Special Rept 1-SR-93-001:on 921216,reactor Bldg Fire Detection Sys Declared Inoperable Due to Continuous Spurious Alarming in Ionization Detectors for More than 14 Days. Sensitivity Testing & Cleaning Implemented
ML20128B846
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/29/1993
From: Jonathan Brown
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
1-SR-93-001, 1-SR-93-1, BSEP-93-0011, BSEP-93-11, NUDOCS 9302030192
Download: ML20128B846 (2)


Text

, - .. .~

^

CfVA Carolina Power & Light Company .

GWJalunmulam"l:limetnam Brunswick Nuclear Plant P. O. Box-10429 Southport, N.C. 28461-0429 J AN 2 91993.

FILE: B09-13510C SERIAL: BSEP-93-0011 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 BRUNSWICK. STEAM ELECTRIC PLANT UNIT 1 DOCKET NO. 50-325 LICENSE NO. DPR-71 SPECIAL REPORT PER TECHNICAL SPECIFICATION 3.3.5.7 AND Ep,BSUANT TO TECHNICAL SPECIFICATION 6.9.2 (1-SR-93-001)

Gentlemen Unit 1 is in Cold Shutdown for an outage that started on April 21, 1992. The following summarizes fire protection Limiting condition for Operation (LCO)

Al-92-F0967:

(tcO) Al-92-r0967 At 1030 on December 16, 1992, the Unit 1 Reactor Building Fire Detection System was declared inoperable due to the continuing spuriou3 . alarming of numerous ionization detectors in multiple zones. . A fire watch was stationed and will remain in place until the cause of the-alarms can be determined and repaired.

By December-30, 1992, the Unit 1 Reactor Building fire detection - system had remained inoperable longer than the 14 days specified . by the Technical Specification LCO requiring this Special Report.

An Engineering Work Request (10069) has been generated ' to continue the investigation and correct the problem. The spurious alarms'for ionization detectors are affected by changes in humidity and temperature. The increased-sensitivity of the detectors to environmental conditions is being investigated.

Work Request / Job Order (WRJO) 92-BIYC1 has been written to implement detector-.

9302030192 930129 5 f l DR ADOCK 0500

  • _.m1- -- --- -- a--- _ _ - - - . - - - - - - - - - - - - 8'-

4

?

ESEP-93-0011 eensitivity testing and cleanlag. Currently, the sensitivity test / Preventive Maintainance procedure (OPH-DET-005) and Measurement and Test Equipment procedure 1 (OMTE-TDC-001) have been written and are undergoing the final reviews _ required for implementation. This should allow the field work to be scheduled for an early February start, with a completion date yet to be determined.

Very truly yours, W

. M. Brown, Plant Manager Unit 2 Brunswick Nuclear Plant cca Mr. S. D. Ebneter Mr. P. D. Milano BSEP NRC Resident Office i

.