April 23, 2024
U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Peach Bottom Atomic Power Station Units 1, 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) Facility Operation License DPR-12, DPR-44 and DPR-56 NRC Docket 50-171, 50-277 and 50-278 and ISFSI Docket 72-29
Subject:
Annual Radioactive Effluent Release Report 66 January 1, 2023 through December 31, 2023
Enclosed is the Annual Radioactive Effluent Release Report 66, January 1, 2023 through December 31, 2023, for Peach Bottom Atomic Power Station, Units 1, 2 and 3.
This report is being submitted in compliance with 10 CFR 50.36a(2) and the Technical Specifications of Operating Licenses DPR-44 and DPR-56 and to fulfill the requirements of Offsite Dose Calculation Manual Specifications (ODCMS) 3.10.2. Additionally, this report is submitted to satisfy the annual effluent reporting requirements for the ISFSI required by the ODCM.
The ODCM was revised once during the 2023 reporting period. The revision is attached in Appendix A.
If you have any questions or require additional information, please do not hesitate to contact the Chemistry Manager at 717-456-4280.
Sincerely,
Ryan Stiltner, Plant Manager Peach Bottom Atomic Power Station
RS/WS/TH/RF/RJ/EW
Enclosure (1)-2023 Annual Radioactive Effluent Release Report Cc: Regional Administrator - NRC Region 1 NRC Senior Resident Inspector - Peach Bottom Atomic Power Station
CCN 24-15 PEACH BOTTOM ATOMIC POWER STATION Unit Numbers 2 and 3 Docket Numbers 50- 277 and 50- 278 Unit Number 1 Docket Number 50- 171 PBAPS Independent Spent Fuel Storage Installation Docket Number 72-29
RADIOACTIVE EFFLUENT RELEASE REPORT
NO. 66
JANUARY 1, 2023 THROUGH DECEMBER 31, 2023
Submitted to The United States Nuclear Regulatory Commission Pursuant to Facility Operating Licenses DPR-44 and DPR- 56 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
(This page intentionally left blank)
2 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
TABLE OF CONTENTS INTRODUCTION ......................................................................................................................................5 ATTACHMENT 1: SUPPLEMENTAL INFORMATION .................................................................................7 Regulatory Limits ......................................................................................................................8 Maximum Permissible Concentrations .....................................................................................8 Average Energy .........................................................................................................................9 Minimum Detectable Concentrations ......................................................................................9 Measures and Approximations of Total Radioactivity ..............................................................9 Decommissioned Unit 1 Liquid Radioactive Waste Processing .............................................. 10 Batch Releases ........................................................................................................................ 11 Average Stream Flow .............................................................................................................. 11 Abnormal or Unplanned Releases .......................................................................................... 12 Liquid Releases ....................................................................................................................... 12 Gaseous Releases ................................................................................................................... 13 Missed Sampling ..................................................................................................................... 13 Radiation Monitors Out of Service for Greater than 30 days ................................................. 13 Changes to the ODCM ............................................................................................................ 14 Violations ................................................................................................................................ 14 Dose Assessment .................................................................................................................... 15 Introduction............................................................................................................................ 15 Liquid Dose Assessment ......................................................................................................... 15 Gaseous Dose Assessment ..................................................................................................... 16 ATTACHMENT 2: EFFLUENT
SUMMARY
............................................................................................... 19 Gaseous Effluents - Summation of All Releases ...................................................................... 20 Gaseous Effluents Release Point: Elevated (Main Offgas Stack) ............................................. 21 Gaseous Effluents Release Point: Ground- Level (Units 2 and 3 Reactor Building Exhaust Vents and Abnormal Releases) ............................................................................................... 22 Liquid Effluents - Summation of All Releases .......................................................................... 23 Liquid Effluents Release Points - Liquid Radwaste, RHR Leaks and Groundwater ................. 24 ATTACHMENT 3: SOLID WASTE AND IRRADIATED FUEL SHIPMENTS .................................................. 25 Solid Waste Shipped ............................................................................................................... 26 Irradiated Fuel Shipments ....................................................................................................... 28 Changes to Process Control Program (PCP) ............................................................................ 28 3
Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC ATTACHMENT 4: RADIOLOGICAL IMPACT ON MAN ............................................................................ 29 Radiological Impact on Man ................................................................................................... 30 40 CFR 190 Doses.................................................................................................................... 30 ATTACHMENT 5: METEOROLOGICAL DATA ......................................................................................... 31 APPPENDIX A: ODCM REVISION8 8
Technical Concurrence (for accuracy of information):
Manager, Site Chemistry and Radwaste Date
4 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
INTRODUCTION
In accordance with the Reporting Requirements of Technical Specification 5.6.3 applicable during the reporting period, January 1, 20 23 through December 31, 20 23, this report summarizes the Effluent Release Data for Peach Bottom Atomic Power Station (PBAPS) Units 1, 2 and 3. The notations E+ and E- are used to denote positive and negative exponents to the base 10, respectively.
The release of radioactive materials during the reporting period was within the Offsite Dose Calculation Manual Specification (ODCMS) limits.
In addition to the normal effluent releases from Units 2 and 3, there w ere three sources of abnormal releases of low-level radioactive material, one from releasing contaminated water and gas from the auxiliary boilers, one from groundwater tritium contamination ('tritium plume'),
and one from leaking Residual Heat Removal (RHR) heat exchangers . These releases were far below regulatory limits.
For all gaseous releases from Units 2 and 3, the maximum calculated organ dose (bone) from iodines (I-131, I-133 and I-135), tritium (H-3), carbon-14 (C-14) and particulates with a > 8-day half-life to any individual was 8.13E-02 mrem, which was approximately 2.71 E-01% of the annual limit. The maximum calculated air dose in the unrestricted area due to noble gas effluents was 2.96E-0 2 mrad (gamma) and 2.02E-02 mrad (beta), which was 1. 48E-01% and 5. 05E-0 2%,
respectively, of the annual limits.
In 2023 , there were no direct gaseous or liquid releases or discharges from Unit 1 to the environment. Additionally, there were no gaseous or liquid radioactive releases from the Independent Spent Fuel Storage Installation, NRC Docket No. 72-29 (ISFSI).
No changes were made to RW-AA- 100 "Process Control Program for Radioactive Waste" in the 2023 reporting period. There was one revision to the ODCM in Appendix A during the 2023 reporting period to update milk sample locations and farm identification nomenclature.
5 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Constellation common procedures, which provide consistent expectations and standards for Radioactive Effluents Controls Program (RECP), were used to generate this report. PBAPS site specific procedures used to assist with abnormal/unplanned releases were also used to generate this report. They are:
CY-AA-170-000, Radioactive Effluent and Environmental Monitoring Program CY-AA-170-100, Radiological Environmental Monitoring Program CY-AA-170-200, Radioactive Effluent Controls Program CY-AA-170-300, Offsite Dose Calculation Manual Administration CY-AA-170-2000, Annual Radioactive Effluent Release Report CY-AA-170-2100, Estimated Errors of Effluent Measurement CY-AA-170-3100, Offsite Dose Calculation Manual Revisions CY-AA-170-2300, Determination of Carbon-14 in Gaseous Effluents CY-PB-170-202, RHR- HPSW Leak Rate Calculation CY-PB-170-2020, Radiological Abnormal Gaseous Release Assessment CY-PB-170-210, Gaseous Dose and Dose Rate Calculation CY-PB-170-2000, Annual Radioactive Effluent Release Report CY-PB-170-2300, OpenEMS Effluent Management System Implementation Peach Bottom Atomic Power Station, Offsite Dose Calculation Manual and Specifications (Appendix A)
6 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
ATTACHMENT 1: SUPPLEMENTAL INFORMATION
7 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Regulatory Limits
Table 1. Noble Gas Dose Rate and Dose Limits
Maximum Value Units Limit Classification Specification
500 mrem/ yr annual total body dose rate ODCM Specification 3.8.C.1.a 3000 mrem/ yr annual skin dose rate ODCM Specification 3.8.C.1.a 10 mrad gamma radiation in air dose per quarter ODCM Specification 3.8.C.2.a 20 mrad beta radiation in air dose per quarter ODCM Specification 3.8.C.2.b 20 mrad gamma radiation in air dose per year ODCM Specification 3.8.C.2.c 40 mrad beta radiation in air dose per year ODCM Specification 3.8.C.2.d
Table 2. Iodines, Tritium and Particulates (with half-lives >8 days) Dose Rate and Dose Limits Maximum Units Limit Classification Specification Value 1500 mrem/ yr annual dose rate limit to any organ ODCM Specification 3.8.C.1.b 15 mrem dose limit to any organ per quarter ODCM Specification 3.8.C.3.a 30 mrem dose limit to any organ per year ODCM Specification 3.8.C.3.b
Table 3. Liquid Effluent Activity Concentration and Dose Rate Lim its Maximum Value Units Limit Classification Specification
10 times 10 CFR 20, Appendix B, Table 2, µCi/ mL Activity Concentration in all liquid releases ODCM Specification 3.8.B.1.a Column 2 2E-04 µCi/ mL total activity concentration for all dissolved and ODCM Specification 3.8.B.1.b entrained noble gases 3 mrem total body dose limit per quarter ODCM Specification 3.8.B.2.a 10 mrem dose limit to any organ per quarter ODCM Specification 3.8.B.2.a 6 mrem total body dose limit per year ODCM Specification 3.8.B.2.b 20 mrem dose limit to any organ per year ODCM Specification 3.8.B.2.b
Maximum Permissible Concentrations Gaseous dose rates, rather than effluent concentrations, are used to calculate permissible release rates for gaseous releases. The maximum permissible dose rates for gaseous releases are defined in ODCMS 3.8.C.1.a . and 3.8.C.1.b.
The Effluent Concentrations Limits (ECL) specified in 10 CFR 20, Appendix B, Table 2, Column 2 multiplied by 10, for identified nuclides, are used to calculate permissible release rates and concentrations for liquid release per ODCMS 3.8.B.1.
The total activity concentration for all dissolved or entrained noble gases is limited to < 2E-04
µCi/mL (ODCMS 3.8.B.1.b).
8 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC Average Energy The PBAPS ODCM limits the dose-equivalent rates due to the release of noble gases to less than or equal to 500 mrem/year to the total body and less than or equal to 3000 mrem/year to the skin. Therefore, the average beta and gamma energies of the radionuclide mixture in releases of fission and activation gases as described in Regulatory Guide 1.21, Revision 1, "Measuring, Evaluation, and Reporting Radioactivity in Solid Wastes and Releases of Radioactive Materials in Liquid and Gaseous Effluents from Light-Water-Cooled Nuclear Power Plants," are not applicable to PBAPS.
Minimum Detectable Concentrations If a radionuclide was not detected, "<LLD" was reported as the activity. Samples were analyzed with techniques that achieved the required Lower Limits of Detection (LLD) specified in ODCMS Table 4.8.B.1, "Radioactive Liquid Waste Sampling and Analysis" (for liquids) or ODCMS Table 4.8.C.1, "Radioactive Gaseous Waste Sampling and Analysis from Main Stack and Vent Stack" (for gases). In all cases, the LLD requirements were satisfied.
Measures and Approximations of Total Radioactivity
Fission and Activation Gases The method used for gamma isotopic analysis is the Canberra GenieTM System with a gas marinelli beaker. Grab samples are taken and analyzed monthly to determine the isotopic mixture of noble gas activity released for the month. Airborne effluent gaseous activity was continuously monitored and recorded in accordance with ODCMS Table 4.8.C.1. The data from the noble gas radiation monitor were analyzed to report noble gas effluent activities. When no activity was identified in the grab isotopic analysis (un-id(s) or un-id(v)), the entire release must be assumed to be the radionuclide with the most -limiting dose factors for the release pathway (i.e. krypt on-88 (Kr-88) for all ground- level releases, Kr-88 for elevated gamma dose and Kr- 87 for elevated beta dose; see ODCM IV.B and NUREG-01331). The activity released is listed as "unidentified" in the Attachment 2 Tables. If activity was found in the grab isotopic analysis, the isotopic mixture for the Noble Gas Monitor was determined from that isotopic mixture.
Iodines The method used is the Canberra GenieTM System with a charcoal cartridge. Iodine activity was continuously sampled and analyzed in accordance with ODCMS Table 4.8.C.1.
Particulates The method used is the Canberra GenieTM System with a particulate filter (47 mm diameter).
Particulate activity was continuously sampled and analyzed in accordance with ODCM Table 4.8.C.1.
Composite particulate air samples were submitted to an offsite vendor laboratory for analyses of strontium-89 (Sr-89), Sr- 90, n ickel-63 (Ni-63) and gross alpha.
