Forwards Amend 64 to License DPR-34 & Safety Evaluation. Amend Changes Tech Specs for Plant DC Power Sys & Allows for Future Changes to Station Batteries
ML20154J769
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 09/15/1988
From: Heitner K
Office of Nuclear Reactor Regulation
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20154J773 List:
References
TAC-67933, NUDOCS 8809230131
Download: ML20154J769 (3)


Text

T September 15, 1988 Docket No. 50-267 Mr. R. O. Williams, Jr.

Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

FORT ST. VRAIN NUCLEAR GENERATING STATION, AMENDMENT NO. 64 TO FACILITY OPERATING LICENSE NO. DPR-34 (TAC NO. 67933)

The Comission has issued the enclosed Amendment No. 64 to Facility Operating License No. OPR-34 for the Fort St. Vrain Nuclear Generating Station. This amendment consists of changes to the Technical Specifications (TS) in response to your application dated April 20, 1988 (P-88116), as supplemented July 1 (P-88232)andAugust5,1988(P-88285).

The an.endment makes certain changes to the Technical S aecifications for the plant's DC power systems. It also allows for future c1anges to the station batteries. The staff has aporoved the use of a five day equalizing charge at Fort St. Vrain. However, the staff requests that you report on the use of this provision within 45 days after the first year of operation is complete.

A copy of the Safety Evaluation is enclosed. The Notice of Issuance will be included in the Conunission's next Bi-weekly Federal Register notice.

The information requested in this letter affects 10 or fewer respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely,

/s/

Kenneth L. Heitner, Project Mana3er Froject Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosures:

1. Amendment No. 64 to DPR-34
2. Safety Evaluation cc w/ enclosures: NO 1 080913 See next page P MOCX 0500 g 7 DISTRIBUTION:
Docket File O JPartlow NRC PDR TBarnhart(4) local PDR Wanda Jones PD4 Reading EButcher PNc nan (3) ACRS (10) XHeitner GPA/PA JCalvo ARM /LFMB OGC-Rockville DHagan EJordan Plant File PD4/ Liv PD4/PH ) b OGC-Roc ille PD4/D/lK SESB/

l KHeitner:sr JCalvo PNoona'n 08/T5 /8 08/17/88 g

/m/ / /88 08/rr/88 nj FRosa 08/27/88 h'\

\}\ ,

[  %, UNITED STATES

g NUCLEAR REGULATORY COMMISSION
r. WASHINGTON, D. C. 20555
l

% ,/ September 15, 1988

  • ...+

Docket No. 50-267 Mr. R. O. Williams, Jr.

Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

FORT ST. VRAIN NUCLEAR GENERATING STATION, AMENDMENT NO. 64 -

TO FACILITY OPERATING LICENSE NO. OPR-34 (TAC NO. 67933)

The Comission has issued the enclosed Amendment No. 64 to facility Operating License No OPR-34 for the Fort St. Vrain Nuclear Generating Station. This

. amendment consists of changes to the Technical Specifications (TS) in response to your application dated April 20, 1988 (P-88116), as supplemented July 1 (P-88232) and August 5, 1988 (P-88285).

The amendment makes certain changes to the Technical Specifications for the plant's DC power systems. It also allows for future changes to the station batteries. The staff has approved the use of a five day equalizing charge at Fort St. Vrain. However, the staff requests that you report on the use of this provision within 45 days after the first year of operation is complete.

A copy of the Safety Evaluation is enclosed. The Notice of Issuance will be included in the Comission's next Bi-weekly Federal Register notice.

The information requested in this letter affects 10 or fewer respondents; therefore OMB clearance is not required under P.L.96-511.

Sincerely, Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, l IV, V and Special Projects

! Office of Nuclear Reactor Regulation

Enclosures:

1

1. Amendment No. 64 to OPR-34
2. Safety Evaluation cc w/ enclosures:

l See next page l

l

. Mr. R. O. Williams, Jr.

Public Service Company of Colorado Fort St. Vrain cc:

Mr. D. W. Warembourg, Manager Albert J. Hazle, Director Nuclear Engineering Divisfon Radiation Control Division Public Service Company Department of Health of Color,.d) 4210 East lith Avenue P. O. Box 840 Denver, Colorado 80220 Denver, Colorado 80201-0840 Mr. David Alberstein,14/159A Mr. R. O. Williams, Jr., Acting Manager GA Technologies Inc. Nuclear Production Division Post Office Box 85608 Public Service Company of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division Mr. P. F. Tomlinson, Manager Public Service Company of Colorado Quality Assurance Division P. O. Box 840 Public Service Company of Colorado Denver, Colorado 80201-0840 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Comission Mr. R. F. Walker P. O. Box 640 Public Service Company of Colorado Platteville, Colorado 00651 Post Office Box 840 Denver, Colorado 8J201-0840 Kelley, Stansfield & 0'Donnell Public Service Company Building Comitment Control Progran Room 900 Coordinator 550 15th Street Public Service Company of Colorade Denver, Colorado 80202 2420 W. 26th Ave. Suite 100-D Denver, Colorado 80211 Regional Administrator, Region IV U.S. Nuclear Regulatory Ccnrission

- 611 Ryan Plaza Drive, Suite ICCC Arlington, Texas 76011 Chairtran, Board of County Comissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1 Denver Place 999 18th Street, Suite 1300 Denver, Colorado 80202-2413

.