Similar Documents at Cook |
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARAEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report AEP-NRC-2022-50, Form OAR-1, Owner'S Activity Report2022-08-25025 August 2022 Form OAR-1, Owner'S Activity Report AEP-NRC-2022-42, Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-07-18018 July 2022 Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements AEP-NRC-2021-35, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-052021-05-0404 May 2021 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-05 AEP-NRC-2021-01, Form OAR-1, Owner'S Activity Report2021-01-14014 January 2021 Form OAR-1, Owner'S Activity Report AEP-NRC-2020-51, CFR 50.55a Request Associated with the Fifth Ten-Year Inservice Testing Interval2020-10-0505 October 2020 CFR 50.55a Request Associated with the Fifth Ten-Year Inservice Testing Interval AEP-NRC-2020-08, Form OAR-1, Owner'S Activity Report2020-01-29029 January 2020 Form OAR-1, Owner'S Activity Report AEP-NRC-2019-35, Form OAR-1, Owner'S Activity Report2019-08-0101 August 2019 Form OAR-1, Owner'S Activity Report AEP-NRC-2018-47, Submittal of Form OAR-1, Owner'S Activity Report2018-07-31031 July 2018 Submittal of Form OAR-1, Owner'S Activity Report AEP-NRC-2018-19, Submittal of 2017 Steam Generator Tube Inspection Report2018-05-22022 May 2018 Submittal of 2017 Steam Generator Tube Inspection Report AEP-NRC-2018-14, Form OAR-1, Owner'S Activity Report2018-03-23023 March 2018 Form OAR-1, Owner'S Activity Report AEP-NRC-2017-13, Transmittal of 2016 Steam Generator Tube Inspection Report2017-05-24024 May 2017 Transmittal of 2016 Steam Generator Tube Inspection Report AEP-NRC-2016-35, Fifth 10-Year Interval Pump and Valve Inservice Testing Program2016-06-30030 June 2016 Fifth 10-Year Interval Pump and Valve Inservice Testing Program ML15258A0242015-09-11011 September 2015 Supplement to 10 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval AEP-NRC-2015-65, Form OAR-1, Owner'S Activity Report2015-07-21021 July 2015 Form OAR-1, Owner'S Activity Report AEP-NRC-2015-01, Steam Generator Tube Inspection Report2015-04-13013 April 2015 Steam Generator Tube Inspection Report AEP-NRC-2015-06, Form OAR-1, Owner'S Activity Report2015-01-21021 January 2015 Form OAR-1, Owner'S Activity Report AEP-NRC-2014-13, Form OAR-1 Owner'S Activity Report2014-02-0707 February 2014 Form OAR-1 Owner'S Activity Report AEP-NRC-2013-54, Submittal of Form OAR-1, Owner'S Activity Report2013-08-14014 August 2013 Submittal of Form OAR-1, Owner'S Activity Report AEP-NRC-2012-63, 2012 Steam Generator Tube Inspection Report2012-10-0202 October 2012 2012 Steam Generator Tube Inspection Report ML12053A2622012-01-20020 January 2012 Form OAR-1 Owner'S Activity Report ML1106704232011-02-28028 February 2011 Form OAR-1 Owner'S Activity Report AEP-NRC-2010-56, Submittal of Owner'S Activity Report for Inservice Inspection Activities2010-07-0101 July 2010 Submittal of Owner'S Activity Report for Inservice Inspection Activities AEP-NRC-2010-19, Fourth Ten-Year Interval Inservice Testing Program Relief Request REL-0042010-02-0505 February 2010 Fourth Ten-Year Interval Inservice Testing Program Relief Request REL-004 ML1007506762009-10-23023 October 2009 Enclosure to AEP-NRC-2010-21, Donald C. Cook, Units 1 & 2 - ISI Program Plan Fourth Ten-Year Inspection Interval AEP-NRC-2009-51, Inservice Inspection Summary Report, Cycle 18, 2009 Refueling Outage2009-07-29029 July 2009 Inservice Inspection Summary Report, Cycle 18, 2009 Refueling Outage ML0904304002009-01-14014 January 2009 Request to Extend Inservice Inspection Interval for the Reactor Vessel Weld Examination and Request for License Amendment for Submittal of ISI Information and Analyses - Response to Request for Additional Information AEP-NRC-2008-41, Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination and Request for License - Amendment for Submittal of ISI Information and Analyses2008-10-0909 October 2008 Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination and Request for License - Amendment for Submittal of ISI Information and Analyses ML0822702052008-08-0505 August 2008 Relief Requests for Inservice Pressure Testing AEP-NRC-2008-12, Inservice Inspection Summary Report for Period of 11/14/2006 Through 04/29/20082008-07-24024 July 2008 Inservice Inspection Summary Report for Period of 11/14/2006 Through 04/29/2008 ML0804605022008-02-0404 February 2008 Inservice Inspection Summary Report for the Period of May 5, 2006 to November 6, 2007 ML0705206452007-02-0909 February 2007 Inservice Inspection Summary Report ML0631304122006-10-31031 October 2006 Steam Generator Tube Inservice Inspection Report ML0622804742006-08-0404 August 2006 Inservice Inspection Summary Report ML0600601102005-12-28028 December 2005 Fourth 10-Year Interval Pump and Valve Inservice Testing Program ML0521404632005-07-21021 July 2005 Inservice Inspection Summary Report ML0511601762005-04-15015 April 2005 Proposed Alternative to the ASME Code, Section XI, Repair Requirements ML0503903572005-01-31031 January 2005 Inservice Inspection Summary Report ML0430904912004-10-28028 October 2004 Steam Generator Tube Inservice Inspection Report ML0405600602004-02-19019 February 2004 Inservice Inspection Summary Report ML0326706222003-09-18018 September 2003 Inservice Inspection Summary Report ML0225301462002-09-0606 September 2002 NIS-1 Report for Inservice Inspection (ISI) Activities for Cycle 18 Refueling Outage (April 22, 2002 to June 9, 2002) ML0216804782002-06-13013 June 2002 Addendum to 1998 NIS-1 Report for Inservice Inspection Activities ML0215603962002-06-0303 June 2002 Steam Generator Tube Inservice Inspection Report ML0213700502002-05-15015 May 2002 NIS-1 Report for Inservice Inspection (ISI) Activities 2023-01-31
[Table view] Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] |
Text
Indiana Michigan Power Cook Nuclear Plant MICHIGAH One Cook Place Pa A Bridgman, Ml 49106 AEPcom A unit of American Electric Power January 20, 2012 AEP-NRC-2012-1 10 CFR 50.55a Docket No.: 50-315 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Unit 1 Form OAR-1 Owner's Activity Report This letter provides a copy of Form OAR-1 Owner's Activity Report for inservice inspection activities performed at Donald C. Cook Nuclear Plant (CNP) Unit 1 through the completion of the U1C24 refueling outage. This report meets the requirements of the American Society of Mechanical Engineers (ASME) Code Case N-532-4, "Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission, Section Xl, Division 1."
