Letter Sequence Other |
---|
|
|
MONTHYEARML20134C2241996-09-23023 September 1996 Forwards Summary of Revised Offsite Dose Results (Eab) Identified After Submittal of Responses to 960221 RAI Project stage: Other ML20129J7231996-10-28028 October 1996 Forwards Calculation Package for Revised Offsite Dose Results for Postulated SG Tube Rupture Event Project stage: Other ML20140G8171997-04-22022 April 1997 Forwards Estimated Changes in Significant Parameters for Steam Line Break & Draft Revs to UFSAR Table 15-24 Re Suppl to Replacement SG Proposed TS Amend Project stage: Draft Other ML20140J2851997-05-0202 May 1997 Provides Requested Info Re Licensee Scaling of Retran Predicted SG Tube Leak Flowrates for Use in Offsite Dose Analyses for Rod Ejection & Locked Rotor Accidents Project stage: Other 1996-09-23
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217H5811999-10-15015 October 1999 Forwards 1999 Update to FSAR, for McGuire Nuclear Station.With Instructions,List of Effective Pages for Tables & List of Effective Pages for Figures ML20217G7861999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20217F3591999-10-13013 October 1999 Forwards Info Copy of Cycle 14 COLR for McGuire Nuclear Station,Unit 1 ML20217F3261999-10-13013 October 1999 Submits Quantity of Tubes Insp from Either Side of SGs A-D & Lists Tubes with Imperfections,Locations & Size.No Tubes Removed from Svc by Plugging.Total of Eleven Tubing Wear Indications Identified at Secondary Side Supports in SGs ML20217F8011999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of McGuire Nuclear Station.Areas That Warranted More than Core Insp Program Over Next Five Months,Not Identified.Historical Listing of Plant Issues Encl ML20217J5091999-10-0606 October 1999 Forwards Revs to Section 16.15-4.8.1.1.2.g of McGuire Selected Licensee Commitments Manual.Section Has Been Revised to Allow Testing of Portions of DG Fuel Oil Sys Every 10 Yrs ML20217C8351999-10-0505 October 1999 Communicates Correction to Info Provided During 990917 Meeting with Duke Energy & NRC Region Ii.Occupational Radiation Safety Performance Indicator Values Should Have Been Presented as 1 Instead of 0 ML20217C4471999-10-0404 October 1999 Forwards Insp Repts 50-369/99-06 & 50-370/99-06 on 990801- 0911.Determined That One Violation Occurred & Being Treated as Non-Cited Violation ML20212J2191999-10-0404 October 1999 Informs That Util 980326 Response to GL 97-06, Degradation of SG Internals Provides Reasonable Assurance That Condition of Steam Generator Internals Are in Compliance with Current Licensing Bases for Facility ML20212J7801999-10-0404 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for McGuire NPP & 990615.Informs That NRC Reviewed Responses & Concluded That All Requested Info Re Y2K Readiness Provided.Subj GL Considers to Be Closed ML20212M1651999-09-23023 September 1999 Refers to 990917 Meeting at Region II Office Re Licensee Presentation of self-assessment of McGuire Nuclear Station Performance.List of Attendees & Licensee Presentation Handouts,Encl ML20212D1671999-09-20020 September 1999 Forwards Exemption & SER from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Re Isolation of Main Steam Branch Lines Penetrating Containment.Exemption Related to Licensee Application ML20212B6491999-09-15015 September 1999 Informs That Encl Announcement Re 990913 Application for Amend to Licenses NPF-9 & NPF-7 Forwarded to C Observer in North Carolina,For Publication ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20216E8791999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for July 1999 for McGuire Nuclear Station ML20212A0501999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementing Code Case for Duration of Insp Interval ML20212A2631999-09-0909 September 1999 Forwards Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valve Inservice Testing Program, IAW 10CFR50.55a. Section 8.0 Contains Summary of Changes & Detailed Description of Changes Associated with Rev 25 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 ML20211J3671999-08-31031 August 1999 Forwards Public Notice of Application for Amend to License NPF-9 Seeking one-time Extension of Surveillance Frequency for TS SR 3.1.4.2 Beyond 25% Extension Allowed by TS SR 3.0.2 ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211K8831999-08-26026 August 