1 NUREG 0133, "Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants: A Guidance Manual for Users of Standard Technical Specifications," October 1978.
9 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Carbon-14 The amount of C-14 released was estimated using the guidance from the Electric Power Research Institute (EPRI) Technical Report 1021106, "Estimation of Carbon-14 in Nuclear Power Plant Gaseous Effluents". The C-14 was released primarily through the Main Offgas Stack (9.70E+01%)
with a small amount (3.00E+00%) through the Reactor Building Exhaust Vents. The C-14 in liquid effluents is not a significant dose pathway, as determined from studies.
Liquid Effluents Gamma isotopic activity concentrations are determined on each batch of liquid effluent prior to release using the Canberra GenieTM System in accordance with ODCMS Table 4.8.B.1. The total activity of a released batch is determined by multiplying each nuclide's concentration by the total volume discharged.
Composite liquid radwaste samples are analyzed for tritium on-site and submitted to an offsite vendor laboratory for analyses of iron-55 (Fe-55), phosphorus-32 (P-32), Sr-89, Sr-90, Ni-63, and gross alpha.
Estimate of Total Error Present CY-AA-170-2100, "Estimated Errors of Effluent Measurements", provides the methodology to obtain an overall estimate of the error associated with radioactive effluents, which are listed in Attachment 2 of this report.
Decommissioned Unit 1 Liquid Radioactive Waste Processing
In 2023, there were no direct gaseous or liquid releases or discharges from Unit 1 to the environment. During the reporting period, there were twelve drums of Unit 1 water (488.3 gallons) collected between November 2020 and December 2022 transferred to th e Unit 2 and Unit 3 liquid radwaste system for release from the B Laundry Drain Tank. Due to a pump seal failure, the contents were not released and drained from the tank to the floor drain entering the Unit 2 and Unit 3 radwaste system. This water was u ltimately processed by the Unit 2 and Unit 3 liquid radwaste system and reused in the plant.
10 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Batch Releases Table 4. Quarterly Liquid Batch Release Statistics
First Quarter Second Quar ter Third Quarter Fourth Quarter Number of Batch 18 5 24 6 Releases Total Time for Batch 3.17E+03 6.65E+02 3.40E+0 3 6.04E+0 2 Releases (minutes)
Maximum time period for batch release 7.95E+02 2.70E+02 3.90E+0 2 1.40 E+02 (minutes)
Average time period for batch release 1.76E+02 1.33E+02 1.42E+02 1.01E+02 (minutes)
Minimum time period for batch release 1.15E+02 3.00E+01 6.50E+01 4.30E+01 (minutes)
Average Stream Flow 1.57E+0 5 9.41E+0 4 7.62E+0 4 1.09E+05 (ft3/s)2,3 Dilution volume 6.49E+11 6.66E+11 6.93E+11 2.67E+12 (liters)
Table 5. Quarterly Gaseous Batch Release Statistics
First Quarter Second Quar ter Third Quarter Fourth Quarter Number of batch 1 0 0 0 releases:
Total Time for batch 1.90E+03 0 0 0 releases (minutes)
Maximum time period for batch release 1.90E+03 0 0 0 (minutes)
Average time period for batch release 1.90E+03 0 0 0 (minutes)
Minimum time period for batch release 1.90E+03 0 0 0 (minutes)
Average Stream Flow The river flow is not used for dose calculations. The actual flow rate of Circulation Water (the water that is circulated within the plant for cooling) is determined for each liquid effluent release because this Circulation Water provides dilution and therefore reduces the projected dose.
2 Average Stream Flow is not used for dose calculation.
3 USGS National Water Information System, Site Name: "Susquehanna River at Marietta, PA", Site Number:
01576000. Data accessed 17 April 2024.
11 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC Abnormal or Unplanned Releases
'Abnormal' releases are those releases that are not defined as 'normal' releases in the Licensee's ODCM. Systems with a potential for an unplanned release are monitored to ensure if a release were to occur it would be identified and quantified appropriately. Source terms used for dose calculations utilize direct sampling and the maximum concentrations of nuclides to ensure that the most conservative and bounding estimates are used. Methodologies calculate conservative doses utilizing conservative mathematical models to describe int ake and exposure pathways. Therefore, reported doses for these abnormal releases are calculated conservatively.
Liquid Releases Groundwater Tritium Plume During 2023, sampling and analysis of the Radiological Ground Water Protection Program (RGPP), identified measurable tritium activity at several locations around the site. The ground water that had detectable tritium was determined to flow into the plant intake and eventually flow into the normal discharge canal. Details of this program can be found in the Peach Bottom Annual Radiological Environmental Operating Report (AREOR) as an appendix. No other nuclides were detected in monitoring wells.
Analysis of Release It was assumed from the maximum flow rates measured that ground water flowed to the discharge canal at a steady rate of 3. 44E+02 gpm, carrying with it some of the tritium underneath the plant. The ground water flow rate was updated in December 2022, when the new report was provided4. The conservative maximum dose for the entire year from this continuous release is calculated to be 5.16E- 05 mrem to the whole -body and 4.07E-05 mrem to any organ (except bone5 which is 0.00E+00 mrem)6. This dose contribution projection is well below the limit specified in the ODCM.
Contaminated Auxiliary Boiler During 2023 , trace amounts of H-3 activity were identified in the auxiliary boiler. Sampling and monitoring of the boiler and deaerator water was performed prior to start up, during operations, and after lay-up to identify any tritium contamination with potential for release.
Liquid release s occurred during blow downs to aid in improving conductivity and turbidity in the operating boiler and for boiler drain down during boiler outage window. The source of the trace amounts of H-3 was identified and fixed in October of 2023.
4 "Estimated Mass Flux Of Tritiated Groundwater To The Conowingo Reservoir And Rock Run Creek, Peach Bottom Atomic Power Station, Delta, Pennsylvania", December 2022, GHD formerly Conestoga- Rovers & Associates.
5 Tritium dose factor for bone is 0.00E+00; therefore, no hypothetical dose is calculated.
6 Organ doses are identical because the dose factors are identical for the same nuclide and pathway.
12 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Analysis of Release There were multiple abnormal liquid releases due to contamination found in the auxiliary boilers. Samples were counted to effluent LLDs for gamma and H-3, and any positive activity was used to quantify the release. The releases were documented in the effluent management software (OpenEMS) and the total organ dose was determined to be 2.27E-08 mrem to the child liver ( 1.13E-07% of annual limit) and 2.27E-08 mrem to the child total body ( 3.79E-07% of annual limit).
Heat Exchanger Leakage In July 2023, low-level tritium was identified in Unit 3 C-RHR system. The RHR system is designed to circulate water to remove heat from the reactor unit when necessary, by using a heat exchanger with river water as the cooling medium. The dose model assumes that contaminated torus water leaks into the river water running through the heat exchanger, regardless of operating pressure to ensure conservatism in calculated dose. As an additional precaution, installed radiation monitoring instrumentation can indicate an inadvertent release of radioactive material should the heat exchanger develop a large leak unexpectedly.
Analysis of Release It was assumed that the torus water released to the discharge canal contributed a conservative dose of 1.66E -12 mrem to the total body (child receptor). The release was conservatively calculated for three months. System was resampled following next system run, and results were found to be <LLD.
Gaseous Releases Contaminated Auxiliary Boiler While the boiler was in operation, the roof vent was opened to maintain system pressure , on startup, and low demand operations. The conservative assumption is that the steam released through the auxiliary boiler contained the same activity that was identified during liquid sampling and therefore, needed to be documented as a release. The highest identified H -3 activity concentration from either the steam/mud drums or the deaerator was used to quantify the release. There was one documented release of the steam from the auxiliary boiler containing activity in 202 3. The steam flow rate was assumed to be the load rate % on the boiler, which is overly conservative, but there is no measurement of boiler exhaust flow rat e.
The total dose to infant thyroid was 1.35E-07 mrem, 4.56E-05 % of quarterly limit. The conservative nature of the release assumptions show that the dose impact is minimal to the public.
Missed Sampling There were no missed ODCM samples in 202 3.
Radiation Monitors Out of Service for Greater than 30 days There were no radiation monitors out of service for greater than 30 days in 2023.
13 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Changes to the ODCM There was one revision made to the ODCM and to the ODCM Specifications (Appendix A) during 2023. Milk Farm J was removed from the REMP sampling program due to the herd being sold. Farms M-1C and M- 4C were added to the program. In addition to the inclusio n of two new farms, all sample identifiers were updated for the existing milk sampling locations.More information regarding this change can be found in the 2023 AREOR.
Violations There were no effluent release violations for the 2023 reporting period.
14 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Dose Assessment Introduction A dose assessment for PBAPS was conducted with the measured cumulative 2023 radioactive effluent source terms, provided in Attachment 2, "Effluent Summary," and the 2023 meteorological (MET) data. This dose assessment verifies that PBAPS continues to demonstrate compliance with the limits as well as the requirement of maintaining the doses "as low as is reasonably achievable" as stated in 10 CFR 50, Appendix I.7
Liquid Dose Assessment
Hydrologic Condit ions and Recept or Locations of Interest PBAPS is located on the Conowingo Pond formed in the Susquehanna River by the Conowingo Dam. For 2023, the annual average river flow8 was measured as 3.63E +04 ft3/s.
Of the three separate flow regimes that were used in the original Appendix I submittal, the most limiting of them (<1.50E+04 ft3/s) was used to calculate a dose assessment for this report because this would provide a bounding extreme for all PBAPS liquid effluents. Therefore, although the actual average stream flow for the year was more than double the limiting case, this report will provide an upper limit for the most-limiting dose.
The annual average dilution factor9 at the Conowingo Int ake is 5.40E+00 and the assumption for the reconcentration factor9 is 1.16E+00. The PBAPS shore width factor10 of 2.00E-01 was also used.
No invertebrate int ake was examined because invertebrate ingestion pathways are not considered to be significant in the area close to PBAPS. The pathway factors for the various age groups, used to determine dose to the public from liquid effluents are shown in Table 6.
Table 6. Consumption and Usage Rate Assumptions Pathway Adult Teenager Child Infant Units Eating Fish10 2.10E+01 1.60E+01 6.90E+00 0.00E+00 kg/ yr Drinking Water11 7.30E+02 5.10E+02 5.10E+02 5.10E+02 L/ yr Swimming12 2.80E+02 2.80E+02 0.00E+00 0.00E+00 h/ yr Boating12 1.20E+02 1.20E+02 6.70E+01 0.00E+00 h/ yr Shoreline Recreation12 3.25E+02 3.25E+02 1.40E+01 0.00E+00 h/ yr Fishing from Co nowingo Dam12 3.25E+02 3.25E+02 0.00E+00 0.00E+00 h/ yr
710 CFR 50 Appendix I, "Numerical Guides for Design Objectives and Limiting Conditions for Operation to Meet the Criterion "As Low as is Reasonably Achievable" for Radioactive Material in Light-Water- Cooled Nuclear Power Reactor Effluents".
8 USGS National Water Information Service; Monitoring Site 01576000, Susquehanna River at Marietta, PA; http://waterdata.usgs.gov/nwis. Data accessed 17 April 2024.
9 From original ODCM.
10 RG 1.109, Table A-2.
11 All locations from RG 1.109, Section A-2. Chester Water Authority uses 10% of the RG 1.109 value because it is assumed to have 10% sourced from Conowing o Pond.
12 PBAPS Environmental Report, Supplement No. 3, Page 19. Boating data is a ratio of Adult:Child rates from RG 1.109, Table A-2.
15 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Liquid Effluent Dose Assessment Conclusion For all permitted releases in 20 23, the calculated total body dose was 1.93E-03 mrem and 2.89E-03 mrem to the limiting organ of child Liver.
Therefore, PBAPS liquid radioactive effluent controls continue to demonstrate compliance with 10 CFR 50, Appendix I objectives for the purposes of keeping doses to members of the public "as low as is reasonably achievable". These limiting or maximum calculated doses are a small fraction of the limits in Appendix I.
Gaseous Dose Assessment The gaseous dose assessment calculates the conservative dose at the limiting receptor location, as defined in the ODCM and at locations from the land-use census, using the 2023 meteorology to demonstrate compliance with 10 CFR 50, Appendix I. The assessment compares the current ODCM locations to the maximum locations from the land use census to ensure the current ODCM locations are still the most impactful dose locations.