This code case is used as an alternative to the requirements of the ASME Boiler and Pressure Vessel Code, Section Xl, Article IWA-6000 as approved by Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability, ASME*Section Xl, Division 1, Revision 16."
The Authorized Code Inspection Company is OneCIS Insurance Co., of Lynn, Massachusetts. The Authorized Nuclear Inspector is Reuel Schenck.
There are no new or revised commitments in this letter. Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.
Sincerely, Michael H. Carlson Vice President - Site Support Services DMB/jen
Enclosure:
Form OAR-1 Owner's Activity Report-for the Donald C. Cook Nuclear Plant Unit 1 Refueling OutageU1C24
U. S. Nuclear Regulatory Commission AEP-NRC-2012-1 Page 2 c: J. T. King - MPSC, w/o enclosure S. M. Krawec - AEP Ft. Wayne, w/o enclosure MDNRE - WHMD/RPS, w/o enclosure NRC Resident Inspector C. D. Pederson - NRC Region III P. S. Tam - NRC Washington DC W. Valiance - DLEG/BCCFS/BD
Enclosure to AEP-NRC-2012-1 FORM OAR-1 OWNER'S ACTIVITY REPORT FOR DONALD C. COOK NUCLEAR PLANT UNIT 1 CYCLE 24 2011 REFUELING OUTAGE 7.-)
D.C. Cook Nuclear Unit 1 Form OAR-1 Owner's Activity Report Report Number 1-2011-4-1-01 Plant Donald C Cook Nuclear Plant, One Cook Place, Bridgman, Michigan 49106 (Name and Address of Plant)
Unit No. 1 Commercial Service Date 8/23/1975 Refueling Outage No. ULC24 (ifapplicable)
Current Inspection Interval 4th for Components and Supports (C&S) and 2nd for Containment ISI (CISI) Program (1st, 2nd, 3rd, 4th, other)
Current Inspection Period 1st for C&S and 1st for CISI (1st, 2nd, 3rd)
Edition and Addenda of Section Xl applicable to the inspection plans 2004 Edition/No Addenda Date and Revision of inspection plans 4/5/2011, Revision 2 for C&S, and 6/22/2011, Revision 1 for CISI Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Edition and Addenda are the same as the Inspection Plans Code Case used: N-526, N-566-2, N-586-1, N-624, N-648-1, N-716, N-722-1, N-729-1 for C&S and N-649 for CISI (If applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of U1C24 conform to the requirements of Section XI. (Refueling Outage Number)
Signed O Obnrss ) 7,. ?ge, Date o,.,/
0 era or Owner's Designee, Title L4DGt)
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by One CIS Insurance Co. of Lynn, MA have inspected the items described in this Owner's ActivityReport, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
(Commissions Michigan 300959, NB 11412, Endorsements: A, I, N & IS Inspectors Signature National Board, State, Province, and Endorsements Date O0f-I -Z 12 Page 1 of 3
., : V7:~~'7 "nZ. Cook- NucIearU W 17~
Items With flaws or relevant conditions that' required evaluation for continued service Examination Item Number Item Description Evaluation Description Category Evaluation of fibrous debris and staining. Evaluation concluded that material VE of Reactor Vessel Head with nozzles and partial penetration welds of was indeed fibrous and not Boric Acid. Additionally the staining was N-729-1 B4.40 PWSCC resistant materials determined to be from reactor head venting operations. Reference Work Order 55377628-01 for condition and evaluation.
B-P 1315.10 Evaluation of white substance at elbow on 1-NFP-222V2 Evaluation concluded that the substance was not boric acid and no leakage I_ I__ I_ was observed. Documented under AR 2011-12437.
Page 2 of 3
Abstract of repairfreplacement activities required for continued service Code Class Item Description Description of Work Date Complete Repair / Replacement Plan Number 1 Steam Generator 1-OME-3-1 Tube Plugging Mechanical tube plugging of 8 tubes due to wear indications 10/7/t1 Work Order Task 55315870-31 1 Steam Generator 1-OME-3-2 Tube Plugging Mechanical tube plugging of 1 tubes due to wear indications 10/7/11 Work Order Task 55315871-18 1 Steam Generator 1-OME-3-3 Tube Plugging Mechanical tube plugging of 11 tubes due to wear 10/8/11 Work Order Task 55315872-17
_indications 1 Steam Generator 1-OME-3-4 Tube Plugging Mechanical tube plugging of 6 tubes due to wear indications 10/8/11 Work Order Task 55315873-17 Page 3 of 3