1999 Forwards Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Occurred & Being Treated as NCVs ML20211G5181999-08-24024 August 1999 Forwards SE Re second-10-yr Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210V0171999-08-13013 August 1999 Confirms Conversation Between M Cash & M Franovich on 990806 Re Mgt Meeting,Scheduled for 990917 to Present self- Assessment of Plant Performance.Meeting Will Be Held in Atlanta,Ga ML20210S2231999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210T4511999-08-10010 August 1999 Forwards Response to NRC RAI Re 981014 Standby Nuclear Svc Water Pond Dam Audit Conducted by FERC ML20210R4311999-08-10010 August 1999 Forwards Summary Rept of Mods,Minor Mods,Procedure Changes & Other Misc Changes Per 10CFR0.59 ML20210R0031999-08-10010 August 1999 Forwards Revised TS Bases Pages to NRC for Info & Use. Editorial Changes Were Made to Correct Incorrect UFSAR Ref Number Associated with Certain Reactor Coolant Sys Pressure Isolation Valves ML20210Q3701999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date in Order to Register Individuals to Take Exam ML20210H7691999-07-21021 July 1999 Submits Summary of 990715 Meeting at Facility Re Presentation of Results of Most Recent Periodic Ppr.List of Meeting Attendees Encl ML20209H1551999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for May 1999 Also Encl ML20210E1931999-07-13013 July 1999 Forwards Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation1999-07-0909 July 1999 Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20209G5151999-07-0808 July 1999 Forwards Amended Pages to Annual Radioactive Effluent Release Repts, for 1997 & 1998 for McGuire Nuclear Station. Portion of Rept Was Inadvertently Omitted Due to Administrative Error,Which Has Been Corrected ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20196J4381999-06-29029 June 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1,NRC Revised Info in Rvid & Releasing Rvid Version 2 ML20196G3721999-06-24024 June 1999 Documents Verbal Info Provided to NRR During Conference Call Re Relief Requests 98-002 & 98-003 ML20196G7461999-06-22022 June 1999 Requests Exemption from Requirements of 10CFR54.17(c) That Application for Renewed Operating License Not Be Submitted to NRC Earlier than 20 Yrs Before Expiration of Operating License Currently in Effect ML20195K3601999-06-14014 June 1999 Forwards MORs for May 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised MORs for Apr 1999.Line 6 Max Dependable Capacity (Gross Mwe) on Operating Data Rept Should Be Revised to 1114 from Jan 1998 to Apr 1999 ML20195D5691999-06-0303 June 1999 Submits Ltr to Facilitate Closing of Inspector Follow Up Item 50-369,370/97-15-05,re Revising Site Drawings in UFSAR Into Summary one-line Flow Diagrams,Per NRC 990327 Telcon ML20195F1851999-06-0202 June 1999 Forwards Insp Repts 50-369/99-03 & 50-370/99-03 on 990328- 0508.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20195E8771999-06-0202 June 1999 Confirms Telcon with M Cash on 990524 Re Public Meeting for 990715.Purpose of Meeting to Discuss Results of NRC Most Recent PPR ML20207D0521999-05-21021 May 1999 Informs That in Telcon on 990519 Between a Orton & Rf Aiello Arrangements Made for Administration of Initial Written Exam for McGuire Nuclear Station on 990603.Exam Will Be Administered at Catawba Simultaneously with Written Exam ML20196L1791999-05-20020 May 1999 Communicates Util Licensing Position Re Inoperable Snubbers. Licensee Has Determined That Structure of ITS Has Resulted in Certain Confusion Re Treatment of Inoperable Snubbers ML20196L1851999-05-20020 May 1999 Forwards Proprietary & non-proprietary Version of Rev 1 to TR DPC-NE-3004, Mass & Energy Release & Containment Response Methodology, Consisting of Finer Nodalization of Ice Condenser Region.Proprietary Info Withheld ML20206T4481999-05-13013 May 1999 Forwards Rev 3 to Topical Rept DPC-NE-3002-A, UFSAR Chapter 15 Sys Transient Analysis Methodology, IAW Guidance Contained in NUREG-0390 ML20206R0791999-05-13013 May 1999 Forwards Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised Monthly Operating Repts for Mar 1999 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217H5811999-10-15015 October 1999 Forwards 1999 Update to FSAR, for McGuire Nuclear Station.With Instructions,List of Effective Pages for Tables & List of Effective Pages for Figures ML20217F3261999-10-13013 October 1999 Submits Quantity of Tubes Insp from Either Side of SGs A-D & Lists Tubes with Imperfections,Locations & Size.No Tubes Removed from Svc by Plugging.Total of Eleven Tubing Wear Indications Identified at Secondary Side Supports in SGs ML20217F3591999-10-13013 October 1999 Forwards Info Copy of Cycle 14 COLR for McGuire Nuclear Station,Unit 1 ML20217G7861999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20217J5091999-10-0606 October 1999 Forwards Revs to Section 16.15-4.8.1.1.2.g of McGuire Selected Licensee Commitments Manual.Section Has Been Revised to Allow Testing of Portions of DG Fuel Oil Sys Every 10 Yrs ML20217C8351999-10-0505 October 1999 Communicates Correction to Info Provided During 990917 Meeting with Duke Energy & NRC Region Ii.Occupational Radiation Safety Performance Indicator Values Should Have Been Presented as 1 Instead of 0 ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20216E8791999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for July 1999 for McGuire Nuclear Station ML20212A2631999-09-0909 September 1999 Forwards Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valve Inservice Testing Program, IAW 10CFR50.55a. Section 8.0 Contains Summary of Changes & Detailed Description of Changes Associated with Rev 25 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210S2231999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210T4511999-08-10010 August 1999 Forwards Response to NRC RAI Re 981014 Standby Nuclear Svc Water Pond Dam Audit Conducted by FERC ML20210R0031999-08-10010 August 1999 Forwards Revised TS Bases Pages to NRC for Info & Use. Editorial Changes Were Made to Correct Incorrect UFSAR Ref Number Associated with Certain Reactor Coolant Sys Pressure Isolation Valves ML20210R4311999-08-10010 August 1999 Forwards Summary Rept of Mods,Minor Mods,Procedure Changes & Other Misc Changes Per 10CFR0.59 ML20209H1551999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for May 1999 Also Encl ML20209G5151999-07-0808 July 1999 Forwards Amended Pages to Annual Radioactive Effluent Release Repts, for 1997 & 1998 for McGuire Nuclear Station. Portion of Rept Was Inadvertently Omitted Due to Administrative Error,Which Has Been Corrected ML20196G3721999-06-24024 June 1999 Documents Verbal Info Provided to NRR During Conference Call Re Relief Requests 98-002 & 98-003 ML20196G7461999-06-22022 June 1999 Requests Exemption from Requirements of 10CFR54.17(c) That Application for Renewed Operating License Not Be Submitted to NRC Earlier than 20 Yrs Before Expiration of Operating License Currently in Effect ML20195K3601999-06-14014 June 1999 Forwards MORs for May 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised MORs for Apr 1999.Line 6 Max Dependable Capacity (Gross Mwe) on Operating Data Rept Should Be Revised to 1114 from Jan 1998 to Apr 1999 ML20195D5691999-06-0303 June 1999 Submits Ltr to Facilitate Closing of Inspector Follow Up Item 50-369,370/97-15-05,re Revising Site Drawings in UFSAR Into Summary one-line Flow Diagrams,Per NRC 990327 Telcon ML20196L1791999-05-20020 May 1999 Communicates Util Licensing Position Re Inoperable Snubbers. Licensee Has Determined That Structure of ITS Has Resulted in Certain Confusion Re Treatment of Inoperable Snubbers ML20196L1851999-05-20020 May 1999 Forwards Proprietary & non-proprietary Version of Rev 1 to TR DPC-NE-3004, Mass & Energy Release & Containment Response Methodology, Consisting of Finer Nodalization of Ice Condenser Region.Proprietary Info Withheld ML20206R0791999-05-13013 May 1999 Forwards Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised Monthly Operating Repts for Mar 1999 ML20206T4481999-05-13013 May 1999 Forwards Rev 3 to Topical Rept DPC-NE-3002-A, UFSAR Chapter 15 Sys Transient Analysis Methodology, IAW Guidance Contained in NUREG-0390 ML20206S9151999-05-11011 May 1999 Forwards Rev 29 to McGuire Nuclear Station Selected Licensee Commitments. Section 16.11-16.2 Has Been Revised to Apply Guidance of NUREG-0133 for Performing Gaseous Effluent Dose Pathway Calculations ML20206K1341999-05-0303 May 1999 Forwards 1999 Interim UFSAR for McGuire Nuclear Station. UFSAR Update Includes Items Relocated During Improved Tech Specs Implementation.Next Regular UFSAR Update as Required 10CFR50.71(e) Is