Category:INSPECTION REPORT
MONTHYEARIR 05000298/19990121999-10-22022 October 1999 Insp Rept 50-298/99-12 on 990927-30.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program & Included Review of Emergency Preparedness Performance Indicators IR 05000298/19990101999-10-14014 October 1999 Insp Rept 50-298/99-10 on 990920-24.No Violations Noted. Major Areas Inspected:Radiological Environ & Meteorological Monitoring Programs & Program for Unrestricted Release of Matl from Radiological Controlled Area IR 05000298/19990031999-10-0808 October 1999 Insp Rept 50-298/99-03 on 990823-27 & 990907-10.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000298/19990071999-09-27027 September 1999 Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Implementation of Reactor Safety & Emergency Preparedness Programs IR 05000298/19990091999-09-22022 September 1999 Insp Rept 50-298/99-09 on 990823-26.No Violations Noted. Major Areas Inspected:Radioactive Matl Processing & Shipping Programs & Occupational Radiation Safety Performance Indicator IR 05000298/19990081999-09-14014 September 1999 Insp Rept 50-298/99-08 on 990816-20.No Violations Noted. Major Areas Inspected:Access Authorization/Fitness-for-Duty (Behavior Observation) Program,Access Control of Personnel, Packages & Vehicles Into Protected & Vital Areas & PIs IR 05000298/19990061999-08-0909 August 1999 Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted. Major Areas Inspected:Inspectors Performed Partial Walkdown of high-pressure Coolant Injection Sys,Including Components Located in Sys Pump Room IR 05000298/19990021999-07-21021 July 1999 Insp Rept 50-298/99-02 on 990628-0702.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluation Operator IR 05000298/19990051999-06-16016 June 1999 Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000298/19990041999-05-19019 May 1999 Insp Rept 50-298/99-04 on 990321-0501.Non-cited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Status.Emergency Procedures Failed to Instruct Operators When to Reduce Core Spray Pump Flow Following DBA IR 05000298/19990011999-05-0505 May 1999 Insp Rept 50-298/99-01 on 990207-0320.Non-cited Violations Noted.Major Areas Inspected:Operations & Maint ML20204D9811999-03-18018 March 1999 Insp Rept 50-298/98-09 on 981227-990206.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980081999-01-22022 January 1999 Insp Rept 50-298/98-08 on 980115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199E1691999-01-0707 January 1999 Insp Rept 50-298/98-22 on 981116-1208.Violations Noted.Major Areas Inspected:Licensee Performance in Completing Engineering Strategy Action Item 3.2.e IR 05000298/19980151998-12-17017 December 1998 Insp Rept 50-298/98-15 on 980504-22 & 980608-26.Violations Noted.Major Areas Inspected:Safety Sys Engineering Insp Performed for Dgs,Vital Ac Eds & CR Emergency Filtration Sys IR 05000298/19980071998-12-11011 December 1998 Insp Rept 50-298/98-07 on 981004-1114.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980211998-10-29029 October 1998 Insp Rept 50-298/98-21 on 981005-09.No Violations Noted. Major Areas Inspected:Third 10-yr Interval Inservice Insp Program,Including GE Reactor Insp Sys Automated Ultrasonic Exams of Reactor Vessel Circumferential Weld IR 05000298/19980061998-10-21021 October 1998 Insp Rept 50-298/98-06 on 980823-1003.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Plant Support IR 05000298/19980201998-09-21021 September 1998 Insp Rept 50-298/98-20 on 980831-0904.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000298/19980051998-09-18018 September 1998 Insp Rept 50-298/98-05 on 980712-0822.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980041998-08-19019 August 1998 Errata to Insp Rept 50-298/98-04.Page 10 of Rept Was Inadvertently Omitted ML20237A6221998-08-10010 August 1998 Insp Rept 50-298/98-04 on 980531-0711.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980181998-06-30030 June 1998 Insp Rept 50-298/98-18 on 980518-21 & 0608-11.No Violations Noted.Major Areas Inspected:Reviewed Radiation Protection Activities Including Exposure Controls,Controls of Radioactive Matls & Contamination IR 05000298/19980031998-06-23023 June 1998 Insp Rept 50-298/98-03 on 980419-0530.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980161998-06-22022 June 1998 Insp Rept 50-298/98-16 on 980608-11.Weakness Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale Biennial Exercise of Emergency Plan & Implementing Procedures IR 05000298/19980191998-06-17017 June 1998 Cancelled Insp Rept 50-298/98-19.Open Items Insp That Was Assigned NRC Insp Rept 50-298/98-19 Will Be Combined W/ Engineering Insp Documented in NRC Insp Rept 50-298/98-15 IR 05000298/19980021998-06-11011 June 1998 Errata to Insp Rept 50-298/98-02,dtd 980515.Changes Have Been Made to Fourth Paragraph IR 05000298/19980171998-05-26026 May 1998 Insp Rept 50-298/98-17 on 980504-08.Violations Noted.Major Areas Inspected:Plant Support ML20247L2721998-05-15015 May 1998 Insp Rept 50-298/98-02 on 980308-0418.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980131998-04-17017 April 1998 Insp Rept 50-298/98-13 on 980406-09.No Violations Noted. Major Areas Inspected:Training & Qualifications,Quality Assurance Oversight,Facilities & Equipment,Procedural Guidance & Annual Repts IR 05000298/19980141998-04-17017 April 1998 Insp Rept 50-298/98-14 on 980406-09.No Violations Noted. Major Areas Inspected:Organization & Mgt Controls, Radioactive Effluent Monitoring & safety-related Air Cleaning Sys ML20216F8721998-04-14014 April 1998 Insp Rept 50-298/98-12 on 980316-19.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities & Equipment,Organization & Mgt Control,Training & Audits IR 05000298/19980111998-04-0909 April 1998 Cancelled Insp Rept 50-298/98-11.No Rept Will Be Issued W/Subj Number IR 05000298/19980011998-03-31031 March 1998 Insp Rept 50-298/98-01 on 980125-0307.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980101998-03-19019 March 1998 Insp Rept 50-298/98-10 on 980302-06.Violations Noted.Major Areas Inspected:Review of Access Authorization,Vehicle Access Control,Assessment Aids,Safeguards Event Logs,Plans & Procedures & Audit & self-assessment Programs IR 05000298/19970111998-02-23023 February 1998 Insp Rept 50-298/97-11 on 971214-980124.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19972011998-02-0505 February 1998 Insp Repts 50-298/97-201 on 971027-1121 & 1201-04.No Violations Noted.Major Areas Inspected:Rhr Sys & REC Sys ML20198L0471998-01-12012 January 1998 Insp Rept 50-298/97-10 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19970091997-12-19019 December 1997 Insp Rept 50-298/97-09 on 970921-1101.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19970191997-12-17017 December 1997 Insp Rept 50-298/97-19 on 971117-20.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring,Training & Qualifications,Qa Oversight,Facilities & Equipment IR 05000298/19970181997-12-17017 December 1997 Insp Rept 50-298/97-18 on 971020-1117.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000298/19970171997-12-10010 December 1997 Insp Rept 50-298/97-17 on 971117-20.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Evaluation IR 05000298/19970081997-10-20020 October 1997 Insp Rept 50-298/97-08 on 970810-0920.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000298/19970161997-10-0909 October 1997 Insp Rept 50-298/97-16 on 970915-24.Violations Noted.Major Areas Inspected:Follow Up on Licensee Planned & Implemented Activities Associated W/Erosion/Corrosion Monitoring Program & Open NRC Items IR 05000298/19970121997-10-0303 October 1997 Insp Rept 50-298/97-12 on 970708-0905.Violations Being Considered for Escalated Ea.Major Areas Inspected:Evaluation of Licensee Performance Re Recognizing Documenting & Correcting Conditions Adverse to Quality ML20154F2061997-09-19019 September 1997 Partially Withheld Insp Rept 50-298/97-15 on 970818-22 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Utilizing Technical Instruction 2515-132,dtd 960118 IR 05000298/19970131997-09-12012 September 1997 Insp Rept 50-298/97-13 on 970728-0814.Violation Noted.Major Areas Inspected:Surveillance Procedure IR 05000298/19970071997-09-0404 September 1997 Insp Rept 50-298/97-07 on 970629-0809.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000298/19970141997-08-27027 August 1997 Insp Rept 50-298/97-14 on 970804-08.No Violations Noted. Major Areas Inspected:Licensee FFD Program Utilizing IP 81502, FFD Program, ML20149K8881997-07-25025 July 1997 Insp Rept 50-298/97-06 on 970518-0628.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-27
