ML20207F006

From kanterella
Jump to navigation Jump to search
Amend 61 to License DPR-34,deleting Requirement to Monitor Temp of Dew Point Moisture Monitors in Section 4.4
ML20207F006
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 08/05/1988
From: Calvo J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20207E997 List:
References
NUDOCS 8808180198
Download: ML20207F006 (4)


Text

i e

pn ate uq% UNITED STATES f ,

e o NUCLEAR REGULATORY COMMISSION

-l WASHINGTON, D. C. 20665

\,..../

PUBLIC SERVICE COMPANY OF COLORADO DOCKET NO. 50-267 FORT ST. VRAIN NUCLEAR GENERATING STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 61 License No. DPR-34

. 1. The Nuclear Regulatory Comission (the Comission) has found that:

A. The application for amendment by Public Service Company of Colorado (thelicensee)datedMarch 29, 1988, corplies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Comission's rules and regulations set forth in 10 CFR Chapter I; s

B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Comission; C. There is reasonable assurance: (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D. The issuance of this license amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E. The issuance of this amendrent is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied. ,

8808180198.880805 DR ADOCK 0500 g7

s a

2

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license ar.endment, andparagraph2.0.(2)ofFacilityOperatingLicenseNo. OPP-34ishereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 61, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. The license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY C0m !SSION

4. bb Jose A. Calvo, Director Pro,iect Directorate - IV Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications .

Cate of Issuance: August 5,1988

i 4

ATTACPPENT TO LICENSE AMENDMENT NO. 61 TO FACILITY OPEPATING LICENSE NO. OPR-34 ,

DOCKET NO. 50-267 Replace the following pages of the Appendix A Technical Specifications with the attached pages as indicated. The revised pages are identified by amendment number and contain vertical lines indicating the areat of change.

Remove Insert 4.4-9 4.4-9

1 i

Fort St. Vrain #1 Tecnnical Specifications

\mendment No. 50,61 Page 4.4- 9 I

NOTES FOR TABLES 4.4-1 through 4.4-4 (continued) '

(r) Separate instrumentation is provided on each circulater for this functional unit. Cnly the affected helium circulator shall be shut down within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> if the indicated requirements are not met.

(s) Deleted.

(t) A primary coolant dew point moisture monitor shall not be considered eperable unless the following conditions are met:

1) Reactor Power Range Minimum Sample Flow Startup to 2% 1 sec/sec.

> 2% - 5% 5 sec/sec.

> 5% - 20% 15 sec/sec.

>20% - 35% 30 sec/sec.

>35% - 100% 50 sec/sec.

2) Minimum flow of item 1) is alarmed in the control room and the alarm is set in accordance with the power ranges specified.
I 3) Deleted, i

l

4) Fixed ala rms of I sec/sec and 75 sec/see are operable.

<