Due in Oct 1999 ML20206F3321999-04-28028 April 1999 Forwards Annual Radioactive Effluent Release Rept for 1998 for McGuire Nuclear Station. Listed Attachments Are Contents of Rept.Revised ODCM Was Submitted to NRC on 990203 ML20206E4101999-04-26026 April 1999 Forwards Four Copies of Rev 9 Todpc Nuclear Security & Contingency Plan,Per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20206B4791999-04-20020 April 1999 Requests Exemption from GDC 57 Re Reactor Containment - Closed Sys Isolation Valves,As Described in 10CFR,App a for Containment Penetrations M393 & M261.Detailed Technical Evaluation & Justification for Exemption Request,Encl ML20205S9731999-04-19019 April 1999 Submits Info Re Quantity of SG Tubes Inspected,Tube Indications of Imperfections & Tubes Removed from Svc by Plugging,Per TS 5.6.8,part B 05000369/LER-1999-001, Forwards LER 99-01(S)-00 Re Contract Employee Submittal of False Info Resulting in Gaining Unescorted Access.No Licensee Planned Corrective Actions or Other Regulatory Commitments Were Identified as Result of Incidence1999-04-16016 April 1999 Forwards LER 99-01(S)-00 Re Contract Employee Submittal of False Info Resulting in Gaining Unescorted Access.No Licensee Planned Corrective Actions or Other Regulatory Commitments Were Identified as Result of Incidence ML20205P8891999-04-13013 April 1999 Forwards Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for Feb 1999 Encl ML20206K3561999-04-13013 April 1999 Forwards Revised McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual. Significant Changes Are Marked by Vertical Bars on Right Margin ML20205K5131999-04-0707 April 1999 Forwards Complete Response to NRC 981209 & 990105 RAIs on Question 11 Re LARs for McGuire & Catawba Nuclear Stations. Addl Info Received from W & Contained in Encl W ML20205B6011999-03-23023 March 1999 Requests That NRC Place Technical Interface Agreement 97-02 Re URI 96-11-03,raising Operability & Design Criteria Conformance Issues Re Hydraulic Snubbers Installed at Plant & NRR Response on Dockets to Provide Record of Issue ML20205C4611999-03-23023 March 1999 Submits Correction to Violation Against 10CFR50 App B, Criterion VII, Control of Purchased Matl,Equipment & Svcs, Issued to McGuire Nuclear Station on 980807 ML20205B6161999-03-23023 March 1999 Provides Addl Info & Correction to Typo in Re License Bases Record Change Re License Amend Submittals ,approved as FOL NPF-9 & NPF-17,amends 184 & 166, respectively.Marked-up TS Pages,Encl ML20204J0051999-03-19019 March 1999 Forwards Response to 990127 & 28 RAIs Re GL 96-05 for Catawba & McGuire Nuclear Stations ML20204E1791999-03-18018 March 1999 Reflects 990318 Telcon Re License Bases Record Change for License Amend Submittals ,approved as Amends 184 & 166,respectively for Licenses NPF-9 & NPF-17.TS Pages Encl ML20204C8821999-03-15015 March 1999 Forwards Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for Jan 1999 Encl ML20207C2071999-02-25025 February 1999 Informs of Revised Expected Submittal Date of Proposed License Amend Presented at 990127 Meeting Re Soluble Boron & Boraflex.Util Plans to Submit Proposed License Amend in First Quarter of 1999 ML20207C7691999-02-22022 February 1999 Forwards Annual Occupational Radiation Exposure Rept for 1998. Rept Provides Tabulation of Number of Station,Utility & Other Personnel Receiving Exposure Greater than 100mRem/yr Followed by Total Dose for Each Respective Worker ML20207C6851999-02-22022 February 1999 Forwards Revised TS Bases Pages,Reflecting Removal of SI Signal on Low Steamline Pressure on Page B 3.3.2-16 & Adding Clarification for Increasing Hydrogen Recombiner Power During Testing on Page B 3.6.7-4 ML20206S3341999-01-28028 January 1999 Forwards Proprietary & non-proprietary Responses to NRC 981209 & 990105 RAIs Re Util Lars,Permitting Use of W Fuel at McGuire & Catawba Stations.Proprietary Info Withheld,Per 10CFR2.790 ML20199E0081999-01-12012 January 1999 Forwards MOR for Dec 1998 & Revised MOR for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199C9861999-01-0707 January 1999 Forwards Annual Lake Norman Environ Summary Rept for 1997,as Required by NPDES Permit NC0024392,including Detailed Results & Data Comparable to That of Previous Years.With Corrected Pages 3 & 19 to 1994-95 Lake Norman Creel Rept 1999-09-09
[Table view] |
Text
._. .-,m ..