Tables 7 and 8 report the dose calculated with the CY-PB-170-210 spreadsheet using the 2023 MET data and total gaseous activity released (summarized in Attachment 2), including C-14. Table 7 focuses on the two locations with the highest elevated dispersion factor (X/Q) from the M ain Offgas Stack, while Table 8 highlights the two locations with the highest ground deposition factor (D/Q) from the Reactor Building Exhaust V ents. The X/Q values are very similar to those used in the ODCM, and therefore the differences in noble gas dose is minimal. The larger discrepancies between iodine, particulates, tritium (I/P/T) organ doses can be explained by the differences in pathways. Tables 7 and 8 assume that there is a milk pathway at each of the listed locations.
The ODCM defines the m ilk pathway at 1500m SW and the D/Qs are more comparable (2023 vent: 2.19E-09 1/m2 vs. ODCM vent: 1.58E-09 1/m2) and therefore, the dose calculated by ODCM methodology is more accurately representative of the dose to members of the public than the dose s reported in Tables 7 and 8 .
Table 7. Conservative Maximum Elevated Release Dose from 2023 Source Term and 2023 Meteorology Distance 2023 2023 Vent TotalBody Skin Gamma Beta Air I/P/T/C- Limiting (m) Direction Highest MS X/Q Dose Dose Air Dose Dose 14 Dose Receptor X/Q (D/Q) (D/Q) (mrem) (mrem) (mrad) (mrad) (mrem) 5900 N 5.09E-08 8.37E-08 2.23E-03 2.91E-03 2.30E-03 1.60E-03 1.99E-01 Bone (1.78E-10) (3.56E-10) 3800 SW 3.68E-08 1.33E-07 3.48E-03 4.51E-03 3.60E-03 2.45E-03 1.52E-01 Bone (2.31E-10) (5.13E-10)
Table 8. Ground- Level Dose from 2023 Source Term and 2023 Meteorology Distance 2023 Highest 2023 MS Total Body Skin Gamma Beta Air I/P/T/C- Limiting (m) Direction Vent X/Q X/Q Dose Dose Air Dose Dose 14 Dose Receptor (D/Q) (D/Q) (mrem) (mrem) (mrad) (mrad) (mrem) 1200 SSE 1.16E-06 7.69E-09 2.97E-02 3.85E-02 3.07E-02 2.07E-02 1.63E-01 Bone (1.10E-08) (7.71E-10) 900 NW 1.44E-06 3.29E-09 3.68E-02 4.77E-02 3.81E-02 2.57E-02 1.79E-01 Bone (7.83E-09) (4.46E-10) 16 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Gaseous Radioactive Eff luent Dose Assessment Conclusion The conservative maximum dose was 8.14E-02 mrem with the maximum receptor as the child bone which is due to the incorporation of carbon-14 in the calculation. Without C-14, the maximum dose is 2.18E-03 mrem to the infant thyroid. The noble gas limiting air doses were 2.96E-0 2 mrad (gamma) and 2.02E-02 mrad (beta). Noble gas plume conservative dose was 2.87E-02 mrem to the total body and 3.74E-02 to the skin mrem for the year.
A dose assessment was performed for members of the public due to their activities inside the site boundary, per ODCMS 3.10.2.f. The locations where a member of the public would spend a significant amount of time inside the site boundary are two new v ehicle checkpoints ,
approximately 780 feet ENE (Emergency checkpoint) and 910 feet NNE (Warehouse checkpoint) of the PBAPS Unit 2 and Unit 3 reactor building exhaust vents. Assuming continuous occupancy, the calculated total body and skin doses were 2.21E-01 mrem and 2.87E-01 mrem for the Emergency checkpoint and 2.46E-02 mrem and 3.18E-02 mrem for the Warehouse checkpoint, respectively. The noble gas limiting air doses were 2.29E-01 mrad (gamma) and 1.55E- 01 mrad (beta) for the Emergency checkpoint and 2.54E-02 mrad (gamma) and 1.72E-02 mrad (beta) for the Warehouse checkpoint. These doses are overly conservative, as typically vehicles and their drivers are not at the checkpoints 24/7. The maximum organ dose from the inhalation pathway, not including C -14, is 6.47E-03 mrem for the Emergency checkpoint and 7.16 E-04 mrem for the Warehouse checkpoint, both to the infant thyroid.
All doses are projected to be much less than the limits, as expected. Again, these dose models incorporate several factors of conservatism including a source term that, by procedure, will use the most dose-limiting noble gas nuclide when no fission gas can be identified by grab sample, but activity is detected from the effluent radiation monitor. Constellation uses a detailed C-14 dose projection from the Electric Power Research Institute, Technical Report 1021106. Details for the assumptions used in this calculation may be found there.15
Therefore, PBAPS gaseous radioactive effluent controls continue to demonstrate compliance with 10 CFR 50, Appendix I objectives for the purposes of keeping doses to members of the public "as low as is reasonably achievable". These limiting or maximum calculated doses are a small fraction of the limits in Appendix I.
15 PBAPS uses specific Boiling Water Reactor assumptions because the fraction of C-14 that is in the CO2 form will vary based on general plant design. This is important because the major do se pathway is through photosynthesis and, therefore, only the oxide form is relevant.
17 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC ERRATA
In 2021 and 2022, there was one section of the Effluent Summary Attachment that required revision. The percent of Gamma Air Dose and percent of Beta Air Dose did not have the correct dose limits applied to the calculation. Please see the corrected table sections below.
Gaseous Effluents - Summation of All Releases
Period: January 1, 2021 through December 31, 2021 Unit: Peach Bottom
Est. Total A. Fission & Activation Gases Units Quarter 1 Quarter 2 Quarter 3 Quarter 4 Error %
- 1. Total Release Ci 9.45E+01 9.78E+01 8.72E+01 6.34E+00 4.00E+01
- 2. Average release For the Period uCi/ s 1.22E+01 1.24E+01 1.04E+01 8.92E+00
- 3. Gamma Air Dose mrad 4.27E-02 4.08E-02 3.16E-02 3.30E-03
- 4. Beta Air Dose mrad 2.92E-02 2.79E- 02 2.15E-02 2.24E-03
- 5. Percent of ODCM limit Gamma Air Dose (10 mrad/qtr) % 4.27E-01 4.08E-01 3.16E-01 3.30E-02 Beta Air Dose (20 mrad/qtr) % 1.46E-01 1.40E-01 1.08E-01 1.12E-02
Period: January 1, 2022 through December 31, 2022 Unit: Peach Bottom
Est. Total A. Fission & Activation Gases Units Quarter 1 Quarter 2 Quarter 3 Quarter 4 Error %
- 1. Total Release Ci <LLD 1.75E+00 5.41E-01 2.16E+01 4.00E+01
- 2. Average release For the Period uCi/ s 0.00E+00 2.22E-01 6.81E-02 2.72E+00
- 3. Gamma Air Dose mrad <LLD 2.72E-05 6.90E-07 8.99E-03
- 4. Beta Air Dose mrad <LLD 5.69E-05 3.37E-06 6.21E-03
- 5. Percent of ODCM limit Gamma Air Dose (10 mrad/qtr) % 0.00E+00 2.72E-04 6.90E-06 8.99E-02 Beta Air Dose (20 mrad/qtr) % 0.00E+00 2.85E-04 1.69E-05 3.11E-02
18 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
ATTACHMENT 2: EFFLUENT
SUMMARY
19 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Gaseous Effluents - Summation of All Releases Period: January 1, 2023 through December 31, 2023 Unit: Peach Bottom
A. Fission & Activation Gases Units Quarter 1 Quarter 2 Quarter 3 Quarter 4 Est. Total Error %
- 1. Total Release Ci 1.22E+01 5.43E+00 4.87E+00 3.84E+01 4.00E+01
- 2. Average release For the Period uCi/s 1.57E+00 6.91E-01 6.13E-01 4.84E+00
- 3. Gamma Air Dose mrad 6.57E-03 1.46E-03 1.55E-03 2.01E-02
- 4. Beta Air Dose mrad 4.45E-03 1.05E-03 1.09E-03 1.36E-02
- 5. Percent of ODCM limit Gamma Air Dose (10 mrad/qtr) % 6.57E-02 1.46E-02 1.55E-02 2.01E-01 Beta Air Dose (20 mrad/qtr) % 2.23E-02 5.25E-03 5.45E-03 6.80E-02
B. Iodines
- 1. Total I-131 Ci 2.31E-05 3.35E-05 4.06E-05 1.48E-04 1.90E+01
- 2. Average release For the Period uCi/s 2.97E-06 4.26E-06 5.11E-06 1.87E-05
- 3. Percent of ODCM limit % * * * *
- No ODCM defined Curie Limit, therefore a percentage of the limit cannot be calculated.
C. Particulate
- 1. Particulates with T1/2 > 8 days Ci 2.53E-05 2.54E-05 7.74E-05 2.23E-04 2.80E+01
- 2. Average release For the Period uCi/s 3.25E-06 3.23E-06 9.74E-06 2.81E-05
- 3. Percent of ODCM limit % * * * *
- No ODCM defined Curie Limit, therefore a percentage of the limit cannot be calculated.
D. Tritium
- 1. Total Release Ci 1.47E+01 1.15E+01 1.02E+01 6.13E+00 1.30E+01
- 2. Average release For the Period uCi/s 1.89E+00 1.46E+00 1.28E+00 7.71E-01
- 3. Percent of ODCM limit % * * * *
- No ODCM defined Curie Limit, therefore a percentage of the limit cannot be calculated.
E. Gross Alpha
- 1. Total Release Ci <LLD <LLD <LLD <LLD 4.00E+02
- 2. Average release For the Period uCi/s <LLD <LLD <LLD <LLD
- 3. Percent of ODCM limit % * * * *
- No ODCM defined Curie Limit, therefore a percentage of the limit cannot be calculated.
