PY-CEI-NRR-0030, Commits to Turbine Maint Program Addressing Insp & Maint Methods & Surveillance Interval Consistent W/Ge Recommendations,In Response to & SER Outstanding Issue 1

From kanterella
Revision as of 09:26, 26 July 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Commits to Turbine Maint Program Addressing Insp & Maint Methods & Surveillance Interval Consistent W/Ge Recommendations,In Response to & SER Outstanding Issue 1
ML20072Q682
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 03/31/1983
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
PY-CEI-NRR-0030, PY-CEI-NRR-30, NUDOCS 8304050280
Download: ML20072Q682 (1)


Text

THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P.o. box 5000 - CLEVELAND, oHlo 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG. - 55 PUBLICSoVARE Scrving The Best Location in the Nation \

March 31, 1983 MURRAY R. EDELMAN VtCE PRESIDENT NUCLEAR Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 SER Outstanding Issue #1 - Turbine Generator System Maintenance

Dear Mr. Youngblood:

In response to your letter dated March 14, 1983, CEI commits to submit a turbine maintenance program consistent with the recommendations of the turbine manufacturer's (General Electric) recommendations. These recommendations are found in GE TIL 857, " Inservice Inspection of 1500 and 1800 Nuclear Turbine Rotors", dated February 18, 1978. This program will address the inspection and maintenance methods and the surveillance interval to be used. The program will be based on GE's calculations of turbine missile generation prcbability.

CEI is already committed to perform turbine steam valve maintenance and surveillance as documented in Section 10.2 of NUREG-0887 Finally, CEI is willing to accept a licensing condition requiring periodic inspection and maintenance of the turbine low pressure rotor disk bores and keyways. The surveillance interval will be established after we review the vendor's recommendations. If the vendor's recommendations have not been submitted to the NRC within three years after licensing, CEI will perform vclumetric inspections of the turbine rotors in accordance with TIL 857.

The inspections will be staggered (i.e., one or two rotors each outage) to insure that all rotors are inspected at least every other refueling outage.

All three rotors will have been inspected by the end of the second refueling outage. This process will continue until the new surveillance interval is established.

We believe that this commitment will enable you to close Outstandind Issue #1.

Very truly yours, k QN 8304050280 830331 PDR ADOCK -05000440 Murray R. W elman E Vice President PDR Nuclear Group MRE:kh 1 L

ce s . Jay Silberg, Esq.

John Stefano Max Gildner

_ _ _ . m