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000298/19990121999-10-22022 October 1999 Insp Rept 50-298/99-12 on 990927-30.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program & Included Review of Emergency Preparedness Performance Indicators IR 05000298/19990101999-10-14014 October 1999 Insp Rept 50-298/99-10 on 990920-24.No Violations Noted. Major Areas Inspected:Radiological Environ & Meteorological Monitoring Programs & Program for Unrestricted Release of Matl from Radiological Controlled Area IR 05000298/19990031999-10-0808 October 1999 Insp Rept 50-298/99-03 on 990823-27 & 990907-10.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000298/19990071999-09-27027 September 1999 Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Implementation of Reactor Safety & Emergency Preparedness Programs IR 05000298/19990091999-09-22022 September 1999 Insp Rept 50-298/99-09 on 990823-26.No Violations Noted. Major Areas Inspected:Radioactive Matl Processing & Shipping Programs & Occupational Radiation Safety Performance Indicator IR 05000298/19990081999-09-14014 September 1999 Insp Rept 50-298/99-08 on 990816-20.No Violations Noted. Major Areas Inspected:Access Authorization/Fitness-for-Duty (Behavior Observation) Program,Access Control of Personnel, Packages & Vehicles Into Protected & Vital Areas & PIs IR 05000298/19990061999-08-0909 August 1999 Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted. Major Areas Inspected:Inspectors Performed Partial Walkdown of high-pressure Coolant Injection Sys,Including Components Located in Sys Pump Room IR 05000298/19990021999-07-21021 July 1999 Insp Rept 50-298/99-02 on 990628-0702.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluation Operator IR 05000298/19990051999-06-16016 June 1999 Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000298/19990041999-05-19019 May 1999 Insp Rept 50-298/99-04 on 990321-0501.Non-cited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Status.Emergency Procedures Failed to Instruct Operators When to Reduce Core Spray Pump Flow Following DBA IR 05000298/19990011999-05-0505 May 1999 Insp Rept 50-298/99-01 on 990207-0320.Non-cited Violations Noted.Major Areas Inspected:Operations & Maint ML20204D9811999-03-18018 March 1999 Insp Rept 50-298/98-09 on 981227-990206.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980081999-01-22022 January 1999 Insp Rept 50-298/98-08 on 980115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199E1691999-01-0707 January 1999 Insp Rept 50-298/98-22 on 981116-1208.Violations Noted.Major Areas Inspected:Licensee Performance in Completing Engineering Strategy Action Item 3.2.e IR 05000298/19980151998-12-17017 December 1998 Insp Rept 50-298/98-15 on 980504-22 & 980608-26.Violations Noted.Major Areas Inspected:Safety Sys Engineering Insp Performed for Dgs,Vital Ac Eds & CR Emergency Filtration Sys IR 05000298/19980071998-12-11011 December 1998 Insp Rept 50-298/98-07 on 981004-1114.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980211998-10-29029 October 1998 Insp Rept 50-298/98-21 on 981005-09.No Violations Noted. Major Areas Inspected:Third 10-yr Interval Inservice Insp Program,Including GE Reactor Insp Sys Automated Ultrasonic Exams of Reactor Vessel Circumferential Weld IR 05000298/19980061998-10-21021 October 1998 Insp Rept 50-298/98-06 on 980823-1003.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Plant Support IR 05000298/19980201998-09-21021 September 1998 Insp Rept 50-298/98-20 on 980831-0904.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000298/19980051998-09-18018 September 1998 Insp Rept 50-298/98-05 on 980712-0822.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980041998-08-19019 August 1998 Errata to Insp Rept 50-298/98-04.Page 10 of Rept Was Inadvertently Omitted ML20237A6221998-08-10010 August 1998 Insp Rept 50-298/98-04 on 980531-0711.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980181998-06-30030 June 1998 Insp Rept 50-298/98-18 on 980518-21 & 0608-11.No Violations Noted.Major Areas Inspected:Reviewed Radiation Protection Activities Including Exposure Controls,Controls of Radioactive Matls & Contamination IR 05000298/19980031998-06-23023 June 1998 Insp Rept 50-298/98-03 on 980419-0530.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980161998-06-22022 June 1998 Insp Rept 50-298/98-16 on 980608-11.Weakness Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale Biennial Exercise of Emergency Plan & Implementing Procedures IR 05000298/19980191998-06-17017 June 1998 Cancelled Insp Rept 50-298/98-19.Open Items Insp That Was Assigned NRC Insp Rept 50-298/98-19 Will Be Combined W/ Engineering Insp Documented in NRC Insp Rept 50-298/98-15 IR 05000298/19980021998-06-11011 June 1998 Errata to Insp Rept 50-298/98-02,dtd 980515.Changes Have Been Made to Fourth Paragraph IR 05000298/19980171998-05-26026 May 1998 Insp Rept 50-298/98-17 on 980504-08.Violations Noted.Major Areas Inspected:Plant Support ML20247L2721998-05-15015 May 1998 Insp Rept 50-298/98-02 on 980308-0418.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980131998-04-17017 April 1998 Insp Rept 50-298/98-13 on 980406-09.No Violations Noted. Major Areas Inspected:Training & Qualifications,Quality Assurance Oversight,Facilities & Equipment,Procedural Guidance & Annual Repts IR 05000298/19980141998-04-17017 April 1998 Insp Rept 50-298/98-14 on 980406-09.No Violations Noted. Major Areas Inspected:Organization & Mgt Controls, Radioactive Effluent Monitoring & safety-related Air Cleaning Sys ML20216F8721998-04-14014 April 1998 Insp Rept 50-298/98-12 on 980316-19.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities & Equipment,Organization & Mgt Control,Training & Audits IR 05000298/19980111998-04-0909 April 1998 Cancelled Insp Rept 50-298/98-11.No Rept Will Be Issued W/Subj Number IR 05000298/19980011998-03-31031 March 1998 Insp Rept 50-298/98-01 on 980125-0307.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980101998-03-19019 March 1998 Insp Rept 50-298/98-10 on 980302-06.Violations Noted.Major Areas Inspected:Review of Access Authorization,Vehicle Access Control,Assessment Aids,Safeguards Event Logs,Plans & Procedures & Audit & self-assessment Programs IR 05000298/19970111998-02-23023 February 1998 Insp Rept 50-298/97-11 on 971214-980124.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19972011998-02-0505 February 1998 Insp Repts 50-298/97-201 on 971027-1121 & 1201-04.No Violations Noted.Major Areas Inspected:Rhr Sys & REC Sys ML20198L0471998-01-12012 January 1998 Insp Rept 50-298/97-10 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19970091997-12-19019 December 1997 Insp Rept 50-298/97-09 on 970921-1101.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19970191997-12-17017 December 1997 Insp Rept 50-298/97-19 on 971117-20.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring,Training & Qualifications,Qa Oversight,Facilities & Equipment IR 05000298/19970181997-12-17017 December 1997 Insp Rept 50-298/97-18 on 971020-1117.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000298/19970171997-12-10010 December 1997 Insp Rept 50-298/97-17 on 971117-20.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Evaluation IR 05000298/19970081997-10-20020 October 1997 Insp Rept 50-298/97-08 on 970810-0920.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000298/19970161997-10-0909 October 1997 Insp Rept 50-298/97-16 on 970915-24.Violations Noted.Major Areas Inspected:Follow Up on Licensee Planned & Implemented Activities Associated W/Erosion/Corrosion Monitoring Program & Open NRC Items IR 05000298/19970121997-10-0303 October 1997 Insp Rept 50-298/97-12 on 970708-0905.Violations Being Considered for Escalated Ea.Major Areas Inspected:Evaluation of Licensee Performance Re Recognizing Documenting & Correcting Conditions Adverse to Quality ML20154F2061997-09-19019 September 1997 Partially Withheld Insp Rept 50-298/97-15 on 970818-22 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Utilizing Technical Instruction 2515-132,dtd 960118 IR 05000298/19970131997-09-12012 September 1997 Insp Rept 50-298/97-13 on 970728-0814.Violation Noted.Major Areas Inspected:Surveillance Procedure IR 05000298/19970071997-09-0404 September 1997 Insp Rept 50-298/97-07 on 970629-0809.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000298/19970141997-08-27027 August 1997 Insp Rept 50-298/97-14 on 970804-08.No Violations Noted. Major Areas Inspected:Licensee FFD Program Utilizing IP 81502, FFD Program, ML20149K8881997-07-25025 July 1997 Insp Rept 50-298/97-06 on 970518-0628.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-27
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000298/19990121999-10-22022 October 1999 Insp Rept 50-298/99-12 on 990927-30.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program & Included Review of Emergency Preparedness Performance Indicators IR 05000298/19990101999-10-14014 October 1999 Insp Rept 50-298/99-10 on 990920-24.No Violations Noted. Major Areas Inspected:Radiological Environ & Meteorological Monitoring Programs & Program for Unrestricted Release of Matl from Radiological Controlled Area IR 05000298/19990031999-10-0808 October 1999 Insp Rept 50-298/99-03 on 990823-27 & 990907-10.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000298/19990071999-09-27027 September 1999 Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Implementation of Reactor Safety & Emergency Preparedness Programs IR 05000298/19990091999-09-22022 September 1999 Insp Rept 50-298/99-09 on 990823-26.No Violations Noted. Major Areas Inspected:Radioactive Matl Processing & Shipping Programs & Occupational Radiation Safety Performance Indicator IR 05000298/19990081999-09-14014 September 1999 Insp Rept 50-298/99-08 on 990816-20.No Violations Noted. Major Areas Inspected:Access Authorization/Fitness-for-Duty (Behavior Observation) Program,Access Control of Personnel, Packages & Vehicles Into Protected & Vital Areas & PIs IR 05000298/19990061999-08-0909 August 1999 Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted. Major Areas Inspected:Inspectors Performed Partial Walkdown of high-pressure Coolant Injection Sys,Including Components Located in Sys Pump Room IR 05000298/19990021999-07-21021 July 1999 Insp Rept 50-298/99-02 on 990628-0702.