F. Carbon-14
- 1. Total Release Ci 9.47E+00 9.53E+00 9.45E+00 8.74E+00
- 2. Average release For the Period uCi/s 1.22E+00 1.21E+00 1.19E+00 1.10E+00
G. Iodine-131, 133 and 135, Tritium, Carbon-14 & Particulate
- 1. Organ Dose* mrem 2.07E-02 2.08E-02 2.07E-02 1.93E-02
- 2. Percent ODCM limit % 1.40E-01 1.40E-01 1.40E-01 1.30E-01
- C -14 contributes most significantly; therefore, the quarterly dose to the child bone is reported
20 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Gaseous Effluents Release Point: Elevated (Main Offgas Stack)
Period: January 1, 2023 through December 31, 2023 Unit: Peach Bottom Nuclides Released Continuous Mode Batch Mode
Quarter Quarter Quarter Quarter
- 1. Fission Gases Unit Quarter 1 Quarter 2 Quarter 3 Quarter 4 1 2 3 4 Unidentified Ci <LLD 2.81E+00 2.07E+00 1.34E+00 <LLD <LLD <LLD <LLD Ar-41 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Kr-85m Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Kr-87 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Kr-88 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Xe-133m Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Xe-133 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Xe-135m Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Xe-135 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Xe-138 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Total For Period Ci <LLD 2.81E+00 2.07E+00 1.34E+00 <LLD <LLD <LLD <LLD
- 2. Iodines
I-131 Ci 2.31E-05 3.35E-05 3.09E-05 5.85E-05 <LLD <LLD <LLD <LLD I-132 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD I-133 Ci 6.14E-05 1.12E-04 9.73E-05 8.78E-05 <LLD <LLD <LLD <LLD I-135 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Total For Period Ci 8.44E-05 1.45E-04 1.28E-04 1.46E-04 <LLD <LLD <LLD <LLD
- 3. Particulates
Sr-89 Ci 2.36E-05 2.41E-05 2.78E-05 2.02E-05 <LLD <LLD <LLD <LLD Sr-90 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Cs-134 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Cs-137 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Ba-140 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD La-140 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Cr-51 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Mn-54 Ci <LLD <LLD <LLD 5.50E-06 <LLD <LLD <LLD <LLD Co-58 Ci <LLD <LLD 7.33E-07 1.44E-05 <LLD <LLD <LLD <LLD Co-60 Ci 1.65E-06 1.32E-06 1.41E-06 2.00E-05 <LLD <LLD <LLD <LLD Ag-110m Ci <LLD <LLD <LLD 1.31E-06 <LLD <LLD <LLD <LLD Ce-141 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Ce-144 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Zn-65 Ci <LLD <LLD <LLD 1.21E-05 <LLD <LLD <LLD <LLD Total For Period Ci 2.53E-05 2.54E-05 3.00E-05 7.35E-05 <LLD <LLD <LLD <LLD
- 4. Tritium
H-3 Ci 1.05E+00 2.15E+00 1.75E+00 1.21E+00 <LLD <LLD <LLD <LLD
- 5. Gross Alpha
Gross Alpha Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD
- 6. Carbon-14
C-14 Ci 9.18E+00 9.24E+00 9.16E+00 8.48E+00 <LLD <LLD <LLD <LLD
21 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Gaseous Effluents Release Point: Ground-Level (Units 2 and 3 Reactor Building Exhaust Vents and Abnormal Releases)
Period: January 1, 2023 through December 31, 2023 Unit: Peach Bottom Nuclides Released Continuous Mode Batch Mode
Quarter Quarter
- 1. Fission Gases Unit Quarter 1 Quarter 2 Quarter 3 Quarter 4 Quarter 1 2 3 Quarter 4 Kr-85 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Kr-85m Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Kr-87 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Kr-88 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Xe-133 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Xe-135 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Xe-135m Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Xe-138 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Ar-41 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Unidentified Ci 1.22E+01 2.63E+00 2.81E+00 3.71E+01 <LLD <LLD <LLD <LLD Total For Period Ci 1.22E+01 2.63E+00 2.81E+00 3.71E+01 <LLD <LLD <LLD <LLD
- 2. Iodines I-131 Ci <LLD <LLD 9.66E-06 8.98E-05 <LLD <LLD <LLD <LLD I-132 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD I-133 Ci <LLD 2.73E-05 4.94E-05 5.16E-05 <LLD <LLD <LLD <LLD I-135 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Total For Period Ci <LLD 2.73E-05 5.91E-05 1.41E-04 <LLD <LLD <LLD <LLD
- 3. Particulates
Sr-89 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Sr-90 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Cs-134 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Cs-137 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Ba-140 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD La-140 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Cr-51 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Mn-54 Ci <LLD <LLD <LLD 4.85E-06 <LLD <LLD <LLD <LLD Co-58 Ci <LLD <LLD 2.15E-05 2.69E-05 <LLD <LLD <LLD <LLD Co-60 Ci <LLD <LLD 1.12E-05 5.05E-05 <LLD <LLD <LLD <LLD Sb-124 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Ce-141 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Ce-144 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Ni-63 Ci <LLD <LLD 1.48E-05 5.92E-05 <LLD <LLD <LLD <LLD Zn-65 Ci <LLD <LLD <LLD 8.41E-06 <LLD <LLD <LLD <LLD Total For Period Ci <LLD <LLD 4.74E-05 1.50E-04 <LLD <LLD <LLD <LLD
- 5. Gross Alpha Gross Alpha Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD
- 6. Carbon-14
C-14 Ci 2.84E-01 2.86E-01 2.83E-01 2.63E-01 <LLD <LLD <LLD <LLD
22 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Liquid Effluents - Summation of All Releases Period: January 1, 2023 to December 31, 2023 Unit: Peach Bottom
Est. Total Error A. Fission & Activation Gases Units Quarter 1 Quarter 2 Quarter 3 Quarter 4 %
- 1. Total Release (not including tritium, gases 2.41E-04 7.73E-05 1.68E-03 4.16E-04 1.60E+01
& alpha) Ci
- 2. Average diluted concentration for the 3.72E - 13 1.16E - 13 2.42E - 12 6.33E - 13 Period Ci/ mL 3.ercent ofpplicab lim Tal By De* % 2.74E -03 7.87E -04 6.00E -02 1.34E -03 gan % 8.43E -04 2.42E -04 2.61E -03 2.42E -04
- ODCMS.8.B.2.andDCMS.8.B.2.bpage 8 ) defe thee
Est. Total Error B. Tritium %
- 1. Total Release Ci 7.64E+00 2.54E+00 7.15E+00 1.54E+00 6.40E+00
- 2. Average diluted concentration for the 1.18E-08 3.82E-09 1.03E-08 2.35E-09 Period µCi/ mL
- 3. Percent of applicable limit* % 1.18E-04 3.82E-05 1.03E-04 2.35E-05
- 10x 10CFR20 Limit of 1.00E-03 µCi/ mL; ODCMS 3.8.B.1.a
Est. Total Error C. Dissolved & Entrained Gases %
- 1. Total Release Ci 9.88E-05 1.20E-05 4.60E-05 <LLD 2.80E+01
- 2. Average diluted concentration for the 1.52E - 13 1.80E - 14 6.63E - 14 <LLD Period Ci/ mL 3.ercent of ODCM * % 7.60E -08 9.00E -09 3.32E -08 A
- OM S 3.8.B.b Limitoalloblgass.00E - 04 i/ mL
Est. Total D. Gross Alpha Activity Error %
- 1. Total Release Ci <LLD <LLD <LLD <LLD 2.30E+01
E. Volume of Waste Released (prior to 1.70E+08 1.71E+08 1.74E+08 1.73E+08 dilution) Liters
F. Volume of Dilution Water Used During 6.49E+11 6.66E+11 6.93E+11 6.57E+11 Period Liters
23 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Liquid Effluents Release Points - Liquid Radwaste and Groundwater Period: January 1, 2023 through December 31, 2023 Unit: Peach Bottom
Nuclides Released Continuous Mode Batch Mode
Unit Quarter 1 Quarter 2 Quarter 3 Quarter 4 Quarter 1 Quarter 2 Quarter 3 Quarter 4 Sr-89 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Sr-90 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Cs-134 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Cs-137 Ci <LLD <LLD <LLD <LLD <LLD 2.89E-07 3.35E-04 1.02E-05 I-133 Ci <LLD <LLD <LLD <LLD <LLD <LLD 3.10E-05 <LLD I-134 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Co-58 Ci <LLD <LLD <LLD <LLD <LLD <LLD 8.05E-05 2.50E-05 Co-60 Ci <LLD <LLD <LLD <LLD 8.13E-06 <LLD 3.02E-04 3.22E-05 Fe-59 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Zn-65 Ci <LLD <LLD <LLD <LLD <LLD <LLD 4.62E-05 2.78E-06 Mn-54 Ci <LLD <LLD <LLD <LLD <LLD <LLD 1.35E-04 7.99E-06 Cr-51 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Zr- 95 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Nb-95 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Mo-99 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Tc-99m Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Ba-140 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD La-140 Ci <LLD <LLD <LLD <LLD 1.81E-04 7.71E-05 <LLD <LLD Ag-110m Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD 2.35E-04 Fe-55 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Sb-122 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD 1.71E-05 Sb-124 Ci <LLD <LLD <LLD <LLD 4.48E-05 <LLD <LLD 9.17E-05 Sb-125 Ci <LLD <LLD <LLD <LLD 7.21E-06 <LLD 5.25E-04 <LLD Na-24 Ci <LLD <LLD <LLD <LLD <LLD <LLD 2.15E-04 <LLD Zn-69m Ci <LLD <LLD <LLD <LLD <LLD <LLD 5.76E-06 <LLD
H-3 Ci 2.39E+00 1.66E+00 9.59E-01 7.45E-01 5.25E+00 8.84E-01 6.19E+00 7.98E-01 P-32 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Total for Ci 2.39E+00 1.66E+00 9.59E-01 7.45E-01 5.25E+00 8.84E-01 6.19E+00 7.98E-01 Period
Xe-133 Ci <LLD <LLD <LLD <LLD 5.35E-05 <LLD <LLD <LLD Xe-135 Ci <LLD <LLD <LLD <LLD 4.53E-05 1.20E-05 4.60E-05 <LLD Xe-138 Ci <LLD <LLD <LLD <LLD <LLD <LLD <LLD <LLD Total for Period (ex- Ci <LLD <LLD <LLD <LLD 2.41E-04 7.73E-05 1.68E-03 4.20E- 04 tritium, gases and alpha)
24 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
ATTACHMENT 3: SOLID WASTE AND IRRADIATED FUEL SHIPMENTS
25 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Solid Waste Shipped
- 1. Type of Waste Units 2023 Est. error %
A: Spent Resin, Filters, Sludges, Ev aporator Bottoms, etc. m3 9.78E+01 3.76E+02 2.50E+01 B: Dry Compressible Waste, Contaminated Equipment, etc. m3 4.40E+02 6.22E-01 2.50E+01 C: Irradiated Components, Control Rods, etc. m3 0.00E+00 0.00E+00 N/A D: Other (Oil, SBLC) m3 4.18E+01 8.93E-03 2.50E+01
- 2. Estimate of Major Nuclide Composition (by type of waste)
- a. Spent-Resin, Filters, Sludges, Evaporator Bottoms, etc.
Waste Class A
Abundance %
Nuclide (1.0%) Activity (Ci)
Mn-54 3.62 1.36E+01 Fe-55 24.15 9.07E+01 Co-60 63.11 2.37E+02 Ni-63 1.16 4.36E+00 Zn-65 3.33 1.25E+01 Cs-137 3.28 1.23E+01
26 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
- b. Dry, Compressible Wast e, Cont aminated Equipment, etc.
Waste Class A
Abundance % $ EXQGDQFH
Nuclide (1.0%) Activity (Ci) 1XFOLGH* $FWLYLW\\&L
Mn-54 3.04 1.88E-02 Fe-55 19.41 1.20E-01 Co-60 70.54 4.35E-01 Ni-63 1.23 7.58E-03 Cs-137 4.58 2.83E-02
Waste Class C Abundance AEundance Nuclide % (1.0%) Activity (Ci) Nuclide (!1.0 ) Activity (Ci)
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
- c. Irradiated Component s, Control Rods, etc.
Abundance AEundance Nuclide % (1.0%) Activity (Ci) Nuclide (!1.0 ) Activity (Ci)
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
27 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
- d. Ot her: Oil, EHC, Sludge, etc.
Waste Class A
Abundance %
Nuclide (1.0%) Activity (Ci)
H-3 2.39 2.12E-04 Mn-54 2.58 2.28E-04 Fe-55 18.11 1.60E-03 Co-60 71.73 6.36E-03 Cs-137 4.54 4.03E-04
- 3. Solid Waste Disposition Number of shipments Mode of Transportation Destination Hittman Transport Energy Solutions LLC - Clive Disposal Site - Containerized Waste 19 Services Facility Hittman Transport 15 Services Energy Solutions Services (CVRF) Bear Creek Operations etmransport Energy Solutions - BWF 3 pees Clive Disposal Site - Bulk Waste Facility
+LWWPDQ7UDQVSRUW
6HUYLFHV (QHUJ\\6ROXWLRQV6HUYLFHV*5)*DOODKHU5RDG2SHUDWLRQV
Hittman Transport Energy Solutions - Memphis
Services 1790 Dock Street
Hittman Transport Erwin Resin Solutions
Services 151 T.C. Runnion Road
Irradiated Fuel Shipments No shipment of irradiated fuel was made during the reporting period of 2023.
Changes to Process Control Program (PCP)
There were no changes made to RW -AA- 100 "Process Control Program for Radioactive Waste" during the 2023 reporting period.
28 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
ATTACHMENT 4: RADIOLOGICAL IMPACT ON MAN
29 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC Radiological Impact on Man
% of Estimated Applicable Effluent Applicable Organ Dose Limit Limit Unit Noble Gas Gamma - Air Dose 2.96E-02 1.48E-01 2.00E+01 mrad Noble Gas Beta - Air Dose 2.02E-02 5.05E-02 4.00E+01 mrad Noble Gas Total Body 2.87E-02 2.87E-01 1.00E+01 mrem (gamma)
Noble Gas Skin (Beta) 3.74E-02 1.25E-01 3.00E+01 mrem Gaseous Iodine, Particulate, Bone 8.13E-02 2.71E-01 3.00E+01 mrem Carbon-14 & Tritium Gaseous Iodine, Particulate & Thyroid 2.18E-03 7.27E-03 3.00E+01 mrem Tritium Liquid Total Body 1.93E-03 3.22E-02 6.00E+00 mrem (gamma)
Liquid GI-LLI 3.76E-04 1.88E-03 2.00E+01 mrem Direct Radiation Total Body 0 0.00E+00 2.50E+01 mrem
40 CFR 190 Doses 40 CFR 190 Applicable % of Organ Estimated Applicable Dose Limit Limit Unit Total Body 3.06E-02 1.23E-01 2.50E+01 mrem Thyroid 2.18E-03 2.91E-03 7.50E+01 mrem Other Organ 8.17E-02 3.27E-01 2.50E+01 mrem ODCM 3.8.D.1.d and e.
