TXX-4974, Interim Deficiency Rept CP-85-36 Re Installation of nonsafety-related Conduit on nonsafety-related Dead Weight Supports.Initially Reported on 850906.Impell Evaluation Continuing.Next Rept Will Be Submitted by 860924

From kanterella
Revision as of 11:26, 9 July 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Interim Deficiency Rept CP-85-36 Re Installation of nonsafety-related Conduit on nonsafety-related Dead Weight Supports.Initially Reported on 850906.Impell Evaluation Continuing.Next Rept Will Be Submitted by 860924
ML20212P792
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 08/22/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-85-36, TXX-4974, NUDOCS 8609030281
Download: ML20212P792 (1)


Text

.__

Log # TXX-4974 File # 10110

. 908.9 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER

  • 400 NORTH OLIVE RTREET. I B. 81. DALLAS. TEXAN 75301 August 22, 1986 WILLIAM G. COUNSIL as:curwa vecs ensaiosur ---

AllG 2 7 ig86 0 Mr. Eric H. Johnson. Director Division of Reactor Safety and Projects u i h U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NO. 50-445 TRAIN C CONDUIT SUPPORTS SDAR: CP-85-36 (INTERIM REPORT)

Dear Mr. Johnson:

On September 6,1986, we verbally notified your Mr. C. Gould of a deficiency involving the: installation of non-safety related conduit (two-inch diameter and smaller) on non-safety related dead weight supports. This is an interim repcrt of a potentially reportable item under the provisions of 10CFR50.55(e).

We have submitted interim reports logged TXX-4572, TXX-4674, and TXX-4974, dated September 30, 1985, January 22, 1986, and July 3,1986, respectively.

This issue is being evaluated by Impell under CPRT Program Plan Item I.c which is scheduled to be completed in September 1986. We anticipate submitting our next report by September 24, 1986.

Very truly yours, h Swlb W. G. Counsil 8609030281 860822 By- [ '

PDR ADOCK 05000445 G.S. Keeley 3/

S PDR Manager, Nuclear Vicensing JCH/amb c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C. 20555 0

A rnvisioN or rExAs ursuTIES EE.ECTRBC COMPANY hl

_ -.