ML20155J623

From kanterella
Jump to navigation Jump to search

Application for Amend to License DPR-34,revising Administrative Controls Section of Tech Specs
ML20155J623
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 10/14/1988
From: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20155J619 List:
References
TAC-69862, NUDOCS 8810260491
Download: ML20155J623 (7)


Text

_ _ _ _ _ _ _ _ _ __

S BEFORE THE UNITED 5T/.TES NUCLEAR-REGULATORY COMMISSION In the Matter of the Facility Operating License)

)

of )

)

PUBLIC SERVICE COMPANY.0F COLORADO )

Application for Amendment to Appendix A of Facility Operating License I License No. OPR-34 l

OF THE PUBLIC SERVICE COMPANY OF COLORADO FOR THE FORT ST. VRAIN NUCLEAR GENERATING STATION This application fer Amendment to Appendix A of Facility Operating License, license No. DPR-34, is submitted for NRC review and approval.

Respectfully submitted.

PUBLIC SERVICE COMPANY OF COLORADO By R. O. Williams, Jr.

Senica Vice President huclear Operations KELLY, STANSFIELO & 0'DONNELL James K. Tarpey Public Service Co,npany Building Denver, Colorado 80202 Attorneys for Applicant 8810260491 SG1014 DR ADOCK 05000'67 g

i I

l i.

I I

i ATTACHMENT 1 4

$UMMARY OF

! PROPOSED CHANGES

! {

I l-i f

f s

k I

q l

l l

l l

l

. - _ - ---- -- . . _ , , - _ - . _ _ _ - _ = . .

s SUKYARY OF PROPOSED CHANGES

1. Specification AC 7.1.1. is reformatted to better conform to the Stancard Tecnnical Specifications' (STS) format, revised to include the new titles of the recent Fort St.

Vrain (FSV) reoroanization. and~'TolTEws the guidance of Generic Letter $8-06 to allow deletiori of the organization charts and reference to them. Specific changes include:

Section 1- "RESPCNSIBILITY" section added delegating control room command responsibility and corporate responsiblity for overall plant i nuclear safety per STS guidelines.

Section 2a- "Onsite and Offsite Organization" section added to provide a directive '

for the establishment and definition of lines of authority, responsibility, and communication for onsite and offsite organizatiens per Generic Letter 88-06 ouidelines.

j Section 2b(1)- Designates on-duty shift ninimum shift 7.1-1 crew composition per Table following Generic Letter 88-06 guicelines. This section also

] incorporates current Section 2.a i

requirements.

t 5ections 2b(2,3,4)- Discuss licensed operator on-shift

, requirements. This section incluces part of the current clarification text following Table 7.1-1, and the i requirements of current Section 2.b.

Section 2b(S)- Discusses core alteration supervision, .

incarporating the requirements of current Section 2.c, with minor 1 editorial corrections, i

Section 2b(6)- Discusses the onsite requirements for a radiation protection cualified person, incorporating the requirements of current Section 2.d.  :

i 1

d i

s l

Section 2b(7)& ,

Fire Brigade Note- Discuss the site . Fire Brigade, incorporating the requirements of current Section 2.e and its Note, with minor editorial corrections.

Sections 2b(8, 8a  :

through 8d)- Discuss staff working hours, incorporating the requirements of current Sections 2.1 and 2.i(1 through

4), with minor editorial corrections.

Section 2b(9)- Discusses deviation of working hour  !

guidelines, incorporating the requirements of the paragraph l r

following currant Section 2.i(4), and the position titles of the FSV reorganization, i Section 2b(10)- Section added to delineate those requiring a Senior Reactor Operator's (SRO) license and those requiring a  !

Reactor Operator's (RO) license per l j the guidelines of Generte Letter 88- l j 06, Section 6.2.2.g. -

l Section 2b(11)- Discusses shift crew composition,  !

Jl incorporating, with minor editorial l

] corrections, the raquirements of the j current final clarification paragraph following Table 7.1-1, which were not ,

j included in the proposed Sections 2.b(2,3,4).  ;

Section 2b(12)- Added to delineate control rocm i command responsibility in the absence l of the Shift Supervisor, and further  ;

l expounds on proposed Section 1.b.