. _ -. . _ _ _ . _ _ - - ._ _-......m . _ . . - . _ . . _. _ . _ . . _ _ _ _
ll l 2~/ De cain gnjf f a nAY??et DC%
. Duke hwer Cornpany (M4)875-1000 AlcGuire NudearStation C700 Hugers :- rry Road D' # Sl 55 Huntersville, NC 20Ml40 i
DUKEPOWER l
May 2, 1997 U. S. Nuclear Regulatory Commission i
Attention: Document Control Desk Washington, DC 20555
Subject:
McGuire Nuclear Station, Units 1 and 2, Docket Mos. 50-369 and 370
[ Supplea. ant to Replacement SG Proposed TS Amendment
- (TACs M90590 and M90591 By letters dated September 30, 1994 and September 18, 1995, Duke Power Company submitted proposed revisions to the McGuire Units 1 and 2 Technical Specifications. The proposed changes ' vere j related to replacement of the steam generators for each unit.
- On May 1, 1997, a conference call was held between !
j representatives of the NRC Staff and Duke Power Company. The Staff requested further explanation of Duke's scaling-of RETRAN- i predicted steam generator tube leak flowrates for use in offsite dose analyses for rod ejection and locked rotor accidents. The requested information is provided in Attachment 1.
Please contact R. O. Sharpe at (704) 382-0956 if you have any j questions.
1 L
-Very t.uly yours, p W
,- H. B. Barron Attachment f
/30o/
4 L
. QQ.3 "e
9700140035gg2
- " ^""" e= +
IIqlqIIII;IIIgIII) qui n-
U. S. Nuclear Regulatory Commission
- May 2, 1997 Page 2 l XC
{ L. A. Reyes, Regional Administrator i U. S. Nuclear Regulatory Commission, Region II l 101 Marietta Street, NW, Suite 2900 Atlanta, GA 30323 S. M. Shaeffer Senior Resident Inspector McGuire Nuclear Station V. Nerses Project Manager, ONRR
. _ = _ .-. .- . . . . - .
6 Attachment 1 McGuire Nuclear Station l Response to NRC Staff Request Page 1 of 3 Description of Scaling RETRAN-predicted Steam Generator Tube Leak l
Flowrates For Input To Offsite Dose Analyses for Rod Ejection and Locked Rotor Accidents The Duke Power methodology for analyzing the offsite dose consequences for the UFSAR locked rotor and rod ejection accidents uses a simple scaling process for determining the allowable Technical Specification leakage through a pre-existing steam generator tube leak. The methodology and the basis for the methodology are as follows.
The NRC-approved RETRAN-02 model for the McGuire Nuclear Station is used to simulate the system thermal-hydraulic transient response for the locked rotor and the rod ejection accidents.
