IR 05000458/1993025

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting W/Util on 940218 to Discuss Apparent Violations Noted in Insp Rept 50-458/93-25
ML20059J828
Person / Time
Site: River Bend Entergy icon.png
Issue date: 01/24/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9402010203
Download: ML20059J828 (3)


Text

._

..

.

. _.

-

-.

_

i

,

pR CEGO UNITED STATES g

fg NUCLEAR REGULATORY COMMISSION

,

,

y

}

REGloN IV

.

E l

o 611 RYAN PLAZA DRIVE, SUITE 400

<<

AR LINGTON, TEXAS 760114064

'

JAN 2 41994 j

+...+

i NOTICE OF SIGNIFICANT LICENSEE MEETING i

Name of Licensee:

Entergy Operations, Inc.

l Name of Facility:

River Bend Station (RBS)

i j

Docket No.:

50-458 l

Date and Time February 18, 1994

'

of Meeting:

10 a.m. (CST)

,

Location of Meeting: Training Conference Room, NRC Region IV Office I

Purpose of Meeting:

Enforcement Conference to discuss the apparent j

violations in NRC Inspection Report 50-458/93-25

,

NRC Attendees:

J. Callan, Regional Administrator A. Beach, Director, Division of Reactor Projects (DRP).

.

P. Gwynn, Director, Division of Reactor Safety (DRS)

S. Black, Director, Project Directorate IV-2, Office of

.

Nuclear Reactor Regulation (NRR)

G. Sanborn, Enforcement Officer J. Gagliardo, Chief, Project Section C, DRP i

W. Smith, Senior Resident Inspector, RBS, DRP

'

C. Skinner, Resident Inspector, RBS, DRP

>

i C. Hackney, State Liaison Officer

-

j J. Gilliland, Public Affairs Officer l

i S. Wittenberg, Intern, NRR-

'

'

P. Harrell, Chief, Technical Support Staff, DRP

P. Wagner, Team Leader, DRS j

E. Collins, Project Engineer, Project Section C, DRP i

Licensee Attendees:

H. Keiser, Senior Vice President for Nuclear Operations, Gulf States Utilities

<

i J. McGaha, Vice President, River Bend Nuclear Group-M. Sellman, Plant Manager, RBS

J. Fisicaro, Manager, Safety Assessment & Quality i

Verification, River Bend Nuclear Group

,

j T. Leonard, Manager, Engineering

'

i NOTE:

'

(1) Attendance by other NRC personnel at this meeting should.be made

,

known by COB on February 11, 1994, via telephone call to Phil Harrell

(817/860-8250).

b

e l0

.

j 94o2010203 94o124 _

g4 l

PDR ADOCK 050004mts

'

g PDR J

,

i

,

. -.

-

.

.

,

-

.

.

.

._ _

_..

... - _

. _ _.

..

.

.

.

-

.

.

i

,

Entergy Operations, Inc.

-2-

.

(2) This conference is open to attendance by members of the general public.

t

[?

[1b--\\

/;b d

Approved By:

I

-

'

A/ lill leach, Director Division of Reactor Projects'

i i

t

,

I f

.

.**

,

-

,

,~,n-r

--- -

,,

,e,

.r-*

c

.

-. -. _

. -

~~

.-

....

--

.;

,

t

-

-

.

'

i

.

.

Entergy Operations,-Inc.

-3-JAN 2 4 M

.

!

l

!

Distribution:

DMB (IE 45)

J. H. Sniezek, DEDR (MS 17G21)

i H. L. Thompson, DEDS (MS 17G21)

l T. E. Murley, D/NRR (MS 1201)

W. T. Russell, ADT/NRR (MS 12G18)

J. G. Partlow, ADP/NRR (MS 1209)

!

J. Lieberman, D/0E (MS 7H5)

i L. J. Chandler, 0GC (MS 15B18)

E. Baker, Project Manager, NRR (MS 13H15)

OED0 RIV Coordinator (MS 17G21)

L. J. Callan, RA l

J. M. Montgomery, DRA

!

NRC Attendees

!

l RA Secretary Carol Gordon

!

i Division Secretary, (DRP, DRS)

L. S. Ousley RIV File j

>

I

.

!

.

R B/DRP C: BC'/RF PAD N RSLOUP E

DhP

.

r ell:lt JEGagliardo JTGilMland CAHackney G an orn ABBt.ach

. 94 1//,j/94 1/27-94 1/u/94 1/fft/94 Ig/94

,

.I