Total Body 3.06E-02 1.02E+00 3.00E+00 mrem Other Organ 8.17E-02 2.72E+00 3.00E+00 mrem Thyroid 3.18E-02 5.78E-02 5.50E+01 mrem
30 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
ATTACHMENT 5: METEOROLOGICAL DATA
31 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: January - March 2023 Stability Class - Extremely Unstable - 150Ft-33Ft Delta- T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 0 2 0 0 0 0 2
NNE 0 1 0 0 0 0 1
NE 0 1 0 0 0 0 1
ENE 6 0 0 0 0 0 6
E 2 9 0 0 0 0 11
ESE 1 6 1 0 0 0 8
SE 0 4 3 0 0 0 7
SSE 0 0 3 1 0 0 4
S 0 0 10 0 0 0 10
SSW 0 1 0 0 0 0 1
SW 0 2 3 0 0 0 5
WSW 0 1 3 0 0 0 4
W 0 0 1 0 0 0 1
WNW 0 0 4 3 0 0 7
NW 0 1 1 0 0 0 2
NNW 0 2 1 0 0 0 3
Variable 0 0 0 0 0 0 0
Total 9 30 30 4 0 0 73
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
32 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: January - March 2023 Stability Class - Moderately Unstable - 150Ft- 33Ft Delta- T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 0 2 1 0 0 0 3
NNE 1 2 0 0 0 0 3
NE 2 1 0 0 0 0 3
ENE 5 1 0 0 0 0 6
E 4 5 0 0 0 0 9
ESE 0 6 0 0 0 0 6
SE 0 4 3 0 0 0 7
SSE 0 2 7 1 0 0 10
S 0 4 3 0 0 0 7
SSW 1 2 2 0 0 0 5
SW 0 0 8 1 0 0 9
WSW 0 4 3 2 0 0 9
W 0 3 7 0 0 0 10
WNW 0 2 13 12 5 0 32
NW 0 2 9 18 1 0 30
NNW 0 6 23 15 2 0 46
Variable 0 0 0 0 0 0 0
Total 13 46 79 49 8 0 195
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
33 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: January - March 2023 Stability Class - Slightly Unstable - 150Ft-33Ft Delta-T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 3 4 0 0 0 0 7
NNE 2 1 0 0 0 0 3
NE 1 2 0 0 0 0 3
ENE 5 0 0 0 0 0 5
E 1 2 1 0 0 0 4
ESE 1 2 1 0 0 0 4
SE 0 1 1 0 0 0 2
SSE 0 2 3 0 0 0 5
S 0 3 5 0 0 0 8
SSW 0 0 2 0 0 0 2
SW 0 0 1 0 0 0 1
WSW 0 2 2 0 0 0 4
W 0 0 8 0 0 0 8
WNW 0 7 9 0 2 0 18
NW 0 3 9 3 0 0 15
NNW 0 7 17 8 0 0 32
Variable 0 0 0 0 0 0 0
Total 13 36 59 11 2 0 121
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
34 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC Peach Bottom Nuclear Station
Period of Record: January - March 2023 Stability Class - Neutral - 150Ft-33Ft Delta-T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 10 15 2 0 0 0 27
NNE 12 13 1 0 0 0 26
NE 20 3 0 0 0 0 23
ENE 24 3 0 0 0 0 27
E 25 25 2 0 0 0 52
ESE 14 25 7 0 0 0 46
SE 10 33 6 1 0 0 50
SSE 5 38 16 1 0 0 60
S 7 29 10 3 0 0 49
SSW 3 11 13 1 0 0 28
SW 5 16 13 0 0 0 34
WSW 5 18 9 1 0 0 33
W 6 22 36 10 0 0 74
WNW 7 24 65 13 1 0 110
NW 4 30 76 43 0 0 153
NNW 3 43 80 53 3 0 182
Variable 0 0 0 0 0 0 0
Total 160 348 336 126 4 0 974
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
35 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: January - March 2023 Stability Class - Slightly Stable - 150Ft-33Ft Delta-T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 7 4 2 0 0 0 13
NNE 7 1 0 0 0 0 8
NE 9 3 0 0 0 0 12
ENE 14 1 0 0 0 0 15
E 32 1 0 0 0 0 33
ESE 40 8 0 0 0 0 48
SE 38 9 0 0 0 0 47
SSE 17 14 2 0 0 0 33
S 20 21 3 0 0 0 44
SSW 9 14 1 0 0 0 24
SW 8 9 1 0 0 0 18
WSW 14 42 5 0 0 0 61
W 16 45 12 0 0 0 73
WNW 12 21 9 0 0 0 42
NW 13 19 4 0 0 0 36
NNW 8 21 3 0 0 0 32
Variable 0 0 0 0 0 0 0
Total 264 233 42 0 0 0 539
Hours of calm in this stability class: 5 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurement s in all stability classes: 0
36 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: January - March 2023 Stability Class - Moderately Stable - 150Ft-33Ft Delta-T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 2 0 0 0 0 0 2
NNE 7 0 0 0 0 0 7
NE 6 0 0 0 0 0 6
ENE 9 0 0 0 0 0 9
E 10 0 0 0 0 0 10
ESE 16 1 0 0 0 0 17
SE 14 1 0 0 0 0 15
SSE 7 0 0 0 0 0 7
S 8 0 0 0 0 0 8
SSW 2 0 0 0 0 0 2
SW 8 1 0 0 0 0 9
WSW 10 11 1 0 0 0 22
W 13 7 0 0 0 0 20
WNW 10 2 0 0 0 0 12
NW 11 2 0 0 0 0 13
NNW 4 2 0 0 0 0 6
Variable 0 0 0 0 0 0 0
Total 137 27 1 0 0 0 165
Hours of calm in this stability class: 4 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
37 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: January - March 2023 Stability Class - Extremely Stable - 150Ft-33Ft Delta- T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 10 0 0 0 0 0 10
NNE 3 0 0 0 0 0 3
NE 4 0 0 0 0 0 4
ENE 5 0 0 0 0 0 5
E 12 0 0 0 0 0 12
ESE 6 0 0 0 0 0 6
SE 3 0 0 0 0 0 3
SSE 2 0 0 0 0 0 2
S 1 0 0 0 0 0 1
SSW 1 0 0 0 0 0 1
SW 3 0 0 0 0 0 3
WSW 8 1 0 0 0 0 9
W 6 1 0 0 0 0 7
WNW 6 0 0 0 0 0 6
NW 7 0 0 0 0 0 7
NNW 5 0 0 0 0 0 5
Variable 0 0 0 0 0 0 0
Total 82 2 0 0 0 0 84
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
38 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC Peach Bottom Nuclear Station
Period of Record: January - March 2023 Stability Class - Extremely Unstable - 316Ft-33Ft Delta- T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 0 0 0 0 0 0 0
NNE 0 0 0 0 0 0 0
NE 0 0 0 0 0 0 0
ENE 0 0 0 0 0 0 0
E 0 0 0 0 0 0 0
ESE 0 0 0 0 0 0 0
SE 0 0 1 0 0 0 1
SSE 0 0 0 0 0 0 0
S 0 0 0 0 0 0 0
SSW 0 0 0 0 0 0 0
SW 0 0 0 0 0 0 0
WSW 0 0 0 0 0 0 0
W 0 0 0 0 0 0 0
WNW 0 0 0 0 0 0 0
NW 0 0 0 0 0 0 0
NNW 0 0 0 0 0 0 0
Variable 0 0 0 0 0 0 0
Total 0 0 1 0 0 0 1
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
39 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: January - March 2023 Stability Class - Moderately Unstable - 316Ft- 33Ft Delta- T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 0 0 0 0 0 0 0
NNE 0 1 0 0 0 0 1
NE 0 0 0 0 0 0 0
ENE 0 0 0 0 0 0 0
E 0 0 1 0 0 0 1
ESE 0 2 1 1 0 0 4
SE 0 0 0 3 0 0 3
SSE 0 0 0 0 0 0 0
S 0 0 0 0 0 0 0
SSW 0 0 0 0 0 0 0
SW 0 0 0 0 0 0 0
WSW 0 0 0 0 0 0 0
W 0 0 0 0 0 0 0
WNW 0 0 0 0 0 0 0
NW 0 0 0 0 0 0 0
NNW 0 0 0 0 0 0 0
Variable 0 0 0 0 0 0 0
Total 0 3 2 4 0 0 9
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
40 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: January - March 2023 Stability Class - Slightly Unstable - 316Ft-33Ft Delta-T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 0 0 0 0 0 0 0
NNE 0 0 0 0 0 0 0
NE 0 0 0 0 0 0 0
ENE 0 0 1 0 0 0 1
E 0 3 1 0 0 0 4
ESE 0 0 0 0 0 0 0
SE 0 0 2 0 0 0 2
SSE 0 0 0 2 1 0 3
S 0 1 1 6 0 0 8
SSW 0 0 0 0 0 0 0
SW 0 0 0 0 0 0 0
WSW 0 0 1 1 0 0 2
W 0 0 0 3 0 0 3
WNW 0 1 0 2 8 2 13
NW 0 0 0 1 0 0 1
NNW 0 0 0 0 0 0 0
Variable 0 0 0 0 0 0 0
Total 0 5 6 15 9 2 37
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
41 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: January - March 2023 Stability Class - Neutral - 316Ft-33Ft Delta-T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 5 9 18 4 0 0 36
NNE 4 7 11 0 0 0 22
NE 2 15 10 0 0 0 27
ENE 1 6 5 0 0 0 12
E 6 18 15 10 5 0 54
ESE 2 5 34 14 4 7 66
SE 0 11 33 14 0 1 59
SSE 0 5 34 27 5 0 71
S 3 9 37 13 4 1 67
SSW 0 3 9 10 5 0 27
SW 2 6 19 24 1 0 52
WSW 2 8 14 11 3 2 40
W 2 6 17 47 29 3 104
WNW 1 7 22 68 61 42 201
NW 6 11 40 82 56 27 222
NNW 1 13 33 61 46 7 161
Variable 0 0 0 0 0 0 0
Total 37 139 351 385 219 90 1221
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
42 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: January - March 2023 Stability Class - Slightly Stable - 316Ft-33Ft Delta-T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 0 11 13 5 0 0 29
NNE 0 6 2 4 0 0 12
NE 1 5 3 1 0 0 10
ENE 5 4 1 0 0 0 10
E 2 8 2 1 0 0 13
ESE 2 12 17 0 0 0 31
SE 2 16 22 2 1 0 43
SSE 1 22 29 12 0 0 64
S 2 18 42 17 4 2 85
SSW 2 10 23 14 1 0 50
SW 3 15 20 14 3 0 55
WSW 1 4 13 19 2 0 39
W 3 4 16 31 10 0 64
WNW 2 4 16 30 14 0 66
NW 1 7 14 27 8 0 57
NNW 3 14 20 11 3 0 51
Variable 0 0 0 0 0 0 0
Total 30 160 253 188 46 2 679
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
43 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: January - March 2023 Stability Class - Moderately Stable - 316Ft- 33Ft Delta- T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 2 2 3 0 0 0 7
NNE 3 0 3 0 0 0 6
NE 1 0 0 0 0 0 1
ENE 0 1 0 0 0 0 1
E 1 1 1 0 0 0 3
ESE 1 5 2 1 0 0 9
SE 4 4 4 0 0 0 12
SSE 0 5 9 1 0 0 15
S 2 12 7 2 0 0 23
SSW 0 5 6 0 1 0 12
SW 1 4 10 5 1 0 21
WSW 0 3 6 1 1 0 11
W 1 0 5 6 0 1 13
WNW 1 0 4 2 0 0 7
NW 1 1 6 1 1 0 10
NNW 1 1 3 0 0 0 5
Variable 0 0 0 0 0 0 0
Total 19 44 69 19 4 1 156
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
44 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: January - March 2023 Stability Class - Extremely Stable - 316Ft-33Ft Delta-T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 0 0 0 0 0 0 0
NNE 0 0 0 0 0 0 0
NE 0 1 0 0 0 0 1
ENE 0 1 1 0 0 0 2
E 0 4 0 0 0 0 4
ESE 2 1 0 0 0 0 3
SE 0 3 1 0 0 0 4
SSE 1 2 2 0 0 0 5
S 0 0 3 0 0 0 3
SSW 0 0 1 0 0 0 1
SW 0 5 4 3 0 0 12
WSW 2 1 2 3 0 0 8
W 0 0 2 2 0 0 4
WNW 0 2 1 1 0 0 4
NW 0 4 0 0 0 0 4
NNW 0 2 0 0 0 0 2
Variable 0 0 0 0 0 0 0
Total 5 26 17 9 0 0 57
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