The initial and boundary conditions assumed in these simulations result in a conservative prediction of the plant transient response used to develop thermal-hydraulic inputs for the offsite dose analysis. A significant contribution to the offsite dose consequences for these two accidents is the small amount of l primary coolant that leaks into the steam generator secondary due to the pre-existing steam generator tube leak rate allowed by l Technical Specifications. Even though the leak rate is very '
small, it is a significant source term for the offsite dose calculation. The primary coolant activity is high due to the assumed failure of a percentage of the fuel pins which results I from exceeding the DNBR limit. l l
The RETRAN-02 model includes a simple RETRAN junction i representing the steam generator tube leak. This junction connects the primary loop to the steam generator secondary at the location of the steam generator tube leak. The transient flow through the junction is calculated by the RETRAN momentum equation. As the pressures in the adjacent volumes change during the transient, the flowrate through the junction changes. The changes in the primary coolant water properties during the transient also affect the flowrate through the junction. All of the time-dependent changes in the local fluid conditions that affect the primary-to-secondary leak rate are calculated by RETRAN.
The Technical Specification limit on steam generator tube leak rate is a very small number, on the order of 100 gpd (0.07 gpm).
Considering that the primary coolant mass is approximately 500,000 lbm, and the steam generator mass is approximately
. - . . .- . - - . .-. -- .~ -- -
t
~
4 Page 2 of 3 100,000 lbm, this small tube leak flowrate will have no significant effect on the plant thermal-hydraulic response during a rod ejection or locked rotor accident. In other words, the normalized tube leak flow will be the same regardless of the tube j leak rate modeled in RETRAN. For example, assuming a constant leak flow of 100 gpd, only 4.2 gallons will leak through the tube in one hour. This small mass transfer will not affect the pressures or water properties in the adjacent volumes.
Since tube leak flows in this range are insignificant in terms of i the transient response of the plant, an initial leak flow can be arbitrarily selected for the RETRAN junction. This leak flow is obtained by iterating on the input value for the tube leak junction flow area until a desired initial leak flow is obtained.
This initial leak flow value can be a value such as 1 gpd, 10 gpd, 50 gpd, 100 gpd, etc., provided that the plant response is not affected by selecting too large of a value. Any appropriate value will provide the desired result, which is the normalized time-dependent change in the leak rate. The absolute value of the leak rate is unimportant except that it be selected as a small value. For convenience a value which is equivalent to a normalized value of 1, or 10, or 100 in the desired units (gpd) is selected to minimize the chance of introducing a mathematical error in the subsequent scaling of the normalized leak flow. In the analyses of interest, an initial normalized steam generator i tube leak flow rate of 100 gpd was chosen for the above reasons.
The RETRAN analysis then provides the time-dependent behavior of the tube leak flowrate based on an initial normalized leak flow of 100 gpd. The leak rate changes from its initial value of 100 gpd based on the changes in the pressures in the adjacent volumes and based on the changes in the upstream water properties.
The initial dose analyses are then performed assuming this time-dependent leak rate (or integrated time-dependent leakage) ano the other required boundary conditions. If additional conservatism is desired, any decrease in the leak rate can be ignored. For example, if assuming that the initial leak rate remains constant for the duration of the analysis is conservative, then that assumption can be made. However, crediting the time-dependent behavior of the leak flow is sufficiently conservative.
If the initial dose analysis result exceeds the acceptance criterion, then a reduction in the tube leak rate assumed in the dose analysis is required. In this case, Duke would be required to submit a Technical Specification Amendment. The amendment would reflect the reduced tube leak rate assumed in the dose
Page 3 of 3 calculatign. If the initial dose analysis result is significantly less than the acceptance criterion, then an increase in the tube leak rate assumed in the dose analysis is justified.
Either an increase or a decrease in the tube leak rate or integrated leakage modeled in the RETRAN analysis can be obtained by simply scaling the RETRAN results by the ratio of the revised initial leak rate divided by the existing initial leak rate. For example, if the initial RETRAN analysis assumed a 100 gpd tube leak rate, and revised results for a 135 gpd leak rate are desired, then the revised results are simply the initial RETRAN results multiplied by the factor 135/100. This simple scaling process is justified based on the argument presented above that small tube leaks in this range do not affect the plant transient response. This means that the normalized transient response is the same for all small tube leaks. Consequently, there is no need to reanalyze the transient response with the revised tube leak flowrate.
The above process can be used to scale the RETRAN-predicted results for a change in the initial steam generator tube leak rate for the locked rotor and rod ejection accidents. This process is only valid for small initial tube leak rates, and cannot be used for large leak rates such as that which results from the rupture of a steam generator tube.