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluation Operator IR 05000298/19990051999-06-16016 June 1999 Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000298/19990041999-05-19019 May 1999 Insp Rept 50-298/99-04 on 990321-0501.Non-cited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Status.Emergency Procedures Failed to Instruct Operators When to Reduce Core Spray Pump Flow Following DBA IR 05000298/19990011999-05-0505 May 1999 Insp Rept 50-298/99-01 on 990207-0320.Non-cited Violations Noted.Major Areas Inspected:Operations & Maint ML20204D9811999-03-18018 March 1999 Insp Rept 50-298/98-09 on 981227-990206.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980081999-01-22022 January 1999 Insp Rept 50-298/98-08 on 980115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199E1691999-01-0707 January 1999 Insp Rept 50-298/98-22 on 981116-1208.Violations Noted.Major Areas Inspected:Licensee Performance in Completing Engineering Strategy Action Item 3.2.e IR 05000298/19980151998-12-17017 December 1998 Insp Rept 50-298/98-15 on 980504-22 & 980608-26.Violations Noted.Major Areas Inspected:Safety Sys Engineering Insp Performed for Dgs,Vital Ac Eds & CR Emergency Filtration Sys IR 05000298/19980071998-12-11011 December 1998 Insp Rept 50-298/98-07 on 981004-1114.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980211998-10-29029 October 1998 Insp Rept 50-298/98-21 on 981005-09.No Violations Noted. Major Areas Inspected:Third 10-yr Interval Inservice Insp Program,Including GE Reactor Insp Sys Automated Ultrasonic Exams of Reactor Vessel Circumferential Weld IR 05000298/19980061998-10-21021 October 1998 Insp Rept 50-298/98-06 on 980823-1003.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Plant Support IR 05000298/19980201998-09-21021 September 1998 Insp Rept 50-298/98-20 on 980831-0904.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000298/19980051998-09-18018 September 1998 Insp Rept 50-298/98-05 on 980712-0822.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980041998-08-19019 August 1998 Errata to Insp Rept 50-298/98-04.Page 10 of Rept Was Inadvertently Omitted ML20237A6221998-08-10010 August 1998 Insp Rept 50-298/98-04 on 980531-0711.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980181998-06-30030 June 1998 Insp Rept 50-298/98-18 on 980518-21 & 0608-11.No Violations Noted.Major Areas Inspected:Reviewed Radiation Protection Activities Including Exposure Controls,Controls of Radioactive Matls & Contamination IR 05000298/19980031998-06-23023 June 1998 Insp Rept 50-298/98-03 on 980419-0530.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980161998-06-22022 June 1998 Insp Rept 50-298/98-16 on 980608-11.Weakness Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale Biennial Exercise of Emergency Plan & Implementing Procedures IR 05000298/19980191998-06-17017 June 1998 Cancelled Insp Rept 50-298/98-19.Open Items Insp That Was Assigned NRC Insp Rept 50-298/98-19 Will Be Combined W/ Engineering Insp Documented in NRC Insp Rept 50-298/98-15 IR 05000298/19980021998-06-11011 June 1998 Errata to Insp Rept 50-298/98-02,dtd 980515.Changes Have Been Made to Fourth Paragraph IR 05000298/19980171998-05-26026 May 1998 Insp Rept 50-298/98-17 on 980504-08.Violations Noted.Major Areas Inspected:Plant Support ML20247L2721998-05-15015 May 1998 Insp Rept 50-298/98-02 on 980308-0418.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980131998-04-17017 April 1998 Insp Rept 50-298/98-13 on 980406-09.No Violations Noted. Major Areas Inspected:Training & Qualifications,Quality Assurance Oversight,Facilities & Equipment,Procedural Guidance & Annual Repts IR 05000298/19980141998-04-17017 April 1998 Insp Rept 50-298/98-14 on 980406-09.No Violations Noted. Major Areas Inspected:Organization & Mgt Controls, Radioactive Effluent Monitoring & safety-related Air Cleaning Sys ML20216F8721998-04-14014 April 1998 Insp Rept 50-298/98-12 on 980316-19.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities & Equipment,Organization & Mgt Control,Training & Audits IR 05000298/19980111998-04-0909 April 1998 Cancelled Insp Rept 50-298/98-11.No Rept Will Be Issued W/Subj Number IR 05000298/19980011998-03-31031 March 1998 Insp Rept 50-298/98-01 on 980125-0307.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980101998-03-19019 March 1998 Insp Rept 50-298/98-10 on 980302-06.Violations Noted.Major Areas Inspected:Review of Access Authorization,Vehicle Access Control,Assessment Aids,Safeguards Event Logs,Plans & Procedures & Audit & self-assessment Programs IR 05000298/19970111998-02-23023 February 1998 Insp Rept 50-298/97-11 on 971214-980124.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19972011998-02-0505 February 1998 Insp Repts 50-298/97-201 on 971027-1121 & 1201-04.No Violations Noted.Major Areas Inspected:Rhr Sys & REC Sys ML20198L0471998-01-12012 January 1998 Insp Rept 50-298/97-10 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19970091997-12-19019 December 1997 Insp Rept 50-298/97-09 on 970921-1101.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19970191997-12-17017 December 1997 Insp Rept 50-298/97-19 on 971117-20.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring,Training & Qualifications,Qa Oversight,Facilities & Equipment IR 05000298/19970181997-12-17017 December 1997 Insp Rept 50-298/97-18 on 971020-1117.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000298/19970171997-12-10010 December 1997 Insp Rept 50-298/97-17 on 971117-20.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Evaluation IR 05000298/19970081997-10-20020 October 1997 Insp Rept 50-298/97-08 on 970810-0920.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000298/19970161997-10-0909 October 1997 Insp Rept 50-298/97-16 on 970915-24.Violations Noted.Major Areas Inspected:Follow Up on Licensee Planned & Implemented Activities Associated W/Erosion/Corrosion Monitoring Program & Open NRC Items IR 05000298/19970121997-10-0303 October 1997 Insp Rept 50-298/97-12 on 970708-0905.Violations Being Considered for Escalated Ea.Major Areas Inspected:Evaluation of Licensee Performance Re Recognizing Documenting & Correcting Conditions Adverse to Quality ML20154F2061997-09-19019 September 1997 Partially Withheld Insp Rept 50-298/97-15 on 970818-22 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Utilizing Technical Instruction 2515-132,dtd 960118 IR 05000298/19970131997-09-12012 September 1997 Insp Rept 50-298/97-13 on 970728-0814.Violation Noted.Major Areas Inspected:Surveillance Procedure IR 05000298/19970071997-09-0404 September 1997 Insp Rept 50-298/97-07 on 970629-0809.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000298/19970141997-08-27027 August 1997 Insp Rept 50-298/97-14 on 970804-08.No Violations Noted. Major Areas Inspected:Licensee FFD Program Utilizing IP 81502, FFD Program, ML20149K8881997-07-25025 July 1997 Insp Rept 50-298/97-06 on 970518-0628.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-27
[Table view] Category:UTILITY
MONTHYEARIR 05000298/19900331990-11-0606 November 1990 Insp Rept 50-298/90-33 on 900904-1016.Noncited Violation Identified.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance & Maint Observations, Review of Previously Identified Insp Findings IR 05000298/19900301990-09-27027 September 1990 Insp Rept 50-298/90-30 on 900827-31.Violations Noted.Major Areas Inspected:Licensee Water Chemistry & Radiochemistry Program,Including Water Chemistry & Radiochemistry Confirmatory Measurements IR 05000298/19900311990-09-26026 September 1990 Sys Entry & Retest Insp Rept 50-298/90-31 on 900910-14 & 17. No Violations Noted.Major Areas Inspected:Sys Entry Retest in Areas of Design Changes,Temporary Design Changes & Maint Activities IR 05000298/19900321990-09-14014 September 1990 Advises That Insp Rept 50-298/90-32 Canceled,Therefore,No Insp Rept Issued for Number IR 05000298/19900261990-08-0808 August 1990 Insp Rept 50-298/90-26 on 900616-0715.One Unresolved Item Identified.Major Areas Inspected:Operational Safety Verification,Monthly Maint & Surveillance Observations,Esf Walkdown & Onsite Followup of Written Repts IR 05000298/19900271990-07-20020 July 1990 Insp Rept 50-298/90-27 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected:Licensee Startup Testing Following Refueling & Followup on Corrective Actions for Violation & Deviation IR 05000298/19900201990-07-18018 July 1990 Insp Rept 50-298/90-20 on 900611-15 & 25-29.No Violations or Deviations Noted.Major Areas Inspected:Quality Verification Function,Including Corrective Action & Audit Programs IR 05000298/19900221990-06-30030 June 1990 Insp Rept 50-298/90-22 on 900516-0615.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance & Maint Observation,Onsite Followup of Written Repts & IE Notice Followup IR 05000298/19900181990-06-15015 June 1990 Insp Rept 50-298/90-18 on 900416-0515.