 13 CNP Fire Safety Analysis - Revision 5 Notice: When separated from Security Related Information (i.e., Enclosure 3), this document is decontrolled, provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390

Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390 to AEP-NRC-2022-62 Page 1 of 7 Directory Structure and File Listing for Optical Storage Media Optical Storage Media (OSM) #1 (Enclosure 3)

OSM #1 contains Revision 29 of the Donald C. Cook Nuclear Plant (CNP) Updated Final Safety Analysis Report (UFSAR) in its entirety.

Directory\\UFSAR FIie Name Approximate FIie Size Kilobyte (KB)

UFSAR\\

<DIR>

001-CHAPTER00 U12 LOEP.pdf 1859 002-CHAPTER01 U12 01 TEXT.pdf 2326 003-CHAPTER01 U12 02 TABLES.pdf 1003 004-CHAPTER01 U12 03 FIGURES.pdf 29471 005-CHAPTER02 U12 01 TEXT.pdf 1350 006-CHAPTER02 U12 02 TABLES.pdf 1866 007-CHAPTER02 U12 03 FIGURES.pdf 20910 008-CHAPTER03 U1 01 TEXT.pdf 2134 009-CHAPTER03 U1 02 TABLES.pdf 1617 010-CHAPTER03 U1 03 FIGURES.pdf 4936 011-CHAPTER03 U2 01 TEXT.pdf 3143 012-CHAPTER03 U2 02 TABLES.pdf 1451 013-CHAPTER03 U2 03 FIGURES.pdf 6540 014-CHAPTER04 U12 01 TEXT.pdf 1887 015-CHAPTER04 U12 02 TABLES.pdf 1259 016-CHAPTER04 U12 03 FIGURES.pdf 8231 017-CHAPTER05 U12 01 TEXT.pdf 1961 018-CHAPTER05 U12 02 TABLES.pdf 1799 019-CHAPTER05 U12 03 FIGURES.pdf 10568 020-CHAPTER06 U12 01 TEXT.pdf 1428 021-CHAPTER06 U12 02 TABLES.pdf 951 022-CHAPTER06 U12 03 FIGURES.pdf 3950 023-CHAPTER07 U12 01 TEXT.pdf 1950 024-CHAPTER07 U12 02 TABLES.pdf 1698 025-CHAPTER07 U12 03 FIGURES.pdf 2504 026-CHAPTER08 U12 01 TEXT.pdf 1215 027-CHAPTER08 U12 02 TABLES.pdf 691 028-CHAPTER08 U12 03 FIGURES.pdf 5058 029-CHAPTER09 U12 01 TEXT.pdf 2432 Notice: When separated from Security Related Information (i.e., Enclosure 3), this document is decontrolled, provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390

Security Related Information With hold From Public Disclosure Under 10 CFR 2.390 to AEP-NRC-2022-62 Page 2 of 7 Directorv\\UFSAR File Name Approximate File Size Kilobvte (KB) 030-CHAPTER09 U12 02 TABLES.pdf 2002 031-CHAPTER09 U12 03 FIGURES.pdf 23703 032-CHAPTER10 U12 01 TEXT.odf 1108 033-CHAPTER10 U12 02 TABLES.odf 706 034-CHAPTER10 U12 03 FIGURES.pdf 9277 035-CHAPTER11 U12 01 TEXT.odf 1394 036-CHAPTER11 U12 02 TABLES.pdf 1522 037-CHAPTER11 U12 03 FIGURES.odf 4467 038-CHAPTER12 U12 01 TEXT.pdf 943 039-CHAPTER13 U12 01 TEXT.odf 915 040-CHAPTER13 U12 02 TABLES.pdf 771 041-CHAPTER14.00 U1 01 TEXT.odf 857 042-CHAPTER14.01 U1 01 TEXT.pdf 1986 043-CHAPTER14.01 U1 02 TABLES.pdf 1059 044-CHAPTER14.01 U1 03 FIGURES.pdf 77182 045-CHAPTER14.02 U1 01 TEXT.odf 1521 046-CHAPTER14.02 U1 02 TABLES.odf 934 047-CHAPTER14.02 U1 03 FIGURES.pdf 3840 048-CHAPTER14.03 U1 01 TEXT.odf 3411 049-CHAPTER14.03 U1 02 TABLES.pdf 3360 050-CHAPTER14.03 U1 03 FIGURES Part 1 of 2.odf 25551 051-CHAPTER14.03 U1 03 FIGURES Part 2 of 2.pdf 32101 052-CHAPTER14.04 U1 01 TEXT.odf 712 053-CHAPTER14.A-G U1 01 TEXT.odf 1024 054-CHAPTER14.A-G U1 03 FIGURES.pdf 651 055-CHAPTER14.00 U2 01 TEXT.pdf 832 056-CHAPTER14.00 U2 02 TABLES.odf 687 057-CHAPTER14.01 U2 01 TEXT.pdf 1677 058-CHAPTER14.01 U2 02 TABLES.pdf 1076 059-CHAPTER14.01 U2 03 FIGURES.pdf 8461 060-CHAPTER14.02 U2 01 TEXT.odf 1261 061-CHAPTER14.02 U2 02 TABLES.pdf 799 062-CHAPTER14.02 U2 03 FIGURES.odf 2658 063-CHAPTER14.03.01-03 U2 01 TEXT.odf 1385 064-CHAPTER14.03.01-03 U2 02 TABLES.pdf 1614 065-CHAPTER14.03.01-03 U2 03 FIGURES.pdf 5337 Notice: When separated from Security Related Information (I.e., Enclosure 3), this document is decontrolled, provided the transmittal document does not otherwise warrant protection from unauthorized disclosure. Security Related Information j

