ML20151S241

From kanterella
Revision as of 23:37, 10 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Application for Amend to License DPR-34,allowing Up to 5 Consecutive Days to Perform Equalizing Charge W/Station Battery & Associated Battery Charger Disconnected from Dc Bus
ML20151S241
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 04/20/1988
From: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20151S197 List:
References
TAC-67933, NUDOCS 8804280256
Download: ML20151S241 (4)


Text

.- , - ,. - - . . . . -. .-. .. -

n'j 1

i

< BEFORE THE- l 1

' I UNITED STATES NUCLEAR REGULATORY COMMISSION

\

l In the Matter.of the Fa'cility Operating License)

-) ,

of ) l

)-  !

PUBLIC SERVICE COMPANY OF COLORADO. ) .

I 1

'\

Application for Amendment to .)

Appendix A of Facility Operating License i License No. OPR-34 -l

~1 l

l 0F THE- i PUBLIC SERVICE COMPANY OF COLORADO  !

l FOR'THE  !

l FORT ST. VRAIN NUCLEAR GENERATING STATION-l 1

This application for Amendment;to Appendix A of Facility Operating License, License No. OPR-34, l is submitted for NRC review and approval. -

Respectfully submitte'd ,

PUBLIC SERVICE COM0ANY OF COLORADO -

1 By R. O. Williams, Jr.  !

Vice President Nuclear Operations KELLY, STANSFIELD & 0'00NNELL -l Bryant O'Donnell l James K. Tarpey I Public Service Company Building.

Denver, Colorado 80202' Attorneys for Applicant 8804280256 880420

'PDR ADOCK 05000267 p DCD

, -s s

l 1

~I ATTACHMENT 1

SUMMARY

OF PROPOSED CHANGES l

l l

4 l

1 l

i I

l.

, TvM'?Pw- e m-?-p -

T--et-ve ,p-ry=w -reg--ye=w W ,ye gr . gmem r ,v p t- ynuv t'e tw y wmw++-mTM*eug"vT$ kw er-

i

\

P-88116 Attachment I l

Page 1 of 1

SUMMARY

OF PROPOSED CHANGES Section Description of Change 4.6.1.e) This change requires a station battery and associated battery charger to be declared inoperable when disconnected from its D.C. bus to perform an equalizing charge.

This change allows a station battery and associated battery charger to be disconnected from its D.C. bus for up to 5 consecutive days to perform an equalizing charge.

This change requires the bus tie breakers between the two D.C. buses to be configured such that D.C. bus independence is maintained and the disconnect switch for the PPS battery to be open when a station battery and/or battery charger is inoperable.

Basis This change updates the discussion on the D.C. power sources and the instrument power sources to be consistent with the proposed Technical Specification change and actual plant  ;

configuration as described in FSAR Sections 8.2.2.3 and 8.2.2.4.

l l

1 l

1 i

i 1

1 9

's }

, 1 i

ATTACHMENT 2 PROPOSED CHANGES i