45 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC Peach Bottom Nuclear Station
Period of Record: April - June 2023 Stability Class - Extremely Unstable - 150Ft-33Ft Delta- T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 13 44 6 0 0 0 63
NNE 20 22 1 0 0 0 43
NE 13 8 0 0 0 0 21
ENE 28 4 0 0 0 0 32
E 26 10 0 0 0 0 36
ESE 11 25 2 0 0 0 38
SE 1 19 3 0 0 0 23
SSE 0 3 7 1 0 0 11
S 0 0 6 4 0 0 10
SSW 1 0 2 0 0 0 3
SW 1 3 2 1 0 0 7
WSW 0 1 7 2 0 0 10
W 0 2 8 1 0 0 11
WNW 1 0 3 0 0 0 4
NW 1 3 5 0 0 0 9
NNW 7 26 31 2 0 0 66
Variable 0 0 0 0 0 0 0
Total 123 170 83 11 0 0 387
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability cl asses: 4
46 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: April - June 2023 Stability Class - Moderately Unstable - 150Ft- 33Ft Delta- T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 8 9 2 0 0 0 19
NNE 12 5 0 0 0 0 17
NE 6 5 0 0 0 0 11
ENE 10 0 0 0 0 0 10
E 3 2 0 0 0 0 5
ESE 1 3 0 0 0 0 4
SE 2 5 2 0 0 0 9
SSE 0 8 9 2 0 0 19
S 0 4 6 2 0 0 12
SSW 0 1 1 1 0 0 3
SW 0 1 2 1 0 0 4
WSW 0 3 11 0 0 0 14
W 1 3 9 2 0 0 15
WNW 0 6 11 0 0 0 17
NW 0 11 7 0 0 0 18
NNW 2 16 21 3 0 0 42
Variable 0 0 0 0 0 0 0
Total 45 82 81 11 0 0 219
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 4
47 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC Peach Bottom Nuclear Station
Period of Record: April - June 2023 Stability Class - Slightly Unstable - 150Ft- 33Ft Delta- T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 3 0 1 0 0 0 4
NNE 7 4 0 0 0 0 11
NE 3 2 0 0 0 0 5
ENE 7 1 0 0 0 0 8
E 4 2 0 0 0 0 6
ESE 2 1 0 0 0 0 3
SE 0 1 0 0 0 0 1
SSE 0 1 4 1 0 0 6
S 0 1 2 1 0 0 4
SSW 1 0 1 1 0 0 3
SW 1 0 2 1 0 0 4
WSW 0 1 6 0 0 0 7
W 0 4 4 1 0 0 9
WNW 0 5 0 0 0 0 5
NW 0 3 8 0 0 0 11
NNW 1 6 4 1 0 0 12
Variable 0 0 0 0 0 0 0
Total 29 32 32 6 0 0 99
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 4
48 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: April - June 2023 Stability Class - Neutral - 150Ft-33Ft Delta-T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 29 17 14 0 0 0 60
NNE 22 13 0 0 0 0 35
NE 30 1 0 0 0 0 31
ENE 27 1 0 0 0 0 28
E 21 4 0 0 0 0 25
ESE 13 2 0 0 0 0 15
SE 10 27 10 0 0 0 47
SSE 7 30 21 1 0 0 59
S 9 19 9 0 0 0 37
SSW 6 2 2 4 0 0 14
SW 3 12 9 3 0 0 27
WSW 2 17 13 0 0 0 32
W 3 14 11 5 0 0 33
WNW 3 29 14 4 1 0 51
NW 11 28 14 6 0 0 59
NNW 9 20 20 3 0 0 52
Variable 0 0 0 0 0 0 0
Total 205 236 137 26 1 0 605
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 4
49 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: April - June 2023 Stability Class - Slightly Stable - 150Ft-33Ft Delta-T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 20 11 1 0 0 0 32
NNE 23 9 0 0 0 0 32
NE 22 0 0 0 0 0 22
ENE 18 0 0 0 0 0 18
E 23 1 0 0 0 0 24
ESE 20 7 0 0 0 0 27
SE 24 13 2 0 0 0 39
SSE 23 26 0 0 0 0 49
S 28 13 0 0 0 0 41
SSW 15 10 0 0 0 0 25
SW 14 8 1 0 0 0 23
WSW 21 37 2 0 0 0 60
W 14 30 1 0 0 0 45
WNW 22 37 1 0 0 0 60
NW 11 30 6 0 0 0 47
NNW 20 11 0 0 0 0 31
Variable 0 0 0 0 0 0 0
Total 318 243 14 0 0 0 575
Hours of calm in this stability class: 2 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurement s in all stability classes: 4
50 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: April - June 2023 Stability Class - Moderately Stable - 150Ft- 33Ft Delta- T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 4 0 0 0 0 0 4
NNE 5 0 0 0 0 0 5
NE 6 0 0 0 0 0 6
ENE 5 0 0 0 0 0 5
E 9 0 0 0 0 0 9
ESE 8 0 0 0 0 0 8
SE 6 0 0 0 0 0 6
SSE 4 0 0 0 0 0 4
S 3 0 0 0 0 0 3
SSW 13 1 0 0 0 0 14
SW 24 2 0 0 0 0 26
WSW 19 27 1 0 0 0 47
W 19 13 0 0 0 0 32
WNW 17 4 0 0 0 0 21
NW 12 0 0 0 0 0 12
NNW 11 2 0 0 0 0 13
Variable 0 0 0 0 0 0 0
Total 165 49 1 0 0 0 215
Hours of calm in this stability class: 1 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 4
51 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: April - June 2023 Stability Class - Extremely Stable - 150Ft-33Ft Delta-T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 1 0 0 0 0 0 1
NNE 0 0 0 0 0 0 0
NE 0 0 0 0 0 0 0
ENE 1 0 0 0 0 0 1
E 1 0 0 0 0 0 1
ESE 0 0 0 0 0 0 0
SE 3 0 0 0 0 0 3
SSE 1 0 0 0 0 0 1
S 1 0 0 0 0 0 1
SSW 2 0 0 0 0 0 2
SW 10 10 0 0 0 0 20
WSW 13 10 0 0 0 0 23
W 5 9 0 0 0 0 14
WNW 1 1 0 0 0 0 2
NW 2 1 0 0 0 0 3
NNW 2 0 0 0 0 0 2
Variable 0 0 0 0 0 0 0
Total 43 31 0 0 0 0 74
Hours of calm in this stability class: 3 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 4
52 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: April - June 2023 Stability Class - Extremely Unstable - 316Ft-33Ft Delta- T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 0 1 5 1 0 0 7
NNE 0 0 2 0 0 0 2
NE 0 3 2 1 0 0 6
ENE 0 0 6 2 0 0 8
E 0 10 5 3 0 0 18
ESE 0 1 12 5 0 0 18
SE 0 0 0 1 0 0 1
SSE 0 0 0 0 0 0 0
S 0 0 0 0 0 0 0
SSW 0 0 0 0 0 0 0
SW 0 0 0 0 0 0 0
WSW 0 0 0 0 0 0 0
W 0 0 0 0 0 0 0
WNW 0 0 0 0 0 0 0
NW 0 0 0 0 0 0 0
NNW 0 0 0 0 0 0 0
Variable 0 0 0 0 0 0 0
Total 0 15 32 13 0 0 60
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 4
53 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: April - June 2023 Stability Class - Moderately Unstable - 316Ft- 33Ft Delta- T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 0 3 4 1 0 0 8
NNE 0 1 0 1 0 0 2
NE 1 0 2 0 0 0 3
ENE 0 4 3 0 0 0 7
E 0 7 1 1 0 0 9
ESE 0 4 8 0 0 0 12
SE 0 0 2 3 0 0 5
SSE 0 0 0 0 0 0 0
S 0 0 0 0 0 0 0
SSW 0 0 0 0 0 0 0
SW 0 0 0 0 0 0 0
WSW 0 0 0 0 0 0 0
W 0 0 0 0 0 0 0
WNW 0 0 0 0 0 0 0
NW 0 0 1 0 0 0 1
NNW 0 0 2 5 0 0 7
Variable 0 0 0 0 0 0 0
Total 1 19 23 11 0 0 54
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 4
54 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: April - June 2023 Stability Class - Slightly Unstable - 316Ft- 33Ft Delta- T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 0 6 5 0 0 0 11
NNE 0 6 1 0 0 0 7
NE 0 6 0 0 0 0 6
ENE 2 9 2 0 0 0 13
E 0 7 3 3 0 0 13
ESE 0 4 2 2 0 0 8
SE 0 0 4 2 1 0 7
SSE 0 0 5 0 1 0 6
S 0 0 1 6 1 0 8
SSW 0 0 0 0 0 0 0
SW 0 0 1 1 0 0 2
WSW 0 1 1 6 2 0 10
W 0 0 0 7 1 0 8
WNW 0 0 0 2 0 0 2
NW 0 1 5 7 4 0 17
NNW 0 7 26 4 0 0 37
Variable 0 0 0 0 0 0 0
Total 2 47 56 40 10 0 155
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 4
55 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: April - June 2023 Stability Class - Neutral - 316Ft-33Ft Delta-T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 4 21 5 15 5 0 50
NNE 9 18 13 5 0 0 45
NE 9 8 14 2 0 0 33
ENE 11 23 18 13 3 0 68
E 1 27 31 38 2 0 99
ESE 3 10 23 17 2 0 55
SE 2 14 28 20 0 0 64
SSE 3 8 30 32 4 0 77
S 4 5 22 19 4 0 54
SSW 1 4 6 4 3 3 21
SW 0 4 6 15 9 0 34
WSW 0 2 15 27 7 0 51
W 1 4 16 19 12 3 55
WNW 0 7 22 30 6 6 71
NW 1 13 37 42 11 5 109
NNW 1 30 33 18 2 0 84
Variable 0 0 0 0 0 0 0
Total 50 198 319 316 70 17 970
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 4
56 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: April - June 2023 Stability Class - Slightly Stable - 316Ft-33Ft Delta-T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 2 2 11 8 0 0 23
NNE 3 9 8 6 1 0 27
NE 4 16 13 9 0 0 42
ENE 6 7 8 2 0 0 23
E 6 9 17 6 0 0 38
ESE 1 13 20 1 0 0 35
SE 5 21 23 5 0 0 54
SSE 3 12 30 6 0 0 51
S 5 14 24 9 1 0 53
SSW 2 8 13 3 0 0 26
SW 3 12 13 6 1 0 35
WSW 2 9 15 23 3 0 52
W 0 10 14 20 2 1 47
WNW 0 7 14 28 7 1 57
NW 5 9 18 38 5 0 75
NNW 3 8 27 8 0 0 46
Variable 0 0 0 0 0 0 0
Total 50 166 268 178 20 2 684
Hours of calm in this stability class: 1 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 4
57 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: April - June 2023 Stability Class - Moderately Stable - 316Ft- 33Ft Delta- T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 2 3 1 2 1 0 9
NNE 1 6 2 1 0 0 10
NE 5 4 0 0 1 0 10
ENE 2 4 0 0 0 0 6
E 2 3 1 0 0 0 6
ESE 3 2 1 0 0 0 6
SE 5 7 2 0 0 0 14
SSE 3 8 1 0 0 0 12
S 1 5 3 0 0 0 9
SSW 2 8 8 1 0 0 19
SW 2 5 6 1 0 0 14
WSW 2 4 1 1 0 0 8
W 0 4 3 11 3 0 21
WNW 1 3 3 14 1 0 22
NW 0 5 5 10 0 0 20
NNW 0 6 4 0 2 0 12
Variable 0 0 0 0 0 0 0
Total 31 77 41 41 8 0 198
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 4
58 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: April - June 2023 Stability Class - Extremely Stable - 316Ft-33Ft Delta-T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 0 2 0 0 0 0 2
NNE 0 1 0 0 0 0 1
NE 1 1 0 0 0 0 2
ENE 0 0 0 0 0 0 0
E 0 0 0 0 0 0 0
ESE 0 0 0 0 0 0 0
SE 1 0 0 0 0 0 1
SSE 1 1 1 0 0 0 3
S 2 0 0 0 0 0 2
SSW 0 5 0 0 0 0 5
SW 0 4 6 0 0 0 10
WSW 2 0 4 2 0 0 8
W 2 1 0 2 1 0 6
WNW 1 0 1 2 0 0 4
NW 0 2 4 2 0 0 8
NNW 0 3 3 0 0 0 6
Variable 0 0 0 0 0 0 0
Total 10 20 19 8 1 0 58
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurement s in all stability classes: 4