Withhold From Public Disclosure Under 10 CFR 2.390

Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390 to AEP-NRC-2022-62 Page 3 of 7 Dlrectory\\UFSAR FIie Name Approximate FIie Size Kilobyte (KB) 066-CHAPTER14.03.04 U2 01 TEXT.pdf 1874 067-CHAPTER14.03.04 U2 02 TABLES.pdf 4898 068-CHAPTER14.03.04 U2 03 FIGURES.pdf 20206 069-CHAPTER14.03.05-09 U2 01 TEXT.pdf 832 070-CHAPTER14.03.05-09 U2 02 TABLES.pdf 699 071-CHAPTER14.03.05-09 U2 03 FIGURES.pdf 600 072-CHAPTER14.04 U1 02 TABLES.pdf 1305 073-CHAPTER14.04 U2 01 TEXT.pdf 4733 074-CHAPTER14.04 U2 02 TABLES.pdf 4059 075-CHAPTER14.04 U2 03 FIGURES.pdf 846 076-CHAPTER14.A U2 01 TEXT.pdf 685 077-CHAPTER15.00 U2 01 TEXT.odf 1239 Notice: When separated from Security Related Information (i.e., Enclosure 3), this document is decontrolled, provided the transmittal document does not otherwise warrant

,, protection from unauthorized disclosure.

Security Related Information

~ Withhold From Public Disclosure Under 10 CFR 2.390

J Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390 to AEP-NRC-2022-62 Page 4 of 7 OSM #2 (Enclosure 4) contains a redacted copy of Revision 29 of the CNP UFSAR in its entirety.

Directory\\UFSAR-R FIie Name Approximate File Size (KB)

UFSAR-R\\

<DIR>

078-CHAPTER00 U12 LOEP 1859 079-CHAPTER01 U12 01 TEXT.pdf 2326 080-CHAPTER01 U12 02 TABLES.pdf 1003 081-CHAPTER01 U12 03 FIGURES-R.pdf 1663 082-CHAPTER02 U12 01 TEXT.pdf 1350 083-CHAPTER02 U12 02 TABLES.odf 1866 084-CHAPTER02 U12 03 FIGURES.pdf 20910 085-CHAPTER03 U1 01 TEXT.pdf 2134 086-CHAPTER03 U1 02 TABLES.pdf 1617 087-CHAPTER03 U1 03 FIGURES.pdf 4936 088-CHAPTER03 U2 01 TEXT.pdf 3143 089-CHAPTER03 U2 02 TABLES.pdf 1451 090-CHAPTER03 U2 03 FIGURES.pdf 6540 091-CHAPTER04 U12 01 TEXT.pdf 1887 092-CHAPTER04 U12 02 TABLES.pdf 1259 093-CHAPTER04 U12 03 FIGURES.pdf 8231 094-CHAPTER05 U12 01 TEXT.pdf 1961 095-CHAPTER05 U12 02 TABLES.pdf 1799 096-CHAPTER05 U12 03 FIGURES-R.pdf 8815 097-CHAPTER06 U12 01 TEXT.pdf 1428 098-CHAPTER06 U12 02 TABLES.pdf 951 099-CHAPTER06 U12 03 FIGURES.pdf 3950 100-CHAPTER07 U12 01 TEXT.pdf 1950 101-CHAPTER07 U12 02 TABLES.pdf 1698 102-CHAPTER07 U12 03 FIGURES.pdf 2504 103-CHAPTER08 U12 01 TEXT.pdf 1215 104-CHAPTER08 U12 02 TABLES.pdf 691 105-CHAPTER08 U12 03 FIGURES.pdf 5058 106-CHAPTER09 U12 01 TEXT.pdf 2432 107-CHAPTER09 U12 02 TABLES.pdf 2002 108-CHAPTER09 U12 03 FIGURES.pdf 23703 109-CHAPTER10 U12 01 TEXT.pdf 1108 Notice: When separated from Security Related Information (I.e., Enclosure 3), this document is decontrolled, provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390

