IR 05000458/1993025
| ML20059J828 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 01/24/1994 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 9402010203 | |
| Download: ML20059J828 (3) | |
Text
._
..
.
. _.
-
-.
_
i
,
pR CEGO UNITED STATES g
fg NUCLEAR REGULATORY COMMISSION
,
,
y
}
REGloN IV
.
E l
o 611 RYAN PLAZA DRIVE, SUITE 400
<<
'
JAN 2 41994 j
+...+
i NOTICE OF SIGNIFICANT LICENSEE MEETING i
Name of Licensee:
Entergy Operations, Inc.
l Name of Facility:
River Bend Station (RBS)
i j
Docket No.:
50-458 l
Date and Time February 18, 1994
'
of Meeting:
10 a.m. (CST)
,
Location of Meeting: Training Conference Room, NRC Region IV Office I
Purpose of Meeting:
Enforcement Conference to discuss the apparent j
violations in NRC Inspection Report 50-458/93-25
,
NRC Attendees:
J. Callan, Regional Administrator A. Beach, Director, Division of Reactor Projects (DRP).
.
P. Gwynn, Director, Division of Reactor Safety (DRS)
S. Black, Director, Project Directorate IV-2, Office of
.
Nuclear Reactor Regulation (NRR)
G. Sanborn, Enforcement Officer J. Gagliardo, Chief, Project Section C, DRP i
W. Smith, Senior Resident Inspector, RBS, DRP
'
C. Skinner, Resident Inspector, RBS, DRP
>
i C. Hackney, State Liaison Officer
-
j J. Gilliland, Public Affairs Officer l
i S. Wittenberg, Intern, NRR-
'
'
P. Harrell, Chief, Technical Support Staff, DRP
P. Wagner, Team Leader, DRS j
E. Collins, Project Engineer, Project Section C, DRP i
Licensee Attendees:
H. Keiser, Senior Vice President for Nuclear Operations, Gulf States Utilities
<
i J. McGaha, Vice President, River Bend Nuclear Group-M. Sellman, Plant Manager, RBS
J. Fisicaro, Manager, Safety Assessment & Quality i
Verification, River Bend Nuclear Group
,
j T. Leonard, Manager, Engineering
'
i NOTE:
'
(1) Attendance by other NRC personnel at this meeting should.be made
,
known by COB on February 11, 1994, via telephone call to Phil Harrell
(817/860-8250).
b
e l0
.
j 94o2010203 94o124 _
g4 l
PDR ADOCK 050004mts
'
g PDR J
,
i
,
. -.
-
.
.
,
-
.
.
.
._ _
_..
... - _
. _ _.
..
.
.
.
-
.
.
i
,
Entergy Operations, Inc.
-2-
.
(2) This conference is open to attendance by members of the general public.
t
[?
[1b--\\
/;b d
Approved By:
I
-
'
A/ lill leach, Director Division of Reactor Projects'
i i
t
,
I f
.
.**
,
-
,
,~,n-r
--- -
,,
,e,
.r-*
c
.
-. -. _
. -
~~
.-
....
--
.;
,
t
-
-
.
'
i
.
.
Entergy Operations,-Inc.
-3-JAN 2 4 M
.
!
l
!
Distribution:
DMB (IE 45)
J. H. Sniezek, DEDR (MS 17G21)
i H. L. Thompson, DEDS (MS 17G21)
l T. E. Murley, D/NRR (MS 1201)
W. T. Russell, ADT/NRR (MS 12G18)
J. G. Partlow, ADP/NRR (MS 1209)
!
J. Lieberman, D/0E (MS 7H5)
i L. J. Chandler, 0GC (MS 15B18)
E. Baker, Project Manager, NRR (MS 13H15)
OED0 RIV Coordinator (MS 17G21)
L. J. Callan, RA l
J. M. Montgomery, DRA
!
NRC Attendees
!
l RA Secretary Carol Gordon
!
i Division Secretary, (DRP, DRS)
L. S. Ousley RIV File j
>
I
.
!
.
R B/DRP C: BC'/RF PAD N RSLOUP E
DhP
.
r ell:lt JEGagliardo JTGilMland CAHackney G an orn ABBt.ach
. 94 1//,j/94 1/27-94 1/u/94 1/fft/94 Ig/94
,
.I