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance Observation,Complex Surveillance,Monthly Maint Observation & LER IR 05000298/19890241989-09-0606 September 1989 Insp Rept 50-298/89-24 on 890731-0804.Deviations Noted.Major Areas Inspected:Triennial post-fire Safe Shutdown Capability Reverification & Assessment & Implementation of Fire Protection Program IR 05000298/19890271989-09-0505 September 1989 Insp Rept 50-298/89-27 on 890821-25.No Violations Noted. Major Areas Inspected:Surveillance Procedures & Records IR 05000298/19890261989-08-28028 August 1989 Partially Withheld Insp Rept 50-298/89-26 on 890717-21 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Plan & Procedures,Mgt Effectiveness,Audits,Testing & Maint & Alarms IR 05000298/19890301989-08-24024 August 1989 Insp Rept 50-298/89-30 on 890807-11.Violation Noted.Major Areas Inspected:Qa Program Re Document Control IR 05000298/19890281989-08-18018 August 1989 Insp Rept 50-298/89-28 on 890731-0804.Violations Noted.Major Areas Inspected:Implementation of ATWS Requirements & Licensee Actions on Findings of Previous Insps ML20246G3441989-08-15015 August 1989 Insp Rept 50-298/89-25 on 890701-31.Violation Noted.Major Areas Inspected:Previously Identified Items,Ler Followup, Operational Safety Verification & Monthly Surveillance & Maint Observation IR 05000298/19890211989-07-26026 July 1989 Insp Rept 50-298/89-21 on 890626-30.No Violations or Deviations Noted.Major Areas Inspected:Licensee Liquid, Gaseous & Solid Radwaste Sys IR 05000298/19890221989-07-20020 July 1989 Insp Rept 50-298/89-22 on 890601-30.Violations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance & Maint Observations & Onsite Followup of Events IR 05000298/19890231989-07-20020 July 1989 Insp Rept 50-298/89-23 on 890626-30.No Violations or Deviations Noted.Major Areas Inspected:Plant Mods & Licensed Operator Training Program IR 05000298/19890181989-06-15015 June 1989 Insp Rept 50-298/89-18 on 890416-0531.Violations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance & Maint Observations,Installation & Testing of Mods & Refueling Activities ML20244C8001989-06-0202 June 1989 Insp Rept 50-298/89-19 on 890501-05 & 15-19.Violation Noted. Major Areas Inspected:Licensee Actions in Response to NRC Requirements for Motor Operated Valve Testing & Programs for Instrument Calibr & Piping Supports ML20244C9491989-06-0202 June 1989 Insp Rept 50-298/89-16 on 890501-05.Violations Noted.No Deviations Noted.Major Areas Inspected:Selected Areas of Radiation Protection Program as Set Forth in Core Insp Program,As Related to Outage Activities IR 05000298/19890201989-05-25025 May 1989 Reactive Insp Rept 50-298/89-20 on 890515-19.No Violations or Deviations Noted.One Weakness Identified.Major Areas Inspected:Commitments Made Re Facility Welding Program Enhancements IR 05000298/19890171989-05-15015 May 1989 Insp Rept 50-298/89-17 on 890501-05.Violations Noted.Major Areas Inspected:Action on Previously Identified Insp Findings,Inservice Insp & Welding IR 05000298/19890111989-05-0909 May 1989 Insp Rept 50-298/89-11 on 890301-15.No Violations Noted. Major Areas Inspected:Plant Status,Followup of Lers, Operational Safety Verification,Monthly Surveillance & Maint Observations,Balance of Plant Insp & QA Implementation IR 05000298/19890151989-04-27027 April 1989 Insp Rept 50-298/89-15 on 890410-14.Violations Noted.Major Areas Inspected:Welding Activities IR 05000298/19890101989-04-21021 April 1989 Insp Rept 50-298/89-10 on 890327-31.No Violations or Deviations Noted.Major Areas Inspected:Selected Areas in Radiation Protection Program as Set Forth in Core Insp Program (83750) IR 05000298/19890131989-04-12012 April 1989 Insp Rept 50-298/89-13 on 890327-30.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions Resulting from NRC Info Notice 86-053 Re Improper Installation of Heat Shrinkable Tubing at Nuclear Plants IR 05000298/19890031989-04-10010 April 1989 Insp Rept 50-298/89-03 on 890213-17.Violations Noted.Major Areas Inspected:Unresolved Items from Safety Sys Functional Insp,Including Emergency Electrical Sys,Auxiliary Support Sys & Other Related Issues IR 05000298/19890071989-03-14014 March 1989 Insp Rept 50-298/89-07 on 890206-28.Violation Noted.Major Areas Inspected:Followup of Previously Identified Insp Findings,Operational Safety Verification & Monthly Surveillance & Maint Observations IR 05000298/19880321989-03-0707 March 1989 Informs That Insp Rept 50-298/88-32 Cancelled,Therefore No Insp Rept Will Be Issued for Rept ML20246H4661989-03-0101 March 1989 Partially Withheld Insp Rept 50-298/89-06 on 890206-10 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program Including,Mgt Support,Security Program Plan & Audits & Protected Area Physical Barriers IR 05000298/19890051989-03-0101 March 1989 Insp Rept 50-298/89-05 on 890123-27 & 0206-10.Violation Noted.Major Areas Inspected:Action on Previously Identified Insp Findings & Licensee self-assessment Capability ML20235Y7271989-02-28028 February 1989 Insp Rept 50-289/89-09 on 890213-16.Potential Violation Noted.Major Areas Inspected:Diesel Generator Air Sys Failures IR 05000298/19890081989-02-28028 February 1989 Insp Rept 50-298/89-08 on 890215-17.No Violations or Deviations Noted.Major Areas Inspected:Operational Status of Emergency Preparedness Program,Including Changes to EPIPs & Changes to Emergency Facilities,Equipment & Instrumentation ML20235T8481989-02-27027 February 1989 Insp Rept 50-298/89-02 on 890123-27.Violation Noted.Major Areas Inspected:Engineering & Technical Support Capabilities & Activities IR 05000298/19890041989-02-23023 February 1989 Insp Rept 50-298/89-04 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste & Radioactive Matls Transportation Programs ML20235R7661989-02-23023 February 1989 Insp Rept 50-298/89-01 on 890101-0205.Deviation Noted.Major Areas Inspected:Plant Status,Operational Safety Verification,Monthly Surveillance & Maint Observations & Safety Sys Walkdown IR 05000298/19880271988-11-30030 November 1988 Insp Rept 50-298/88-27 on 881024-28.Violation Noted.Major Areas Inspected:Licensee Chemistry/Radiochemistry Program & Water Chemistry & Radiochemistry Confirmatory Measurements ML20206L7931988-11-15015 November 1988 Insp Rept 50-298/88-31 on 881001-31.Violations Noted.Major Areas Inspected:Followup of Plant Events,Operational Safety Verification,Access Control,Monthly Surveillance & Maint Observations & Emergency Excercise ML20206K5921988-11-14014 November 1988 Insp Rept 50-298/88-29 on 881017-20.No Violations or Deviations Noted.Major Areas Inspected:Licensee Performance & Capabilties During Annual Exercise of Emergency Plan & Procedures ML20206A6431988-11-0707 November 1988 Insp Rept 50-298/88-24 on 880912-23.Violation & Unresolved Item Noted.Major Areas Inspected:Followup of Previous Insp Findings,Onsite Review Committee,Offsite Review Committee & Equipment Qualification/Seismic Design of Agastat Relays, IR 05000298/19880281988-10-19019 October 1988 Insp Rept 50-298/88-28 on 880901-30.Violations Noted.Major Areas Inspected:Ler Followup,Transportation,Facility Mods, Operational Safety Verification & Monthly Surveillance & Maint Observations IR 05000298/19880261988-10-18018 October 1988 Insp Rept 50-298/88-26 on 880606-0921.Violations Noted. Major Areas Inspected:Licensee Actions on Previously Identified Items Re Equipment Qualification IR 05000298/19880251988-09-12012 September 1988 Insp Rept 50-298/88-25 on 880801-31.No Violations Noted. Major Areas Inspected:Info Notices Followup,Operational Safety Verification,Monthly Surveillance & Maint, Observations,Esf Walkdown & Security IR 05000298/19882001988-09-0606 September 1988 Insp Rept 50-298/88-200 on 880627-0715.No Violations Noted. Major Areas Inspected:Review of Emergency Operating Procedures Validation & Verification Program,Training Program & Walk Down in Control Room & Plant IR 05000298/19880231988-08-0808 August 1988 Insp Rept 50-298/88-23 on 880705-31.No Violations Noted. Major Areas Inspected:Ler Followup,Operational Safety Verification,Monthly Surveillance & Maint Observations, Radiological Protection & Security IR 05000298/19880211988-08-0505 August 1988 Insp Rept 50-298/88-21 on 880620-24 & 880711-15.No Violations or Deviations Noted.Major Areas Inspected:Action on Previous Insp Findings & Licensee Implementation of Inservice Testing Program for Pumps & Valves ML20151V1821988-08-0303 August 1988 Insp Rept 50-298/88-22 on 880705-08.No Violations Noted. Major Areas Inspected:Assessment Aids,Contingency Plan Implementation & Matl Control & Accountability.Details Withheld (Ref 10CFR2.790) IR 05000298/19880191988-08-0303 August 1988 Insp Rept 50-298/88-19 on 880613-17.No Violations or Deviations Noted.Major Areas Inspected:Nonlicensed Staff Training,Qa Annual Review (Procurement,Receipt Insp & Audits) & Licensee Actions on Previous Concerns ML20151Q9141988-07-15015 July 1988 Insp Rept 50-298/88-20 on 880601-0704.Violations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance & Maint Observations.Esf Walkdown,Ie Bulletin 88-005 Followup,Radiological Protection & Security 1990-09-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000298/19990121999-10-22022 October 1999 Insp Rept 50-298/99-12 on 990927-30.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program & Included Review of Emergency Preparedness Performance Indicators IR 05000298/19990101999-10-14014 October 1999 Insp Rept 50-298/99-10 on 990920-24.No Violations Noted. Major Areas Inspected:Radiological Environ & Meteorological Monitoring Programs & Program for Unrestricted Release of Matl from Radiological Controlled Area IR 05000298/19990031999-10-0808 October 1999 Insp Rept 50-298/99-03 on 990823-27 & 990907-10.