59 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: July - September 2023 Stability Class - Extremely Unstable - 150Ft-33Ft Delta- T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 7 15 12 0 0 0 34
NNE 14 11 2 0 0 0 27
NE 18 1 0 0 0 0 19
ENE 15 0 0 0 0 0 15
E 10 0 0 0 0 0 10
ESE 3 4 0 0 0 0 7
SE 6 13 1 0 0 0 20
SSE 3 20 12 0 0 0 35
S 2 11 14 1 0 0 28
SSW 2 3 1 0 0 0 6
SW 1 1 2 0 0 0 4
WSW 0 0 1 0 0 0 1
W 0 3 0 0 0 0 3
WNW 0 5 1 0 0 0 6
NW 1 0 1 0 0 0 2
NNW 5 13 14 0 0 0 32
Variable 0 0 0 0 0 0 0
Total 87 100 61 1 0 0 249
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 15
60 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: July - September 2023 Stability Class - Moderately Unstable - 150Ft- 33Ft Delta- T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 5 12 5 0 0 0 22
NNE 20 3 0 0 0 0 23
NE 17 0 0 0 0 0 17
ENE 7 1 0 0 0 0 8
E 3 0 0 0 0 0 3
ESE 1 1 0 0 0 0 2
SE 2 4 1 0 0 0 7
SSE 3 16 19 0 0 0 38
S 0 15 4 0 0 0 19
SSW 0 10 0 0 0 0 10
SW 0 7 4 0 0 0 11
WSW 2 3 1 0 0 0 6
W 4 7 3 0 0 0 14
WNW 3 7 9 0 0 0 19
NW 0 7 8 0 0 0 15
NNW 2 33 20 0 0 0 55
Variable 0 0 0 0 0 0 0
Total 69 126 74 0 0 0 269
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 15
61 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: July - September 2023 Stability Class - Slightly Unstable - 150Ft- 33Ft Delta- T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 5 4 2 0 0 0 11
NNE 7 1 2 0 0 0 10
NE 4 0 0 0 0 0 4
ENE 5 0 0 0 0 0 5
E 3 0 0 0 0 0 3
ESE 1 0 0 0 0 0 1
SE 0 2 0 0 0 0 2
SSE 0 8 5 0 0 0 13
S 0 2 1 0 0 0 3
SSW 0 3 0 0 0 0 3
SW 2 7 2 0 0 0 11
WSW 1 3 0 0 0 0 4
W 0 7 1 0 0 0 8
WNW 0 8 3 0 0 0 11
NW 3 6 1 0 0 0 10
NNW 1 19 6 0 0 0 26
Variable 0 0 0 0 0 0 0
Total 32 70 23 0 0 0 125
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 15
62 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: July - September 2023 Stability Class - Neutral - 150Ft-33Ft Delta-T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 21 38 7 0 0 0 66
NNE 43 32 2 0 0 0 77
NE 14 11 0 0 0 0 25
ENE 11 0 0 0 0 0 11
E 7 0 0 0 0 0 7
ESE 4 2 0 0 0 0 6
SE 9 26 3 0 0 0 38
SSE 11 64 8 0 0 0 83
S 14 34 2 0 0 0 50
SSW 12 17 5 0 0 0 34
SW 8 12 7 0 0 0 27
WSW 10 14 0 0 0 0 24
W 13 17 2 0 0 0 32
WNW 6 13 8 0 0 0 27
NW 8 28 6 0 0 0 42
NNW 11 49 26 0 0 0 86
Variable 0 0 0 0 0 0 0
Total 202 357 76 0 0 0 635
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 15
63 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: July - September 2023 Stability Class - Slightly Stable - 150Ft- 33Ft Delta-T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 20 9 2 0 0 0 31
NNE 18 5 0 0 0 0 23
NE 15 0 0 0 0 0 15
ENE 5 0 0 0 0 0 5
E 3 0 0 0 0 0 3
ESE 15 0 0 0 0 0 15
SE 19 2 0 0 0 0 21
SSE 35 35 2 0 0 0 72
S 24 24 0 0 0 0 48
SSW 20 10 0 0 0 0 30
SW 16 9 0 0 0 0 25
WSW 23 23 1 0 0 0 47
W 30 26 1 0 0 0 57
WNW 29 30 3 0 0 0 62
NW 20 38 2 0 0 0 60
NNW 22 18 4 0 0 0 44
Variable 0 0 0 0 0 0 0
Total 314 229 15 0 0 0 558
Hours of calm in this stability class: 1 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 15
64 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: July - September 2023 Stability Class - Moderately Stable - 150Ft- 33Ft Delta- T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 0 0 0 0 0 0 0
NNE 0 0 0 0 0 0 0
NE 0 0 0 0 0 0 0
ENE 0 0 0 0 0 0 0
E 1 0 0 0 0 0 1
ESE 1 0 0 0 0 0 1
SE 0 0 0 0 0 0 0
SSE 0 0 0 0 0 0 0
S 3 1 0 0 0 0 4
SSW 13 2 0 0 0 0 15
SW 26 2 0 0 0 0 28
WSW 38 34 0 0 0 0 72
W 34 23 0 0 0 0 57
WNW 15 11 0 0 0 0 26
NW 12 7 0 0 0 0 19
NNW 2 2 0 0 0 0 4
Variable 0 0 0 0 0 0 0
Total 145 82 0 0 0 0 227
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 15
65 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: July - September 2023 Stability Class - Extremely Stable - 150Ft-33Ft Delta-T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 0 0 0 0 0 0 0
NNE 0 0 0 0 0 0 0
NE 0 0 0 0 0 0 0
ENE 0 0 0 0 0 0 0
E 0 0 0 0 0 0 0
ESE 0 0 0 0 0 0 0
SE 0 0 0 0 0 0 0
SSE 0 0 0 0 0 0 0
S 1 0 0 0 0 0 1
SSW 1 0 0 0 0 0 1
SW 30 23 0 0 0 0 53
WSW 43 20 0 0 0 0 63
W 6 2 0 0 0 0 8
WNW 1 1 0 0 0 0 2
NW 0 0 0 0 0 0 0
NNW 0 0 0 0 0 0 0
Variable 0 0 0 0 0 0 0
Total 82 46 0 0 0 0 128
Hours of calm in this stability class: 1 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 15
66 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: July - September 2023 Stability Class - Extremely Unstable - 316Ft-33Ft Delta- T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 0 0 0 0 0 0 0
NNE 1 0 0 0 0 0 1
NE 0 1 0 0 0 0 1
ENE 0 3 4 1 0 0 8
E 0 4 2 1 0 0 7
ESE 0 2 3 0 0 0 5
SE 0 0 0 0 0 0 0
SSE 0 0 0 0 0 0 0
S 0 0 0 1 0 0 1
SSW 0 0 0 0 0 0 0
SW 0 0 0 0 0 0 0
WSW 0 0 0 0 0 0 0
W 0 0 0 0 0 0 0
WNW 0 0 0 0 0 0 0
NW 0 0 0 0 0 0 0
NNW 0 0 0 0 0 0 0
Variable 0 0 0 0 0 0 0
Total 1 10 9 3 0 0 23
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 15
67 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: July - September 2023 Stability Class - Moderately Unstable - 316Ft- 33Ft Delta- T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 0 1 0 0 1 0 2
NNE 0 2 0 0 0 0 2
NE 0 1 2 0 0 0 3
ENE 1 4 1 1 0 0 7
E 0 2 1 0 0 0 3
ESE 0 1 0 0 0 0 1
SE 0 0 2 0 0 0 2
SSE 0 0 0 0 0 0 0
S 0 0 0 1 0 0 1
SSW 0 0 0 0 0 0 0
SW 0 0 0 0 0 0 0
WSW 0 0 0 0 0 0 0
W 0 1 0 0 0 0 1
WNW 0 0 0 0 0 0 0
NW 0 0 0 0 0 0 0
NNW 0 0 0 0 0 0 0
Variable 0 0 0 0 0 0 0
Total 1 12 6 2 1 0 22
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 15
68 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: July - September 2023 Stability Class - Slightly Unstable - 316Ft- 33Ft Delta- T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 0 4 7 6 2 0 19
NNE 0 3 1 1 0 0 5
NE 2 5 0 0 0 0 7
ENE 2 3 0 1 0 0 6
E 1 4 0 0 0 0 5
ESE 0 6 1 0 0 0 7
SE 0 1 3 1 0 0 5
SSE 0 0 2 2 0 0 4
S 1 1 7 3 0 0 12
SSW 0 2 0 1 0 0 3
SW 0 0 0 1 0 0 1
WSW 0 0 0 0 0 0 0
W 0 0 2 0 0 0 2
WNW 0 0 0 0 0 0 0
NW 0 0 2 0 0 0 2
NNW 0 0 1 0 0 0 1
Variable 0 0 0 0 0 0 0
Total 6 29 26 16 2 0 79
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 15
69 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: July - September 2023 Stability Class - Neutral - 316Ft-33Ft Delta-T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 11 24 47 18 1 0 101
NNE 13 9 25 7 1 0 55
NE 14 15 22 16 7 11 85
ENE 19 20 2 3 0 0 44
E 6 13 2 0 0 0 21
ESE 4 13 15 5 0 0 37
SE 3 17 32 13 0 0 65
SSE 3 15 54 18 0 0 90
S 2 15 44 15 1 0 77
SSW 2 12 21 11 0 0 46
SW 3 13 17 8 1 0 42
WSW 0 12 16 0 0 0 28
W 3 15 30 11 7 0 66
WNW 3 18 21 17 1 0 60
NW 3 25 61 22 1 0 112
NNW 6 27 51 12 1 0 97
Variable 0 0 0 0 0 0 0
Total 95 263 460 176 21 11 1026
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 8 Hours of missing stability measurements in all stability classes: 15
70 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: July - September 2023 Stability Class - Slightly Stable - 316Ft-33Ft Delta-T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 5 18 15 8 1 0 47
NNE 3 15 6 2 1 3 30
NE 5 5 8 4 3 1 26
ENE 6 15 3 3 0 0 27
E 8 9 6 1 0 0 24
ESE 2 13 8 2 0 0 25
SE 4 14 26 12 1 0 57
SSE 6 19 35 17 0 0 77
S 7 16 28 23 2 0 76
SSW 6 12 17 8 0 0 43
SW 3 12 13 4 0 0 32
WSW 2 12 12 12 0 0 38
W 3 10 11 10 1 0 35
WNW 2 19 26 16 4 0 67
NW 2 13 37 25 0 0 77
NNW 1 21 21 8 0 0 51
Variable 0 0 0 0 0 0 0
Total 65 223 272 155 13 4 732
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 15
71 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: July - September 2023 Stability Class - Moderately Stable - 316Ft- 33Ft Delta- T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 4 9 4 2 0 0 19
NNE 2 7 2 0 0 0 11
NE 4 4 3 0 0 0 11
ENE 2 2 0 0 0 0 4
E 1 2 0 0 0 0 3
ESE 0 0 0 0 0 0 0
SE 6 1 1 0 0 0 8
SSE 4 4 2 0 0 0 10
S 4 7 1 3 0 0 15
SSW 1 5 3 0 0 0 9
SW 3 11 1 1 0 0 16
WSW 0 5 3 2 0 0 10
W 5 5 6 16 1 0 33
WNW 1 13 15 8 0 0 37
NW 1 8 21 2 0 0 32
NNW 1 3 13 0 0 0 17
Variable 0 0 0 0 0 0 0
Total 39 86 75 34 1 0 235
Hours of calm in this stability class: 1 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 15
72 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: July - September 2023 Stability Class - Extremely Stable - 316Ft-33Ft Delta-T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 1 3 1 0 0 0 5
NNE 0 4 0 0 0 0 4
NE 0 2 0 0 0 0 2
ENE 0 0 0 0 0 0 0
E 1 0 0 0 0 0 1
ESE 0 1 0 0 0 0 1
SE 2 0 0 0 0 0 2
SSE 0 0 0 0 0 0 0
S 2 0 0 0 0 0 2
SSW 0 1 0 0 0 0 1
SW 0 2 0 0 0 0 2
WSW 0 1 4 4 0 0 9
W 0 5 1 1 0 0 7
WNW 2 12 1 0 0 0 15
NW 2 4 6 0 0 0 12
NNW 0 2 2 0 0 0 4
Variable 0 0 0 0 0 0 0
Total 10 37 15 5 0 0 67
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 15
73 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: October - December 2023 Stability Class - Extremely Unstable - 150Ft-33Ft Delta- T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 1 6 0 0 0 0 7
NNE 2 11 1 0 0 0 14
