Application for Amend to License DPR-34,rewording Basis for Limiting Condition for Operation 4.2.2 Re Operation of Plant Backup Bearing Water Sys from Requiring Automatic Operation to Permitting Either Automatic or Manual Operation
ML20246L016
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 07/14/1989
From: Crawford A
PUBLIC SERVICE CO. OF COLORADO
To: Hebdon F
Office of Nuclear Reactor Regulation
Shared Package
ML20246L019 List:
References
P-89265, TAC-73330, NUDOCS 8907180325
Download: ML20246L016 (4)


Text

_,..

.(

0 Public Service' Public Service c.

...< c.i...

P.O. Box 84o Denver CO 8o201- 0840 July 14, 1989 A. Clegg Crawford.

Fort 5t. Vrain-Ec'E*o[*,",' tion.

Unit No. 1 P-89265 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington D. C. 20555 ATTN:

Mr. Fredrick J. Hebdon, Director Project Directorate IV Docket No. 50-267

SUBJECT:

Request For Rewording of Technical Specification LC0 4.2.2 Basis.

Dear Mr. Hebdon:

Public Service Company of Colorado (PSC) is in the process of modifying operation of the Fort St. Vrain Backup Bearing Water System (BUBW) from requiring automatic operation.to permitting either automatic or reanual operation. The BVBW is not classified as a Class I,

Safe Shutdown, or Safety Related system at Fort St. Vrain. The BUBW is a helium circulator auxiliary system.

It is not required to be operable by the. Fort St. Vrain Technical Specifications in order to consider the associated helium circulator (s) operable.

However, the basis for Technical Specification LCO 4.2.2 does describe the

.BUBW as being automatically available.

This letter is to request your concurrence in rewording the fourth sentence of the basis of LCO 4.2.2 to read "In addition, a backup bearing water system is provided which can be used to introduce water to the circulators if the normal supply fails." At the same time, your concurrence is requested to correct the second sentence from "one circulator" to "two circulators."

This correction is in agreement with FSAR Section 14.11.2.2.

I DO[M OMm,pf 5 99o7 4 PN Of I 1' L---

4

r

' '. y b_ te, 37 ca LP-89265: '

July 14,' 1989 -

1 J

Two attachments are-included with this submittal:

Attachment'l - A~ marked up copy-of section 4.2.2, page 4.2-2

~

and revised' page 4.2-2 for your Technical 1

Specification.

Attachment 2,- Operations Deviation Report (DDR)L89-088 :

=with Safety Evaluation and internal' memo-PPS-89-1702.

~

'The' BUBW is. now maintained in a standby condition and may be used' when normal bearingJ water is not available in accordance with Emergency Operating Procedure (EOP) 3. (The' manual initiation of'BUBW-has recently been transferred from PSC's' Abnormal Operating Procedure

'(AOP). 21-02 to Emergency Operating Procedure (EOP) 3.) 'The Fort.St.

~Vrain.HTGR has four. circulators. As described.in the. enclosed Safety

' Evaluation,.the ~ accident-analyses for Fort.St. Vrain requires _the operation of.one circulator after 90 ' minutes for-: safe shutdown cooling.

oA highly ~. improbable depressurization accident..(DBA-2) requires'two circulators to be operating within160 minutes.for safe Jshutdown cooling.

The BUBW is fully capable of supplying Bearing' Water:to two circulators. All four circulators are required to' attain full power operation modeled.in the Accident Analyses. A loss of one

loop (2 circulators) leaves two circulators operating which.'is-adequate.to. satisfy-safe shutdown cooling requirements for all postulated accident conditions without additional emergency measures.

J 6

F P-89265 July 14, 1989 If you have any questions, please contact Mr. M. H. Holmes at (303) 480-6960.

Very truly yours, A. Clegg Crawf d Vice President, Nuclear Operations ACC/JMW/km Enclosures cc:

Regional Administrator, Region IV ATTN:

Mr. T. F. Westerman, Chief Projects Section B Mr. Robert Farrell Senior Resident Inspector Fort St. Vrain Mr. Robert Quillen Colorado Department of Health

,. s

.;g.. '.y

)..

e a,.

1 ATTACHMENT 1 MARKED-UP PAGE 4.2-2 AND REVISED PAGE 4.2-2