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000298/19990071999-09-27027 September 1999 Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Implementation of Reactor Safety & Emergency Preparedness Programs PNO-IV-99-040, on 990924,licensee Was Replacing Motor Operator for Suction Valve on B Recirculation Loop.After Completing Repairs,Operators Plan to Restart Reactor.Info Has Been Discussed with Licensee1999-09-24024 September 1999 PNO-IV-99-040:on 990924,licensee Was Replacing Motor Operator for Suction Valve on B Recirculation Loop.After Completing Repairs,Operators Plan to Restart Reactor.Info Has Been Discussed with Licensee IR 05000298/19990091999-09-22022 September 1999 Insp Rept 50-298/99-09 on 990823-26.No Violations Noted. Major Areas Inspected:Radioactive Matl Processing & Shipping Programs & Occupational Radiation Safety Performance Indicator IR 05000298/19990081999-09-14014 September 1999 Insp Rept 50-298/99-08 on 990816-20.No Violations Noted. Major Areas Inspected:Access Authorization/Fitness-for-Duty (Behavior Observation) Program,Access Control of Personnel, Packages & Vehicles Into Protected & Vital Areas & PIs IR 05000298/19990061999-08-0909 August 1999 Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted. Major Areas Inspected:Inspectors Performed Partial Walkdown of high-pressure Coolant Injection Sys,Including Components Located in Sys Pump Room IR 05000298/19990021999-07-21021 July 1999 Insp Rept 50-298/99-02 on 990628-0702.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluation Operator IR 05000298/19990051999-06-16016 June 1999 Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000298/19990041999-05-19019 May 1999 Insp Rept 50-298/99-04 on 990321-0501.Non-cited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Status.Emergency Procedures Failed to Instruct Operators When to Reduce Core Spray Pump Flow Following DBA IR 05000298/19990011999-05-0505 May 1999 Insp Rept 50-298/99-01 on 990207-0320.Non-cited Violations Noted.Major Areas Inspected:Operations & Maint ML20204D9811999-03-18018 March 1999 Insp Rept 50-298/98-09 on 981227-990206.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19993011999-03-0909 March 1999 NRC Operator Licensing Exam Rept 50-298/99-301 (Including Completed & Graded Tests) for Tests Administered on 990212. Exam Results:Four Reactor Operator License Applicants Passed Exam IR 05000298/19980081999-01-22022 January 1999 Insp Rept 50-298/98-08 on 980115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20202E3261999-01-22022 January 1999 Notice of Violation from Insp on 981115-1226.Violation Noted:Licensee Failed to Take Effective Measures to Preclude Repetition of Inadvertent Opening of torus-to-drywell Vacuum Breaker Documented in LER 50-298/97-007 IR 05000298/19960041999-01-0707 January 1999 Notice of Violation from Insp on 981116-1208.Violation Noted:Deviations from Plant Design Basis Identified as Result of Investigation Following Issuance of Violation 50-298/9604-1013 Not Properly Corrected ML20199E1691999-01-0707 January 1999 Insp Rept 50-298/98-22 on 981116-1208.Violations Noted.Major Areas Inspected:Licensee Performance in Completing Engineering Strategy Action Item 3.2.e IR 05000298/19980151998-12-17017 December 1998 Insp Rept 50-298/98-15 on 980504-22 & 980608-26.Violations Noted.Major Areas Inspected:Safety Sys Engineering Insp Performed for Dgs,Vital Ac Eds & CR Emergency Filtration Sys ML20198J3531998-12-17017 December 1998 Notice of Violation from Insp on 980504-22 & 0608-26. Violation Noted:As of October 1997,licensee Failed to Provide Procedures to Implement Compensatory Measures for Standby Liquid Control Tank Heater Failure,Per USAR ML20197J7321998-12-11011 December 1998 Notice of Violation from Insp on 981004-1114.Violation Noted:On 981001,inspectors Identified That Between 980125- 980125 & 0916,licensee Failed to Properly Maintain Procedures Governing Operation of Reactor Equipment Cooling IR 05000298/19980071998-12-11011 December 1998 Insp Rept 50-298/98-07 on 981004-1114.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980211998-10-29029 October 1998 Insp Rept 50-298/98-21 on 981005-09.No Violations Noted. Major Areas Inspected:Third 10-yr Interval Inservice Insp Program,Including GE Reactor Insp Sys Automated Ultrasonic Exams of Reactor Vessel Circumferential Weld IR 05000298/19980061998-10-21021 October 1998 Insp Rept 50-298/98-06 on 980823-1003.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Plant Support IR 05000298/19980201998-09-21021 September 1998 Insp Rept 50-298/98-20 on 980831-0904.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000298/19980051998-09-18018 September 1998 Insp Rept 50-298/98-05 on 980712-0822.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980041998-08-19019 August 1998 Errata to Insp Rept 50-298/98-04.Page 10 of Rept Was Inadvertently Omitted IR 05000298/19980991998-08-17017 August 1998 SALP Rept 50-298/98-99 for Cooper Nuclear Station for Period of 970112-980711 ML20237A6221998-08-10010 August 1998 Insp Rept 50-298/98-04 on 980531-0711.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980181998-06-30030 June 1998 Insp Rept 50-298/98-18 on 980518-21 & 0608-11.No Violations Noted.Major Areas Inspected:Reviewed Radiation Protection Activities Including Exposure Controls,Controls of Radioactive Matls & Contamination IR 05000298/19980031998-06-23023 June 1998 Insp Rept 50-298/98-03 on 980419-0530.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 07100022/20120311998-06-23023 June 1998 Notice of Violation from Insp on 980419-0530.Violation Noted:No Explanation Was Included in Subsequent Annual Radioactive Matls Release Rept & Condition Was Not Repaired in Timely Manner from 971022-1231 IR 05000298/19980161998-06-22022 June 1998 Insp Rept 50-298/98-16 on 980608-11.Weakness Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale Biennial Exercise of Emergency Plan & Implementing Procedures IR 05000298/19980191998-06-17017 June 1998 Cancelled Insp Rept 50-298/98-19.Open Items Insp That Was Assigned NRC Insp Rept 50-298/98-19 Will Be Combined W/ Engineering Insp Documented in NRC Insp Rept 50-298/98-15 IR 05000298/19980021998-06-11011 June 1998 Errata to Insp Rept 50-298/98-02,dtd 980515.Changes Have Been Made to Fourth Paragraph ML20249C2481998-05-26026 May 1998 Notice of Violation from Insp on 980504-08.Violation Noted: on 980506,inspector Observed Group of Visitors Enter Protected Area That Were Not Issued Visitor Badges,Did Not Card in & Did Not Enter Protected Area Through Turnstiles IR 05000298/19980171998-05-26026 May 1998 Insp Rept 50-298/98-17 on 980504-08.Violations Noted.Major Areas Inspected:Plant Support ML20247L2451998-05-15015 May 1998 Notice of Violation from Insp on 980308-0418.Violation Noted:Procedure 7.2.63 Was Inappropriate to Circumstances & Had No Appropriate Acceptance Criteria,In That Required Torque Value Not Given in Flange Bolt Work Instructions ML20247L2721998-05-15015 May 1998 Insp Rept 50-298/98-02 on 980308-0418.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980141998-04-17017 April 1998 Insp Rept 50-298/98-14 on 980406-09.No Violations Noted. Major Areas Inspected:Organization & Mgt Controls, Radioactive Effluent Monitoring & safety-related Air Cleaning Sys IR 05000298/19980131998-04-17017 April 1998 Insp Rept 50-298/98-13 on 980406-09.No Violations Noted. Major Areas Inspected:Training & Qualifications,Quality Assurance Oversight,Facilities & Equipment,Procedural Guidance & Annual Repts ML20216F8721998-04-14014 April 1998 Insp Rept 50-298/98-12 on 980316-19.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities & Equipment,Organization & Mgt Control,Training & Audits IR 05000298/19980111998-04-0909 April 1998 Cancelled Insp Rept 50-298/98-11.No Rept Will Be Issued W/Subj Number IR 05000298/19980011998-03-31031 March 1998 Insp Rept 50-298/98-01 on 980125-0307.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20217A3681998-03-19019 March 1998 Notice of Violation from Insp on 980302-06.Violation Noted:On Five Separate Occasions,Licensee Mgt Called in Workers to Perform Back Shift Work W/O Providing Transportation or Administering Breathalyser Test IR 05000298/19980101998-03-19019 March 1998 Insp Rept 50-298/98-10 on 980302-06.Violations Noted.Major Areas Inspected:Review of Access Authorization,Vehicle Access Control,Assessment Aids,Safeguards Event Logs,Plans & Procedures & Audit & self-assessment Programs IR 05000298/19970111998-02-23023 February 1998 Insp Rept 50-298/97-11 on 971214-980124.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203F8751998-02-23023 February 1998 Notice of Violation from Insp on 971214-980124.Violation Noted:On 971222,while MSL High RM Was Inoperable & Primary Containment Integrity Was Required,Licensee Opened Both Reactor Water Sample Valves IR 05000298/19972011998-02-0505 February 1998 Insp Repts 50-298/97-201 on 971027-1121 & 1201-04.No Violations Noted.Major Areas Inspected:Rhr Sys & REC Sys ML20198L0391998-01-12012 January 1998 Notice of Violation from Insp on 971102-1213.Violation Noted:As of 971213,Procedure 6.SC.502,Rev 2,was Not Appropriate to Circumstances in That Did Not Include Appropriate Acceptance Criteria 1999-09-27
[Table view] |
See also: IR 05000298/1986036
Text
--
g .~
. .
