Application for Amend to License DPR-34,revising Decommissioning TS to Reflect Organizational Changes That Impact Membership of Decommissioning Safety Review Committee
ML20082K227
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 04/14/1995
From: Crawford A
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20082K220 List:
References
NUDOCS 9504190168
Download: ML20082K227 (3)


Text

'

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION in the Matter of the Facility Operating Ucense )

)

of

)

)

PUBUC SERVICE COMPANY OF COLORADO )

Application for Amendment to Appendix A of Facility Operating Ucense Ucense No. DPR-34 OF THE PUBUC SERVICE COMPANY OF COLORADO FOR THE FORT ST. VRAIN NUCLEAR GENERATING STATION This application for Amendment to Appendix A of Facility Operating Ucense, Ucense No. DPR-34, is submitted for NRC review and approval.

Respectfully submitted, PUBLIC SERVICE COMPANY OF COLORADO By A. Clegg Crawford Vice President Engineering & Operations Support i

Patricia T. Smith Senior Vice President and General Counsel Attorney for Applicant p$kNoobk0 k7 W

l ATTACIIMENT 1 TO P-95037

SUMMARY

OF PROPOSED CIIANGES

4 i.

j 3.

j

SUMMARY

OF PROPOSED CHANGES i

DTS SECTION

SUMMARY

OF CHANGE

\\

l 2.9, page 2-2 Revised Definition of Offsite Dose Calculation Manual to refer to I

Annual Radioactive Effluent Release Reports versus Semiannual l

Radioactive Effluent Release Reports, consistent with Section 5.5.2.

i l

3.4 Bases, Revised Applicability discussion to state that the LC is applicable

.j j

page 3.4-4 whenever there is shielding water within the PCRV, not just until all i

j Activated Graphite Blocks have been removed from the PCRV, l

consistent with the Applicability section wording.

t I

4.3, page 4.0-1 Revised the PCRV Water I2akage Prevention Design Features l

discussion to refer to the PCRV shield water system versus the PCRV l

i water cleanup and clarification system, to reflect the correct name for l

this system.

I 5.3.1, page 5.0-1 Revised Decommissioning Safety Review Committee membership to reflect PSC' organizational changes and project staffing reductions.

a

{

Deleted the Project Controls Manager, Deputy Program Director, and Westinghouse Project Director.

Revised the Facilities Support j

Manager to Radiation Protection Manager, the Decommissioning.

j Engineering Manager to Engineering Manager, and the Operations i

Manager to Operations / Maintenance Manager.

j i

j 5.3.7.b, page 5.0-4 Corrected the reference for audit reports from Specification 5.3.7 to j

Specification 5.3.6.

j 5.9.b, page 5.0-12 Corrected the reference for PCP review from Specification 5.3.6 to j

Specification 5.3.4.

{

5.10.b, page 5.0-13 Corrected the reference for ODCM review from Specification 5.3.6 I

to Specification 5.3.4.

I 5.10.c, page 5.0-13 Revised reference from Semiannual Radioactive Effluent Release i

Report to Annual Radioactive Effluent Release Report, consistent with i

Section 5.5.2.

1 5.11, page 5.0-13 Revised Natural Gas Restriction to state that FSV may be converted t

to utilize a gas-fired boiler instead of stating that FSV is being converted, to acknowledge PSC's plans to install natural gas-fired

]

combustion turbines and to allow any other FSV repowering options, i

consistent with Section 1.0.

1 i

i

.. -.. -,