Application for Amend to License DPR-34,to Document Design Features for Defueling Phase of Operation
ML20247G776
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 09/14/1989
From: Crawford A
PUBLIC SERVICE CO. OF COLORADO
To: Weiss S
Office of Nuclear Reactor Regulation
Shared Package
ML20247G779 List:
References
P-89350, NUDOCS 8909190138
Download: ML20247G776 (4)


Text

---

1

=Olah,.oo h Public Service" P.O. Box 840 Denver CO 802o1- 0840 September 14, 1989 A. Clegg Crawford Fort St. Vrain

  • 1(*i,[*gl,gon, Unit No. 1 P-89350 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 ATTN: Seymour H. Weiss, Director Non-Power Reactor, Decommissioning and Environmental Project Directorate Docket No. 50-267

SUBJECT:

Proposed Technical Specification Change To Section 6.1 - Defueling

Dear Mr. Weiss:

This is an amendment request to the Fort St. Vrain Technical Specifications, Section 6.1, to document design features for the defueling phase of operation. The Fort St. Vrain reactor core will -

bc defueled using the fuel handling machine, similar to a refueling. ,

Borsa ted defueling elements will be used to maintain the structural l integrity of the core daring and after defueling, to provide neutron absorption for the fuel elements remaining in the core until defueling is complete, ano tu alls coolant flow through the core during defueling.

Three attachments are included with this proposed amendment:

Attachment 1 - Summary of Proposed Changes Attachment 2 - Proposed Changes Attachment 3 - No Significant Hazards Consideration Analysis On August 29, 1989, PSC announced the end of operations for Fort St.

Vrain. NRC Meeting Memorandum, Heitner to Weiss, dated August 18, 1980 (G-89291) expressed a staff concern that Section 6.1 of the Technical Specifications is not being changed to describe the i defueling elements. Therefore, this Technical Specification amendment request is being submitted.

PSC is pursuing a high priority effort to submit these changes, obtain NRC approval, and implement these changes. However, PSC is

[00l concerned that an approved amendment may not be issued in time to '

i s 8909190138 890914 PDR ADOCK 05000267 p FDC

P-89350 September 14, 1989 support current plans to start defueling by November 27, 1989.

Therefore, PSC requests that defueling activities be allowed to commence without final approval of the attached Technical Specification changes. In order to permit timely initiation of safe defueling activities, PSC commits to actively pursue approval of the attached Technical Specification changes, and to conduct any defueling activities in full compliance with the existing Technical Specifications and the more conservative requirements in the attached Proposed Technical Specification Changes until an approved amendment is issued.

If you have any questions or comments concerning the enclosed information, please call Mr. M. H. Holmes at (303) 480-6960.

Very truly yours, 4I$ -

A. Clegg rawfor Vice President Nuclear Operations ACC/JMW/km Attachments cc: Regional Administrator, Region IV ATTN: Mr. T. F. Westerman, Chief Projects Section B Mr. Robert Farrell Senior Resident Inspector Fort St. Vrain Mr. Robert M. Quillen Colorado Department of Health i

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter )

)

Public Service Company of Colorado ) Docket No. 50-267 Fort St. Vrain Unit No. 1 )

AFFIDAVIT A. Clegg Crawford, being first duly sworn, deposes and says: That he is Vice President, Nuclear Operations, of Public Service Company of Colorado, the Licensee herein, that he has read the foregoing Application for Amendment to Appendix A of Facility Operating License and- knows the contents thereof, and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

d-A. Clegg Crawford "

Vice President, i Nuclear Operations STATE OF COLORADO )

)

COUNTY OF DENVER )

Subscribe and sworn to before me, a Notary Public on this 14th day of September , 1989

Ob o Notary Public

/%n, My commission expires January 6 , 1993 I

l I

i 1

5 BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of the Facility Operating License)

)

of )

)

PUBLIC SERVICE COMPANY OF COLORADO ).

Application for Amendment to Appendix A of Facility Operating License License No. DPR-34 0F THE PUBLIC SERVICE COMPANY OF COLORADO FOR THE FORT ST. VRAIN NUCLEAR GENERATING STATION This application for Amendment to Appendix A of Facility Operating License, License No. DPR-34, is submitted for NRC review and approval.

Respectfully submitted, PUBLIC SERVICE COMPANY OF COLORADO By A. Clegg Crawford Vice President, Nuclear Operations KELLY, STANSFIELD & 0'DONNELL James K. Tarpey Mark A. Davidson Public Service Company Building Denver, Colorado 80202 Attorneys for Applicant

- - _ _ - _ _ - _ _