APPENDIX B
U. S. NUCLEAR-REGULATORY COMMISSION
REGION IV
NRC Inspection Report: 50-298/86-36 License: DPR-46
Docket: 50-298
Licensee: Nebraska Public Power District (NPPD)
P. O. Box 499
Columbus, NE 68601 -
Facility Name: Cooper Nuclear Station (CNS)
Inspection At: Cooper Nuclear Station, Nemaha County, Nebraska
Inspection Conducted: December 1-31, 1986
Inspectors: N- M //sa.//7
E. A. Plettner,- Resident inspector, (RI) Ddte'
%$O6
D. L. DuBois, Senior Resident Inspcctor, (SRI)
V/W27
Date-
,
/
Approved: / b
J/P/ Jaud i, Chief, P 'oject Section A,
/)
Ddte (
,
@ abtor oject Branch
h
p 8 -
. .
2
'
Inspection Summary
Inspection Conducted December 1-31, 1986 (Report 50-298/86-36)
Areas Ins)ected: Routine, unannounced inspection of complex surveillance,
reactor slutdown margin,: core thermal power evaluation, core power
distribution limits surveillance, calibration of nuclear instruments,
refueling, cold weather preparation, operational safety verification, and
monthly surveillance and maintenance activities.
Results: Within the areas inspected, two violations were identified (failure
to have documented procedure evaluation, paragraph 6; and failure to follow
procedure, paragraph 7).
!
.
1
i
4
- _. . _ - - .- .. -
,
l
3
DETAILS
1. Persons Contacted
Principal Licensee Employees
>
- G. R. Horn, Division Manager of Nuclear Operations
- W.' E. Crawford, Supervisor, Maintenance
- J. Sayer, Manager, Radiation Protection
- C, R. Goings, Regulatory Compliance Specialist
- D. C. Shrader, Assistant Supervisor, Operations
- H. A. Jantzen, Supervisor, Instrumentation and Control
- C. R. Moeller, Supervisor, Technical Staff
- G. Smith, Acting Manager. Quality Assurance
' The NRC inspectors also interviewed other licensee employees during the
course of the inspection.
,
- Denotes those present during exit interview January 12, 1987.
2. Complex Surveillance
The purpose of this inspection was to verify that complex surveillance
tests, applicable to safety-related systems and subsystems, were
performed in accordance with the requirements established in the CNS
}
Operating License'and Technical Specifications.
! The RI observed the performance of the following procedures on the
indicated dates:
'
. December 30, 1986: Surveillance Procedure (SP) 6.3.4.3 "CS, RHR,
and Diesel Auto Start and Loading," Revision 21 dated August 22,
1985;
. December 31, 1986 and January 1,1987: General Operating Procedure ,
. (GOP) 2.1.14 " Reactor Vessel In-Service Leak Test," Revision 16,
dated April 3, 1986.
Reviews and observations verified that:
. Testing was performed using approved procedures, which were
consistent with regulatory requirements, industry standards, and the
Technical Specification.
- . Pennanent or temporary procedure revisions were accomplished
according to administrative requirements and controls.
. Qualified personnel conducted the tests and performed the final
4 reviews and opprovals of completed test data.
4
I
- ,__. , . . _ . , _ , _ _ - _ _ _ _ . _ _ _ _ _ - . . _ _ _ _ _ - . _ , , _ _ _ , , , . _ _ . , , _ _ _ . _ _ _ _ _ , . _ _ _ _ _ , . - _ _ _ _ _ _ _ _ , - _ _ , . _ _ _ _ , , _ _ , _
. -
. .
4
. The official test copy was available and used by test personnel.
. Procedures contained the purpose, objectives, references,
prerequisites, test equipment, precautions, limitations, and
acceptance criteria.
. Test equipment required by the procedures was calibrated and in
service.
. Procedures provided sufficient direction to accomplish necessary
evolutions.
. Systems were returned to normal lineup following completion of
testing.
The requirements for the diesel generator sequential loading are stated
in the Updated Safety Analysis Report (USAR) in Section VIII Part 5.0.
" Standby-A-C Power Source." The NRC inspectors performed a comparative
review of Procedure SP 6.3.4.3 with the requirements in the USAR.
From the review it was determined that the procedure may not meet all the
requirements as stated in the USAR in Section VIII, Part 5.0. The NRC
inspectors are waiting on information from the licensee to the following
questions:
. Are Motor Control Centers (MCC) K and S part of the load shed and
load sequencing on the IF for K or 1G for S emergency switch gear
buses?
. Are there time delays associated with the starting of the Standby
Gas Treatment fans which receive their power from MCC K for train A
or MCC S for train B?
. When is the less than or equal to 10 second timing requirement for
the diesel to start and attain rated voltage and frequency
applicable; I.E. monthly or once per cycle?
It was noted that the current SP 6.3.4.3 does not time the diesel from
start until it has attained rated voltage and frequency. Instead, the
procedure times the period from diesel start to output breaker closing.
USAR allows a three-second delay in the typical sequential loading of
diesel generator (DG) from the time the diesel attains rated voltage and
frequency until the output breaker closes. SP 6.3.12.1, performed
monthly, requires that the start time be recorded with a stop watch but
has no acceptance criteria stated in the procedure.
Pending receipt of additional information from the licensee, these
questions will be considered to be an unresolved item (298/8626-01).
. _ __ .- _.
-
. .
5-
4
On December 29, 1986, SP 6.3.4.3 was conducted twice. The first test was
conducted by tripping breaker IFA from Board C instead of deenergizing
,
undervoltage relays 27/1F2 and 27/1FA2 as specified by SP 6.3.4.3,
Step VIII.A.19. However,-the remainder of the test was conducted as
required, and DG No. I started and loaded properly. The second test was
run as specified in the procedure and demonstrated the proper response to
a simulated undervoltage condition (i.e., diesel generator automatic
start).
This is an apparent violation of failure to adhere to procedure. A
notice of violation will not be issued, since the violation was
I self-identified by the licensee, and it meets the remaining four criteria
stated in Appendix C,Section V.A of 10 CFR Part 2.
<
One unresolved item was identified in this area.
) 3. Reactor Shutoown Margin
On December 21, 1986, the RI observed the performance of liuclear
Performance Procedure (NPP) 10.16. " Shutdown Margin Evaluation,"
Revision 14, dated October 16, 1986. Included were checks to ensure that
, test prerequisites were completed, testing was performed according to
'
procedures, appropriate precautions and limitations were observed, and
test results were adequately reviewed for accuracy and completeness. The 1
RI also reviewed GE supplied nuclear engineering data, which was used to
4
determine the sequence of rod withdrawals, expected reactivity addition
rates, and predicted shutdown margin values. The RI verified that test
..
results conformed with Technical Specification requirements. -
No violations or deviations were found in this area.
4. Core Thermal Power Evaluation
3
The RI reviewed licensee records, data sheets, and procedures applicable
to reactor core thermal power evaluation and performance which were
- conducted during the period June 1 through October 3,1986. The RI
verified the following:
! . Procedure prerequisites were met prior to performing the core
- thermal power evaluations.
,
. Figures and curves corresponding to specific reactor conditions were
interpreted properly and recorded on data forms.
1
. Calculations were correct.
{
- . The evaluation frequency met CNS Technical Specification
- requirenents.
l
!
,
.
-- - .- . - - . - - - .- .- ... -
p -
. .
6
J
The following CNS procedures were reviewed:
. Nuclear Performance Procedure (NPP) 10.1, "APRM Calibrations,"
Revision 16, dated October 30, 1986
-
. NPP 10.2, "IRM Power Calibration," Revision 11, dated May 11, 1984
. NPP 10.3, " Core Thermal Power Evaluation," Revision 7, dated
October 31, 1986
. NPP 10.5, "LPRM Calibration," Revision 17, dated January 25, 1985
The reviews were conducted to verify that CNS is operated within the
licensed core thermal power limits.
No violations or deviations were identified in this area.
5. Core Power Distribution Limits Surveillance
The RI conducted discussions with CNS reactor engineers and operations
department personnel, reviewed records and data applicable to core
thermal limits, and verified that appropriate corrective actions were
taken when core thennel data indicated an approach to limiting
conditions. The review and discussions included the following:
. Verificationthatthelinearheatgenerationrate(LHGR), core
maximumpeakingfactors(CMPF),minimumcriticalpowerratio(MCPR),
and average planar linear heat generation rate (APLHGR), were within
prescribed Technical Specification limits.
. Examinations of local power range monitor (LPRM) and BASE
distribution calculations as typed out by the 00-1, "LPRM
Calibration and Base Data," on-demand typewriter. Typed alarms,
errors, and other inprocess messages were also reviewed.
. Verification that traversing incore probe (TIP) machine
normalization factors were properly obtained.
. Examination of licensee procedures for ascertaining operation within
licensed limits, should the process computer becorre unavailable.
. Verification that average power range monitor (APRM) channel gains
were adjusted as necessary following an LPRM calibration.
