IR 05000458/1993025

From kanterella
Revision as of 03:32, 2 June 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of Significant Licensee Meeting W/Util on 940218 to Discuss Apparent Violations Noted in Insp Rept 50-458/93-25
ML20059J828
Person / Time
Site: River Bend Entergy icon.png
Issue date: 01/24/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9402010203
Download: ML20059J828 (3)


Text

._ .. . . _ . - -. _

i pR CEGO UNITED STATES

,

, g ,

fg NUCLEAR REGULATORY COMMISSION y REGloN IV

.

}E l o 611 RYAN PLAZA DRIVE, SUITE 400

'

<< AR LINGTON, TEXAS 760114064 j +...+ JAN 2 41994

i NOTICE OF SIGNIFICANT LICENSEE MEETING i

Name of Licensee: Entergy Operations, Inc.

l Name of Facility: River Bend Station (RBS)

i j Docket No.: 50-458 l Date and Time February 18, 1994 '

of Meeting: 10 a.m. (CST) ,

Location of Meeting: Training Conference Room, NRC Region IV Office I Purpose of Meeting: Enforcement Conference to discuss the apparent j violations in NRC Inspection Report 50-458/93-25 4 ,

NRC Attendees: J. Callan, Regional Administrator

. A. Beach, Director, Division of Reactor Projects (DRP).

P. Gwynn, Director, Division of Reactor Safety (DRS)

S. Black, Director, Project Directorate IV-2, Office of

.

Nuclear Reactor Regulation (NRR)

G. Sanborn, Enforcement Officer J. Gagliardo, Chief, Project Section C, DRP i

'

W. Smith, Senior Resident Inspector, RBS, DRP C. Skinner, Resident Inspector, RBS, DRP >

i C. Hackney, State Liaison Officer -

j J. Gilliland, Public Affairs Officer l i

'

S. Wittenberg, Intern, NRR- '

P. Harrell, Chief, Technical Support Staff, DRP

P. Wagner, Team Leader, DRS j E. Collins, Project Engineer, Project Section C, DRP i Licensee Attendees: H. Keiser, Senior Vice President for Nuclear Operations,

<

Gulf States Utilities i J. McGaha, Vice President, River Bend Nuclear Group-M. Sellman, Plant Manager, RBS  :

4 J. Fisicaro, Manager, Safety Assessment & Quality i Verification, River Bend Nuclear Group ,

j T. Leonard, Manager, Engineering  ;

'

'

i NOTE:

(1) Attendance by other NRC personnel at this meeting should.be made

, known by COB on February 11, 1994, via telephone call to Phil Harrell

(817/860-8250).

b 4 e l0

.

j 94o2010203 94o124 _ l PDR g

ADOCK 050004mts PDR ,

'

g4J i

, . -. -

. . , - .

. ._ _ . . . - _ . _ _ . . .

.

.

.  ;

-

.  :

. i

,

Entergy Operations, In ;

.

(2) This conference is open to attendance by members of the general publi t

[? [1 Approved By: I /;b b--\d -

'

A/ lill leach, Director Division of Reactor Projects' i i

t

,

I f

.

, , ,~,n --- - ,e, c

. -. - . _ . - ~~ .- . . . . --

.;

,

t

- -  ;

.

'

i  ;

. .

Entergy Operations,-In JAN 2 4 M .

!

l

!

Distribution: 4

DMB (IE 45)

J. H. Sniezek, DEDR (MS 17G21) i H. L. Thompson, DEDS (MS 17G21) l

T. E. Murley, D/NRR (MS 1201)

W. T. Russell, ADT/NRR (MS 12G18)  ;

J. G. Partlow, ADP/NRR (MS 1209)  :

J. Lieberman, D/0E (MS 7H5)  !

i L. J. Chandler, 0GC (MS 15B18)

E. Baker, Project Manager, NRR (MS 13H15)

OED0 RIV Coordinator (MS 17G21)  :

L. J. Callan, RA l J. M. Montgomery, DRA  !

!

NRC Attendees RA Secretary l Carol Gordon  !

Division Secretary, (DRP, DRS) i L. S. Ousley RIV File j

>

I

.

!

.

R . B/DRP C: BC'/RF PAD N RSLOUP E DhP r ell:lt JEGagliardo JTGilMland CAHackney G an orn ABBt.ach l 1 . 94 1//,j/94 1/27- 94 1/u/94 1/fft/94 Ig/94 ,

l

.I