Security Related Information Withhold From Public Disclosure Under 1 0 CFR 2.390 to AEP-NRC-2022-62 Page 5 of 7 Directory\\UFSAR-R File Name Approximate FIie Size (KB) 110-CHAPTER10 U12 02 TABLES.pdf 706 111-CHAPTER10 U12 03 FIGURES.pdf 9277 112-CHAPTER11 U12 01 TEXT.pdf 1394 113-CHAPTER11 U12 02 TABLES.pdf 1522 114-CHAPTER11 U12 03 FIGURES.pdf 4467 115-CHAPTER12 U12 01 TEXT.pdf 943 116-CHAPTER13 U12 01 TEXT.pdf 915 117-CHAPTER13 U12 02 TABLES.pdf 771 118-CHAPTER14.00 U1 01 TEXT.pdf 857 119-CHAPTER14.01 U1 01 TEXT.pdf 1986 120-CHAPTER14.01 U1 02 TABLES.pdf 1059 121-CHAPTER14.01 U1 03 FIGURES.pdf 77182 122-CHAPTER14.02 U1 01 TEXT.pdf 1521 123-CHAPTER14.02 U1 02 TABLES.pdf 934 124-CHAPTER14.02 U1 03 FIGURES.pdf 3840 125-CHAPTER14.03 U1 01 TEXT.pdf 3411 126-CHAPTER14.03 U1 02 TABLES.pdf 3360 127-CHAPTER14.03 U1 03 FIGURES Part 1 of 2.pdf 25551 128-CHAPTER14.03 U1 03 FIGURES Part 2 of 2.pdf 32101 129-CHAPTER14.04 U1 01 TEXT.pdf 712 130-CHAPTER14.A-G U1 01 TEXT.pdf 1024 131-CHAPTER14.A-G U1 03 FIGURES.pdf 651 132-CHAPTER14.00 U2 01 TEXT.pdf 832 133-CHAPTER14.00 U2 02 TABLES.pdf 687 134-CHAPTER14.01 U2 01 TEXT.pdf 1677 135-CHAPTER14.01 U2 02 TABLES.pdf 1076 136-CHAPTER14.01 U2 03 FIGURES.pdf 8461 137-CHAPTER14.02 U2 01 TEXT.pdf 1261 138-CHAPTER14.02 U2 02 TABLES.pdf 799 139-CHAPTER14.02 U2 03 FIGURES.pdf 2658 140-CHAPTER14.03.01-03 U2 01 TEXT.pdf 1385 141-CHAPTER14.03.01-03 U2 02 TABLES.pdf 1614 142-CHAPTER14.03.01-03 U2 03 FIGURES.pdf 5337 143-CHAPTER14.03.04 U2 01 TEXT.pdf 1874 144-CHAPTER14.03.04 U2 02 TABLES.pdf 4898 145-CHAPTER14.03.04 U2 03 FIGURES.pdf 20206 Notice: When separated from Security Related Information (i.e., Enclosure 3), this document is decontrolled, provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390

Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390 to AEP-NRC-2022-62 Page 6 of 7 Directory\\UFSAR-R File Name Approximate FIie Size (KB) 146-CHAPTER14.03.05-09 U2 01 TEXT.pdf 832 147-CHAPTER14.03.05-09 U2 02 TABLES.pdf 699 148-CHAPTER14.03.05-09 U2 03 FIGURES.pdf 600 149-CHAPTER14.04 U1 02 TABLES.pdf 1305 150-CHAPTER14.04 U2 01 TEXT.odf 4733 151-CHAPTER14.04 U2 02 TABLES.pdf 4059 152-CHAPTER14.04 U2 03 FIGURES.pdf 846 153-CHAPTER14.A U2 01 TEXT.pdf 685 154-CHAPTER15.00 U2 01 TEXT.pdf 1239 Notice: When separated from Security Related Information (i.e., Enclosure 3), this document Is decontrolled, provided the transmittal document does not otherwise warrant J

  • protection from unauthorized disclosure.

Security Related Information Withhold From PubliciDlsclosure Under 10 CFR 2.390

Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390 to AEP-NRC-2022-62 Page 7 of 7 OSM #3 (Enclosure 5)

OSM #3 File Descriptions: (All files are considered to be publicly available.)

CNP Report of Changes, Tests, and Experiments Pursuant to 10 CFR 50.59(d)(2)

CNP Commitment Change Summary CNP Unit 1 Technical Specification {TS) Bases - Revision 88 CNP Unit 2 TS Bases - Revision 84 CNP Unit 1 Technical Requirements Manual (TRM) - Revision 90 CNP Unit 2 TRM - Revision 90 CNP National Fire Protection Association 805 Fire Protection Program Manual -

Revision 5 CNP Nuclear Safety Capability Assessment - Revision 13 CNP Fire Safety Analysis - Revision 5 OSM #3 File Listing:

File Name Approx. File Size (KB) 155-REPORT-2022-50.59.pdf 114 156-REPORT-2022-COM CHG

SUMMARY

.pdf 35 157-TSB-U 1-R88.pdf 8354 158-TSB-U2-R84.pdf 7640 159-TRM-U1-R90.pdf 5117 160-TRM-U2-R90.pdf 5095 161-NFPPM-R05.pdf 1752 162-SSCA-R13.odf 9591 163-FSA-R05. pdf 9719 Notice: When separated from Security Related Information (i.e., Enclosure 3), this document is decontrolled, provided the transmittal document does not otherwise warrant

~protection from unauthorized disclosure.

Security Related Information

__;i Withhold From Public Disclosure Under 10 CFR 2.390