1 I

Table 7.1 Placed within Specification AC 7.1.1 .

4 following Section 2. Editorial  !

corrections are made to conform with '

this proposed atendment's formatting.

Section 3- "TECHNICAL ADVISORS" section is added i and centrali:es ciscussion of the I function, responsibilities, and '

autnority of the Technical Advisors.

This section incorporates the require ents of current Sections 1.c ,

and 2.f. Revisions are made in formatting, and position titles due to '

the FSV reorganization.

i t

l m . _ _ , _ - -- _ - - . . - , - - . -___.--

Section 4- "UNIT STAFF QUALIFICATIONS" section is i added and discusses staffing and

) qualification requirements; and incorporates the requirements of current Sections 29 and 2.h, with editorial corrections.

Section S- "TRAINING" section was reformatted as Section 5 and contains editorial corrections. This section incorporates requirements of current ,

Section 3. ,

i e

l 1 .

1  !

i I

j 1 i l .

i 1 ,

l k I I

i  !

}  !

i j l,

4 II. Specification AC 7.1.2 is revised as follows:

Section 1- The Plant Operations Review Committee (PORC) "Membersnip" section is revised to incorporate position titles of the FSV reorganization:

-Current Technical / Administrative Services Manager is replaced by the Nuclear Support Manager;

-Current Support Services Menager is ,

replaced by the Superintendent of '

Chemistry and Radiation Protection 4

(Radiation Protection Manager);

-Current Superintendent of Maintenanco  !

15 replaced by the Maintenance ,

Department Manager; '

-Current Superintendent of Nuclear ,

Betterment Engineering and Superintendent of Technical Services .

Engineering are replaced by the '

Systems Engineering Manager; -

-Current Results Engineering l Supervisor is replaced by the Superintendent of Instrumentation and r Controls (I&C) Maintenance; i i

, -The new position of Operations  !

j Manager is created by the t

] reorgani:ation; and the current l l position of Administrative Shift i Supervisor is deleted by the reorgani:ation.

Sections Sa, Se, l 6d, and /- These sections are revised to ,

incorporate new position titles of the l FSV reorganization.

Section Sk- PORC "Review of every unplsnned onsite release of radioactive material to the  !

i environs...," is celeted. This

) requiretent is adequately covered in  ;

Sections 5.a through 5.g. ,

1 ,

! l d

i .

I III. Soecification AC 7.1.3. is revised as follows:

Section 1- Formatting changes only are made.

Section 2- The Nuclear Facility Safety Committee  !

(NFSC) "Membership" is revised to ,

incorporate new position titles of the FSV reorganization.  !

! Sections 3,4,  ;

and 9- "Vice President, Nuclear Operatiens"

< is revised to be "Senior Vice President, Nuclear Operations".

1 l Section 10a- Revised to delete the requirement that i 1 each NFSC meeting's minutes be approved within 30 days following each ,

i neeting. i Section 10b- This section was acded and cirects the preliminary approval of the NFSC F meeting minutos by the Seifor Vice ,

President, "uclear Operations. It 2

also directs tne cistribution of the minutes to the NFSC members, and - L

approval of the minutes at the next a NFSC meeting.

J ,

Sections 10e j and 10d- Reformatted, and revised to I incorporate the new title of Senior Vice Presicent Nucleat Ooerations. .

4 IV. Paces 7.1-20 through 7.1-23 are (*eleted: I i i Pages 7.1-20 &

7.1 These pages are celeted. They contain 3 Table 7.1-1, and its associated notes

.: and clarification information. This information is new included elsewhere '

in this proposec amencment formatting, t 1 Pages 7.1-22 &  !

. 7.1 These pages contain the organi:ation  :

charts (Figures 7.1-1 and 7.1-2), anc

, are deieted follcwing the guicelines  !

1 of Generic Letter SS-06.

I j V, Specification AC 7.2 is revised as follows_: l t

5 Sections b. and c.- "Manager Nuclear Procuction" is f J revised to te "Manager, Nuclear j Production and Station Manager."

j I

! f

_. -- . - - .__ _ - _ , - . -. ,,. . . _ _ , . ,__- .