. Verification that following an APRM gain adjustment, a subsequent
P-1 was run to assure that APRM gain adjustment factor (GAF)
reflected such gain adjustments.
. Examination of licensee procedures which are used to correct
abnormal core thermal conditions.
.
<
9 s
7
The following computer printouts edited from June 1 to October 3,1986,
were reviewed:
. 00-1, "LPRM Calibration and BASE Data"
. 0D-3, " Core Thermal Power and APRM Calibration"
. 00-6, " Thermal Data for Specified Fuel Bundles"
. 00-7, " Control Rod Notch Positions"
. 00-8, "LPRM Console Readings"
. 00-10. " Edit Specified Data Array"
. OD-15. " Computer Shutdown and Outage Recovery Monitor"
. 00-16. " Target Exposure and Power Data"
. 00-17 " Edit Periodic Core Perfomance Logs"
. P-1, " Periodic Core Performance"
The following CNS procedures were reviewed:
. NPP 10.4, " Core Thermal Hydraulic Evaluation " Revision 8, dated
April 24, 1986
. NPP 10.7, " Maximum dverage Planar and Peak Linear Heat Generation i
Rates and Minimum Critical Power Ratio," Revision 8, dated '
October 30, 1986
. NPP 10.8, " Reactivity follow Check," Revision 9, dated October 18,
1984
. NPP 10.9, " Control Rod Scram Time Evaluation," Revision 13, dated
November 6,1986
. NPP 10.10. " Limiting Control Rod Pattern Determination,"
Revision 7, dated January 21, 1985
. NPP 10.11. " Control Rod Sequence Exchange," Revision 8, dated
October 30, 1986
. NPP 10.13. " Control Rod Sequence and Movement Control," Revision 13,
dated October 30, 1986
The reviews and discussions were conducted to verify that the plant is
being operated within licensed power distribution limits.
No violations or deviations were identified in this area.
. .
.
8
6. Calibration of Nuclear Instruments
The purpose of the inspection was to determine that Source Range
Monitors, (SRM), Intermiate Range Monitors (IRM), local Power Range
Monitors (LPRM),andAveragePowerRangeMonitors(APRM)hadbeen
properly calibrated in accordance with approved procedures and met the
calibration frequency required by Technical Specification.
The RI reviewed the results of SRM, IRM, LPRM, and APRM calibrations to
verify the following:
. All precautions and prerequisites were met.
. Power supply voltages were all within tolerance.
. The instruments and calibration equipment used were traceable to the
National Bureau of Standards.
. Test equipments used and their serial numbers were recorded on the
procedure.
. Licensee's procedures ensure that the setpoint levels for alarms,
permissive and prchibitive interlocks are in compliance with the
appropriate Technical Specifications.
. Calibration results were reviewed, approved, and documented in
accordance with the licensee's administrative control procedures.
The RI reviewed the following procedures:
. SP 6.1.3, "APRM System Excluding 15% Trip Functional Test," Revision
15, dated September 18, 1966.
. SP 6.1.17, "IRM Calibration and Functional Test, (Mode Switch not In
Run)," Revision 10, dated August 8, 1985.
. SP6.1.17A,"IRMCalibrationandFunctionalTest(ModeSwitchIn
Run)," Revision 3, dated May 22, 1982
. SP 6.1.19. "LPRM Calibration Test," Revision 7, dated March 21, 1986
. SP6.1.21,"SRMCalibrationandFunctionalTest(ReactorNotIn
Run)," Revision 14 dated October 8,1984
. SP6,1,21A,"SRMCalibrationandFunctionaltest(ReactorInRun),"
Revision 6, dated October 10, 1984
. SP 6.1.22. "APRM System 15% High Flux and Inop Trip Functional Test,"
,
Revision 11, dated September 11, 1986
.,
. . .
. .
9
. SP 6.1.29, "APRM System (Flow Bias and Startup) Calibration and/or
Functional Test," Revision 14, dated January 6,1986
The RI performed an audit of calibration data, Attachments "A," of the
following procedures for the time frame of September 1985 to
December 1986:
1
. Instrument and Control Procedure (I&C) 7.5.2.1, "SRM Quarterly l
Calibration Procedure," Revision 13, dated October 30, 1986. '
. I&C 7.5.2.2, "IRM Calibration Procedure," Revision ll, dated
October 30, 1986
. I&C 7.5.2.3, "LPRM Calibration Procedure," Revision 11, dated
April 10, 1986
. I&C 7.5.2.4, "APRM Calibration Procedure," Revision 12, dated
June 19, 1986 ,
,
The results of the audit revealed that the " reviewed by" signature blank
and associated "date" blank had not been completed on the following:
. 4 times in I&C 7.5.2.1 Procedure, Attachment "A"
. 2 times in I&C-7.5.2.4 Procedure, Attachment "A"
Appendix B Criterion XI to of 10 CFR Part 50 and the Licensee's Quality
Assurance Plan require that test results shall be documented and
evaluated to assure that test requirements have been satisfied. The
failure to document the review of Attachments "A" in the above
procedures is an apparent violation (298/8636-02).
One violation was identified in this area.
[ 7. Refueling
The RI held discussions with fuel handling personnel, observed fuel
movement from the reactor to the spent fuel pool, verified spent fuel
pool fuel assemblies locations, accountability records, and status board
updates. The RI also reviewed the licensee's procedures and records
concerning the movement of fuel and storage of fuel assemblies.
On December 16, 1986, the RI observed the following fuel movement
activities:
STEP FUEL BUNDLE NO. FROM TO
434 LY2089 11-C-11 41-28
435 LY2034 11-B-10 43-26
438 LY2120 11-H-10 41-26
_
7
._
,
e a
!
10
439 LY2079 11-G-11 43-28
440 LYD808 12-M-11 41-30
441 LYD802 12-I-12 43-32
On December 12, 1986, at 2:20 p.m. refueling activities started.
~
On December 16, 1986, the RI performed a review of procedures being used
on the refueling floor. The results of the review revealed that Nuclear
Performance Procedure (NPP) 10.25 " Refueling," was Revision 6, dated
. August 7, 1986. The latest issued revision of Procedure HPP 10.25 was
Revision 7, dated Decenber 10, 1986. Procedure NPP 10.25 in
Section VII.A.2 requires the licensee to verify that the procedures in the
operations refueling floor procedure book are of the latest revision and
update as necessary.
The licensee's failure to verify that the procedure NPP 10.25 in the
operations refueling floor procedure book was of the latest revision as
required by procedure NPP 10.25 is an apparent violation (298/8636-03).
The R1 reviewed Report G-HP0-6-424, dated December 3,1986, which General
Electric (GE) sent to the licensee. The report addressed the impact and
lost parts analysis for the double blade quide problem discussed in NRC
Inspec_ tion Report 50-298/86-26, paragraph 6. The GE report concluded:
. The falling blade guide has caused no structural damage to either
the fuel bundles or core top guide lissembly.
. The lost pieces of the aluminum blade guide handle in the reactor
pressure vessel would not compromise safe reactor operation.
No further action is required.
One violation was identified in this area.
8. Cold Weather Preparation
IE Bulletin 79-24, " Frozen Lines," requested the licensee to verify that
adequate protective measures had been taken to prevent safety-related
process, instrument, and sampling lines from freezing during extremely
cold weather. The RI verified the following:
. Individual plant systems operating procedures identified heating
requirements and equipment including power supplies, temperature
controls and settings, indication circuits, insulation requirements,
heat tracing, and space heaters as required.
. Backup freeze protection was provided during extended plant shutdown
in areas that are normally kept warm by heat losses from operational
systems.
e
. .
11
. ~ Plant procedures used during maintenance or modification of existing
systems provided reasonable assurance that cold weather protective
measures were reestablished following completion of those
activities.
. Plant preventive maintenance requirements associated with cold
weather preparation were completed on September 17, 1986. ,
'
The following documents were reviewed:
. Preventive Maintenance (PM) routine 04047 and 01271
. General Operating Procedure (G0P) 2.1.11, " Station Operators Tour,"
Revision 39, dated October 30, 1985.
. Attachment "C" to G0P 2.1.11. " Station Operators Tour - R/W, A0G,
ARW Areas and Outside."
. System Operating Procedure (SOP) 2.2.30, " Fire Protection System,"
Revision 24, dated October 17, 1985.
The discussions, reviews, and walkdowns were performed to verify that the
licensee has maintained an effective program of cold weather protective
measures for safety-related components and systems.
No violations or deviations were identified.in this area.
9. Operational Safety Verification
The NRC inspectors observed control room operations, instrumentation,
controls, reviewed plant logs and records, conducted discussions with
control room personnel, and performed system walkdowns to verify that:
. Minimum shift manning requirements were met.
. Technical Specification requirements were observed.
. Plant operations were conducted using approved procedures.
. Plant logs and records were complete, accurate, and indicative of
actual system conditions and configurations.
. System pumps, valves, control switches, and power supply breakers
were properly aligned.
. Licensee systems lineup procedures / checklists, plant drawings, and
as-built configurations were in agreement.
. Instrumentation was accurately dis alaying process variables and
protection system status to be wit 11n permissible operational limits
for' operation.
-
. .
'
f
.