NE 6 2 0 0 0 0 8
ENE 9 0 0 0 0 0 9
E 5 0 0 0 0 0 5
ESE 4 3 0 0 0 0 7
SE 7 6 0 0 0 0 13
SSE 1 7 2 0 0 0 10
S 2 1 3 0 0 0 6
SSW 0 0 0 0 0 0 0
SW 0 1 0 0 0 0 1
WSW 1 1 0 0 0 0 2
W 0 2 0 0 0 0 2
WNW 1 1 2 0 0 0 4
NW 0 5 2 4 0 0 11
NNW 0 3 4 0 0 0 7
Variable 0 0 0 0 0 0 0
Total 39 49 14 4 0 0 106
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
74 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: October - December 2023 Stability Class - Moderately Unstable - 150Ft- 33Ft Delta- T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 3 10 0 0 0 0 13
NNE 8 5 0 0 0 0 13
NE 9 0 0 0 0 0 9
ENE 10 0 0 0 0 0 10
E 13 3 0 0 0 0 16
ESE 5 5 0 0 0 0 10
SE 1 2 0 1 0 0 4
SSE 0 3 8 0 0 0 11
S 0 6 7 0 0 0 13
SSW 0 0 1 0 0 0 1
SW 0 0 6 0 0 0 6
WSW 1 0 4 0 0 0 5
W 0 3 4 0 0 0 7
WNW 0 5 7 2 0 0 14
NW 1 4 15 7 0 0 27
NNW 0 13 19 7 0 0 39
Variable 0 0 0 0 0 0 0
Total 51 59 71 17 0 0 198
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
75 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: October - December 2023 Stability Class - Slightly Unstable - 150Ft- 33Ft Delta- T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 3 1 1 0 0 0 5
NNE 5 3 0 0 0 0 8
NE 3 0 0 0 0 0 3
ENE 5 0 0 0 0 0 5
E 1 1 0 0 0 0 2
ESE 0 0 0 0 0 0 0
SE 1 1 0 0 0 0 2
SSE 0 0 1 0 0 0 1
S 0 1 3 0 0 0 4
SSW 0 1 1 0 0 0 2
SW 0 2 3 0 0 0 5
WSW 0 1 4 0 0 0 5
W 0 6 4 0 0 0 10
WNW 0 7 9 0 0 0 16
NW 1 9 8 5 0 0 23
NNW 0 7 9 2 0 0 18
Variable 0 0 0 0 0 0 0
Total 19 40 43 7 0 0 109
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
76 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: October - December 2023 Stability Class - Neutral - 150Ft-33Ft Delta-T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 12 19 6 0 0 0 37
NNE 17 9 1 0 0 0 27
NE 13 3 0 0 0 0 16
ENE 48 3 0 0 0 0 51
E 36 15 3 0 0 0 54
ESE 14 11 1 0 0 0 26
SE 9 26 0 0 0 0 35
SSE 6 21 3 0 0 0 30
S 5 12 5 0 0 0 22
SSW 1 3 0 0 0 0 4
SW 2 8 7 0 0 0 17
WSW 5 12 5 0 0 0 22
W 5 32 25 3 0 0 65
WNW 6 44 37 9 0 0 96
NW 11 52 53 10 0 0 126
NNW 10 28 28 4 0 0 70
Variable 0 0 0 0 0 0 0
Total 200 298 174 26 0 0 698
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability cl asses: 0
77 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: October - December 2023 Stability Class - Slightly Stable - 150Ft-33Ft Delta-T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 14 5 0 0 0 0 19
NNE 20 5 0 0 0 0 25
NE 23 1 0 0 0 0 24
ENE 33 0 0 0 0 0 33
E 46 7 0 0 0 0 53
ESE 33 8 0 1 0 0 42
SE 29 6 0 0 0 0 35
SSE 20 24 0 0 0 0 44
S 20 15 0 0 0 0 35
SSW 13 3 0 0 0 0 16
SW 15 11 1 0 0 0 27
WSW 15 53 10 0 0 0 78
W 15 67 4 0 0 0 86
WNW 24 54 9 0 0 0 87
NW 18 42 1 0 0 0 61
NNW 17 20 0 0 0 0 37
Variable 0 0 0 0 0 0 0
Total 355 321 25 1 0 0 702
Hours of calm in this stability class: 4 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
78 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: October - December 2023 Stability Class - Moderately Stable - 150Ft- 33Ft Delta- T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 4 0 0 0 0 0 4
NNE 7 0 0 0 0 0 7
NE 10 0 0 0 0 0 10
ENE 12 0 0 0 0 0 12
E 12 0 0 0 0 0 12
ESE 14 0 0 0 0 0 14
SE 9 0 0 0 0 0 9
SSE 4 0 0 0 0 0 4
S 12 0 0 0 0 0 12
SSW 12 1 0 0 0 0 13
SW 25 3 1 0 0 0 29
WSW 29 34 1 0 0 0 64
W 19 12 0 0 0 0 31
WNW 22 2 0 0 0 0 24
NW 15 1 0 0 0 0 16
NNW 8 1 0 0 0 0 9
Variable 0 0 0 0 0 0 0
Total 214 54 2 0 0 0 270
Hours of calm in this stability class: 5 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
79 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: October - December 2023 Stability Class - Extremely Stable - 150Ft-33Ft Delta-T (F)
Winds Measured at 33 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 1 0 0 0 0 0 1
NNE 3 0 0 0 0 0 3
NE 4 0 0 0 0 0 4
ENE 3 0 0 0 0 0 3
E 10 0 0 0 0 0 10
ESE 11 1 0 0 0 0 12
SE 2 0 0 0 0 0 2
SSE 4 0 0 0 0 0 4
S 5 0 0 0 0 0 5
SSW 0 0 0 0 0 0 0
SW 14 6 0 0 0 0 20
WSW 27 8 0 0 0 0 35
W 10 0 0 0 0 0 10
WNW 2 0 0 0 0 0 2
NW 1 0 0 0 0 0 1
NNW 1 0 0 0 0 0 1
Variable 0 0 0 0 0 0 0
Total 98 15 0 0 0 0 113
Hours of calm in this stability class: 3 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
80 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: October - December 2023 Stability Class - Extremely Unstable - 316Ft-33Ft Delta- T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 0 0 0 0 0 0 0
NNE 0 0 1 0 0 0 1
NE 0 0 0 0 0 0 0
ENE 0 1 0 0 0 0 1
E 0 0 0 0 0 0 0
ESE 0 0 1 0 0 0 1
SE 0 0 0 0 0 0 0
SSE 0 0 0 0 0 0 0
S 0 0 0 0 0 0 0
SSW 0 0 0 0 0 0 0
SW 0 0 0 0 0 0 0
WSW 0 0 0 0 0 0 0
W 0 0 0 0 0 0 0
WNW 0 0 0 0 0 0 0
NW 0 0 0 0 0 0 0
NNW 0 0 0 0 0 0 0
Variable 0 0 0 0 0 0 0
Total 0 1 2 0 0 0 3
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
81 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: October - December 2023 Stability Class - Moderately Unstable - 316Ft- 33Ft Delta- T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 0 0 0 0 0 0 0
NNE 0 0 1 0 0 0 1
NE 0 1 0 0 0 0 1
ENE 0 1 0 0 0 0 1
E 0 0 0 0 0 0 0
ESE 0 0 1 0 0 0 1
SE 0 0 1 1 0 0 2
SSE 0 0 0 0 0 0 0
S 0 0 0 0 0 0 0
SSW 0 0 0 0 0 0 0
SW 0 0 0 0 0 0 0
WSW 0 0 0 0 0 0 0
W 0 0 0 0 0 0 0
WNW 0 0 0 0 0 0 0
NW 0 0 0 0 0 0 0
NNW 0 0 0 0 0 0 0
Variable 0 0 0 0 0 0 0
Total 0 2 3 1 0 0 6
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
82 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: October - December 2023 Stability Class - Slightly Unstable - 316Ft- 33Ft Delta- T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 0 1 0 0 0 0 1
NNE 0 1 0 0 0 0 1
NE 0 3 0 0 0 0 3
ENE 0 0 0 0 0 0 0
E 0 1 0 0 0 0 1
ESE 0 2 1 0 0 0 3
SE 0 0 1 0 0 0 1
SSE 0 0 1 0 0 0 1
S 0 0 1 0 0 0 1
SSW 0 1 0 0 0 0 1
SW 0 0 0 1 0 0 1
WSW 0 0 0 0 0 0 0
W 0 0 0 0 0 0 0
WNW 0 0 0 0 0 0 0
NW 0 0 0 0 0 0 0
NNW 0 0 0 0 0 0 0
Variable 0 0 0 0 0 0 0
Total 0 9 4 1 0 0 14
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurement s in all stability classes: 0
83 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: October - December 2023 Stability Class - Neutral - 316Ft-33Ft Delta-T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 3 18 12 13 0 0 46
NNE 6 12 15 3 0 0 36
NE 6 14 10 0 0 0 30
ENE 5 18 4 0 0 0 27
E 13 16 15 3 1 0 48
ESE 1 22 7 5 3 1 39
SE 2 15 20 5 1 1 44
SSE 2 7 14 6 0 0 29
S 1 6 34 16 0 0 57
SSW 1 3 6 0 0 0 10
SW 1 1 17 6 0 0 25
WSW 1 3 13 12 1 0 30
W 0 7 36 32 9 2 86
WNW 0 11 23 47 35 7 123
NW 0 18 54 75 48 4 199
NNW 0 16 37 15 5 0 73
Variable 0 0 0 0 0 0 0
Total 42 187 317 238 103 15 902
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
84 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: October - December 2023 Stability Class - Slightly Stable - 316Ft-33Ft Delta-T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 0 10 11 4 0 0 25
NNE 1 12 8 1 1 0 23
NE 4 2 3 2 0 0 11
ENE 4 11 9 1 0 0 25
E 9 26 20 6 0 0 61
ESE 2 27 29 19 1 1 79
SE 3 20 28 2 0 0 53
SSE 5 13 20 10 0 0 48
S 6 17 44 18 0 0 85
SSW 2 13 23 3 0 0 41
SW 4 13 13 7 0 0 37
WSW 5 15 29 19 8 0 76
W 1 6 20 44 9 0 80
WNW 2 8 27 61 8 0 106
NW 4 10 42 69 8 0 133
NNW 0 5 20 14 0 0 39
Variable 0 0 0 0 0 0 0
Total 52 208 346 280 35 1 922
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
85 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom N uclear Station
Period of Record: October - December 2023 Stability Class - Moderately Stable - 316Ft- 33Ft Delta- T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 3 6 3 0 0 0 12
NNE 3 2 2 0 0 0 7
NE 1 0 1 0 0 0 2
ENE 1 2 0 0 0 0 3
E 1 2 1 0 0 0 4
ESE 0 5 1 0 0 0 6
SE 3 4 6 1 0 0 14
SSE 1 8 5 0 0 0 14
S 2 16 22 3 0 0 43
SSW 3 13 11 1 0 0 28
SW 4 6 4 4 0 0 18
WSW 1 6 10 12 3 0 32
W 2 5 7 14 1 0 29
WNW 0 3 4 11 0 0 18
NW 4 7 13 4 0 0 28
NNW 2 4 5 2 0 0 13
Variable 0 0 0 0 0 0 0
Total 31 89 95 52 4 0 271
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
86 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Peach Bottom Nuclear Station
Period of Record: October - December 2023 Stability Class - Extremely Stable - 316Ft-33Ft Delta-T (F)
Winds Measured at 320 Feet
Wind Speed (in mph)
Wind Direction 1- 3 4-7 8-12 13-18 19-24 > 24 Total
N 1 0 0 0 0 0 1
NNE 0 0 0 0 0 0 0
NE 0 0 0 0 0 0 0
ENE 1 0 0 0 0 0 1
E 0 0 0 0 0 0 0
ESE 0 0 0 0 0 0 0
SE 0 0 0 0 0 0 0
SSE 0 2 0 0 0 0 2
S 1 6 2 0 0 0 9
SSW 1 5 7 2 0 0 15
SW 1 4 7 1 0 0 13
WSW 0 4 6 4 0 0 14
W 4 0 3 3 0 0 10
WNW 3 0 1 0 0 0 4
NW 1 6 2 0 0 0 9
NNW 1 5 6 0 0 0 12
Variable 0 0 0 0 0 0 0
Total 14 32 34 10 0 0 90
Hours of calm in this stability class: 0 Hours of missing wind measurements in this stability class: 0 Hours of missing stability measurements in all stability classes: 0
87 Peach Bottom Atomic Power Station Licensee: Constellation Energy Corporation
Units 1, 2 and 3 PSEG Nuclear, LLC
Appendix A: ODCM Revision
88