Potentially Reportable Deficiency 180 Re Failure to Maintain Adequate Document Control of Vendor Manuals.Initially Reported on 840918.Addl Time Needed to Evaluate Deficiency. Next Rept Will Be Submitted by 850701
ML20129E727
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/29/1985
From: Cook K
LOUISIANA POWER & LIGHT CO.
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
W3P85-1400, NUDOCS 8506060573
Download: ML20129E727 (1)


Text

P Louisiama f ~.o -o~o..r .

POWER & LIGHT / NEW ORLEANS LOUSANA

. o .cx.co.

70174-8006 9 (504)368-.345 N lY90Y TE May 29, 1985 W3P85-1400 A4.05 Mr. Robert D. Martin Regional Administrator, Region IV U.S. Nuclear Regulatory Commission -

g g gang 611 Ryan Plaza Drive, Suite 1000 L_5 L5 U W L5 Arlington, TX 76011 l

Dear Mr. Martin:

t MAY 3 01985 4

Subject:

Waterford 3 SES

- ~ - - - - h Docket No. 50-382 ~ - - "

Facility Operating License No. NPF-38 POTENTIALLY REPORTABLE DEFICIENCY NO. 180

" Failure to Maintain Adequate Document Control of Vendor Manuals" Extension of Report Schedule

References:

1. W3P85-1240 from K.W. Cook (LP&L) to R.D. Martin (NRC),

dated 4/29/85. ,

2. W3P84-2386 from K.W. Cook (LP&L) to J.T. Collins (NRC),

dated 9/13/84 In accordance with 10CFR50.55(e), LP&L provided telephone notification on September 18, 1984 of the subject deficiency. Reference 1 requested an extension for the submittal of a written report on PRD-180 to April 30, 1985. Reference 2 provided LP&L's response to related Violation 8425-01 which specified details on corrective actions planned and underway to resolve this violation.

LP&L requires additional time to evaluate the safety significance of PRD-180 for reportability determination of the deficiency per 10CFR50.55(e) guidance. LP&L has, therefore, rescheduled the submittal of the written report on PRD-180 for July 1, 1985.

Very truly yours, 8

K.W. Cook Nuclear Support & Licensing Manager KWC:GEW:sms cc: NRC, Director, Office of I&E C.W. Knighton, NRC-NRR D.M. Crutchfield, NRC-NRR NRC Resident Inspectors Office INPO Records Center (J.T. Wheelock) _