'
, s i
12 ,
1
1
'
< /I
. When plant equipment was found to be inoperable or when equipment
was removed from service for maintenance, it was properly identified,
and redundant equipment was verified to be operable. Also,<the NRC I
I
inspectors verified that applicable limiting conditions for
operation were identified and maintained. O'~ -
. Equipment safety clearance records were complete and ind'i ed that
affected components were removed from and returned to. service in a
correct and approved manner. - N , [
. Maintenance work requests were initiated for equipment disco ered to'
require repair or routine preventive upkeep, appropriate priority '
-
was assigned, and work coninenced in a timely manner. . Y , ,
m '
. Plant equipment conditions such as cleanliness, leakage, '
.s
lubrication, and cooling water were controlled and adequately N
s
maintained. ,
-
. Areas of the plant were clean, unobstructed, and free of fire
hazards. Fire suppression systems and emergency equipment were
maintained in a condition of readiness. l
. Security measures and radiological controls were equate.
'
The RI performed a lineup verification of the valves in'normally
'
+
'
inaccessible areas in the following systems:
'
'
,
7
, u ,
-
,N
. Reactor Core Isolations Cooling (RCIC) y x[ . ,
S .
,
. High Pressure Coolant Injection (HPCI) y - y ,,4
'
. Standby Liquid Control (SLC) ,
' '
. Main Steam and Turbine Bypass (MS) ,
-
i
.
. Feedwater -
In preparation for performing the system walkdown of the MS and Feedwat'er.
systems, the RI conducted a review of and comparuon between the
following licensee MS and Feedwater systems valve checklist and
'
.
applicable as-built drawings:
System Operating Procedure (SOP) 2.2.56, "Mainsteam and Turbinh, ,
Bypass System," Revision 21, dated August 7,.1980, Appendir'A,
" Valve Checklist" .
. As-Built drawing - Burns & Roe 2002; for MS System ,,
'
. As-Built drawing - Burns & Roe 2041; for MS System '
. As-Built drawing - GE 115D6014; for MS System .
.
%
<
4
a fe
---
. _ _.
.
,,
13
. As-Built drawing - Burns & Roe M-107; for MS System
'
. As-Built drawing - Burns & Roe M-109; for MS System
.. As-Built drawing - NPPD I.D.-1; for MS System
. As-Built drawing - NPPD I.D.-3; for MS System
. As-Built drawing - NPPD I.D.-18; for MS System
.
50P 2.2.28 "Feedwater System," Revision 39, dated July 17, 1986;
Appendix A " Valve Checklist"
. As-Built drawing - Burns & Roe 2002; for Feedwater
. As-Built drawing - Burns & Roe 2004; for Feedwater
. 'As-Built drawing - Burns & Roe 2005; for Feedwater
. As-Built drawing - Burns & Roe 2043; for Feedwater
. As-Built drawing - Burns & Roe 2044; for Feedwater
. As-Built drawing - Burns & Roe M-110; for Feedwater
. As-Built drawing - Burns & Roe M-111; for Feedwater
. As-Built drawing - NPPD I.D.-4; for Feedwater
. As-Built drawing - NPPD I.D.-6; for Feedwater
The review identified that S0P 2.2.56 Appendix A, listed 194 instrument
related valves that were not numbered or labeled on applicable as-built
drawings 11506014, M-107, M-109, I.D.-1, I.D.-3, or I.D.-18.
The review identified that S0P 2.2.38 Appendix A, listed 149 instrument
related valves that were not numbered or labeled on applicable as-built
drawings M-110, M-111 I.D.-4, or I.D.-6.
These deficiencies are similar to the violation that was documented in
NRC Inspection Report 50-298/86-14, paragraph 5 and similar to Open
Item 298/8626-01 identified in NRC Inspection Report 50-298/86-26,
paragraph 5. These two items will be tracked as an open item pending
review of licensee's corrective action (298/8636-04).
The RI performed an equipment safety clearance record verification for
clearance orders 86-1008 and 86-688. During the performance of the
verification the RI noted on Clearance Order 86-1008 that Tag Number 24
had been removed, but the " Return to Normal By" blank had no initials in
the blank as required. This item was brought to the licensee's attention.
Discussions with the licensee revealed that Tag No. 24 had been removed.
r~~'1 " l
. .
l
l
14
The person who removed the tag had initialed the wrong blank on the
clearance order. The responsible individual corrected the discrepancy in
a timely manner.
The tours, reviews, and observations were conducted to verify that
facility operations were performed in accordance with the requirements
established in the CNS Operating License and Technical Specification.
No violations or deviations were identified in this area.
10. Monthly Surveillance Observations
The NRC inspectors observed Technical Specification required surveillance
tests. Those observations verified that:
. Tests were accomplished by qualified personnel in accordance with
approved procedures.
. Procedures conformed to Technical Specification requirements.
. Tests prerequisites were completed including conformance with
applicable limiting conditions for operation, required
administrative approval, and availability of calibrated test
equipment.
. Test data was reviewed for completeness, accuracy, and confonnance
with established criteria and Technical Specification requirements.
. Deficiencies were corrected in a timely manner.
. The system was returned to service.
The NRC inspectors observed the licensee's performance of the following
surveillance tests on the indicated dates:
. December 10, 1986: Surveillance Procedure (SP) 6.2.2.5.12A, "RiiR
Loops A and B Pump tnd Valve Control Logic Reactor Vessel Pressure
Less Than or Equal to 75 psig Functional Test," Revision 9, dated
November 13, 1986.
. December 12, 1986: SP 6.1.1, "SRM Functional Test (Reactor Not In
Run)," Revision 14, dated October 30, 1986.
. December 12, 1986: SP 6.1.26, " Refueling Platform Interlock and
System Functional Tests," Revision 20, dated December 4, 1986,
Attachments B and E.
. December 12, 1986: SP 6.1.27, " Refueling Platform Interlock and
System Functional Tests," Revision 20, dated December 4,1986,
Attachments E and D.
r . .
15
. December 16, 1986: SP 6.2.27, " Refueling Platfonn Interlock and
System Functional Tests," Revision 20, dated December 4,1986,
Attachment B.
. December 17, 1986: SP 6.4.3.1, "HPCI Turbine Overspeed Functional
Test," Revision 10, dated May 15, 1986, with temporary procedure
change added.
. December 21, 1986: General Operating Procedure (GOP), 2.1.18
" Control Rod Drive Friction Test," Revision 10, dated March 21,
1986, with temporary change procedure added.
. December 21, 1986: SP 6.4.1.2," Withdrawn Control Rod Operability,"
Revision 16, dated December 18, 1986.
. December 21, 1986: SP 6.4.1.3, "CRD Coupling Integrity Check,"
Revision 7, dated October 30, 1986.
The reviews and observations were conducted to verify that facility
surveillance operations were perfonned in accordance with the
requirements established in the CNS Operating License and Technical
Specification.
No violations or deviations were identified in this area.
11. Monthly Maintenance Observation
The NRC inspectors observed preventive and corrective maintenance
activities. These observations verified that:
. Limiting conditions for operation were met.
. Redundant equipment was operable.
. Equipment was adequately isolated and safety tagged.
. Appropriate administrative approvals were obtained prior to
commencement of work activities.
. Work was performed by qualified personnel in accordance with
approved procedures.
. Radiological controls, cleanliness practices, and appropriate fire
prevention precautions were implemented and maintained.
. Quality control checks and postmaintenance surveillance testing were
performed as required.
. Equipment was properly returned to service.
I ....
16
The NRC inspectors observed the licensee's performance of the following
naintenance activities on the indicated date.
. December 18, 1986: "A" Service Water Pump
. December 21, 1986: Design Change (DC)86-134, " Replacement of
Reactor Building Personnel Airlock Doors"
. December 22, 1986: MaintainanceonReactorEquipmentCooling(REC)
Heat Exchanger A and B Outlet Valves
. December 22, 1986: Diesel Generator No.1 Head Torque and Water
Jacket Gasket Repair
These reviews and observations were conducted to verify that facility
maintenance operations were perfonned in accordance with the requirements
established in the CNS Operating License and Technical Specification.
CNS issued a justification for Interim Operation in response to a
self-identified problem in the Standby Gas Treatment (SGT) System.
Reference Licensee Event Report 86-28, "SGT System Seismic Design
Deficiencies," dated November 20, 1986. A review of the original design
documentation revealed that no weld records existed to identify the type
of welding rod used to weld the dissimilar metals (stainless steel to
carbonsteel.) To ensure that the welding rod used to make the
dissimilar metal welds was correct the RI performed a visual inspection
of 12 different welds selected at random. The following list of hanger
welds were visually inspected for stress cracking (SC) and weld
degradation (WD) with results noted:
Hanger Designation Result Hanger Designation Result
F01 No SC or WD F02 No SC or WD
301 No SC or WD 302 No SC or WD
303 (2) No SC or WD 304 No SC or WD
306 No SC or WD 307 No SC or WD
309 No SC or WD 313 No SC or WD
317 No SC or WD
Since no SCs or WDs were found, it was concluded that the appropriate
welding rod material had been used to weld the dissimilar metals. No
further action was required.
No violations or deviations were identified in this area.
....
17
12. Unresolved Items
An unresolved item is one about which additional information is required
in order to determine if the item is acceptable, a violation, or a
deviation. The following unresolved items were identified during this
inspection.
Item Paragraph Subject
298/8636-01 2 Diesel Sequential Loading
13. Exit Interviews
Exit interviews were conducted at the conclusion of each portion of the
inspection. The NRC inspectors summarized the scope and findings of each
inspection segrrent at those meetings.