ML20043F746

From kanterella
Jump to navigation Jump to search
Application for Amend to License DPR-34,revising Physical Security Plan to Reflect Permanent Shutdown of Facility & Plant Conditions During Defueling.Encls Withheld (Ref 10CFR73.21)
ML20043F746
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 06/06/1990
From: Crawford A
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
P-90182, NUDOCS 9006180070
Download: ML20043F746 (2)


Text

e --

SAFEGUARDS  !

  • r *.

INFORMATION. t m ";. " a b .

  • M Public Service' P.O. Box EA0 Denver CO 8mi OMO i

.b A. Clegg Crawford -(

Vice President Nuclear Operations June 6, 1990 Fort St. Vrain  :

Unit No. I l P-90182 e .

V. S. Nuclear Regulatory Commission 1 ATTN: Document Control Desk Washington, D'C.. -20555 Docket No.'S0-267

SUBJECT:

Application for Amendment to the Physical Security Plan i

Dear Sirs:

L, o

In accordance with the- provisions of 10CFR50.90, Public Service Company is requesting an amendment to Facility Operating License No. 3 DPR-34 for the Fort Stc Vrain Nuclear Generating Station by way of an'

, .. amendment to the Physical Security Plan. This submittal- includes '

proposed changes to the Physical Security Plan which reflect the permanent shutdown of Fort St. Vrain and 1 plant conditions during -

defueling. j Revision 24 of the- Fort' St. Vrain Physical Secur.ity. Plan with >

Appendix ~ "B", " Security Training and Qualification Plan", and i Appendh "C", " Safeguards' Contingency Plan" are submitted as  :

Attachments 3,_4 and 5 to this letter for review and approval as the- l operational Security Plan for' Fort St. Vrain. The implementation '

schedule 1for these changes is documented under Attachment 1 to this letter. Explanations of all changes-are documented under Attachment 2'to this letter. j Appendix "A", " Security Plan for the Protection, Receipt and Storage

of Special Nuclear Material and Special Security Measures During Refueling Operations", will be deleted upon approval of this submittal and has not been enclosed. This deletion is the result of the removal from the Fort St. Vrain Protected Area of all nonself-protecting Strategic Special Nuclear Material.

This information contains Safeguards Information as defined by 10CFR73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, this material, with the exception of this

(,)fj ,

letter, should not be placed in the Public Documents Room. I L

  1. ,,wa m m w  % EGUARDS suaosuas cowratNs SANARDS INF0WADON df UPON SEPARATION THIS 4 826$moockoE  %%' V INFORMATION goo 70900606.,f vaos is escowraouzo

'% _ .. _ , a-

- SAFEEOARDS o.l '. INFORMATION-P-90182'-

c Page 2-June;6, 1990 Should you have 'any questions, please contact Mr. M.H. Holmes at

,(3L3) 480-6960.

Since ely,

(/

A. Clegg Crawford-Vice Pres _ident, Nuclear Operations ACC:BJB/dak Attachments:

1 Implementation Schedule for Revision 24 of the Fort St. Vrain -

Physical Security Plan 2 Table of Changes to the Fort St. Vrain Physical Security Plan (Revision 24) 3 Fort St. Vrain Physical Security Plan (Revision 24)

-4 Appendix ."B", " Security Training and Qualification Plan", Fort St. Vrain Physical Security Plan (Revision 24) 5 Appendix "C",. " Safeguards Contingency Plan", Fort St. Vrain Physical Security Plan (Revision 24) cc: Regional Administrator, Region'IV (2 copies)

Attn: Mr. J.B. Baird Technical Assistant i Division of Reactor Projects 1

ENCLOSURE CONTAINS SAFEGUARDS SAFEGUARDS NORMAEN INFORMATlON EA$is'oE^oEEoS i