ML20153F704

From kanterella
Revision as of 16:20, 10 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to Re Suspension of Participation in Requalification Program of Jr Eichenberger,Docket 55-40708. Advises That Eichenberger Shall Not Direct Activities of Licensed Operators & Shall Not Manipulate Controls of Plant
ML20153F704
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 09/22/1998
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
References
NUDOCS 9809290208
Download: ML20153F704 (3)


Text

P_ :y f

A S Mitg

  1. g UNITED STATES f -g NUCLEAR REGULATORY COMMISSION j- 4D j REGION IV
e. g 611 RYAN PLAZA DRIVE. SUITE 400 ARUNGToN, TEXAS 76011 8064 g ***** ,.d SEP 2 21998 C. Randy Hutchinson, Vice President

' Operations -

Arkansas Nuclear One Entergy Operations, Inc.

1448 S.R. 333 Russellville, Arkansas 72801-0967

SUBJECT:

' ALTERNATE REQUALIFICATION PROGRAM FOR DETAILED SENIOR REACTOR OPERATOR

Dear Mr. Hutchinson:

- This is in response to your letter dated September 1,1998,1CAN099801, concerning L

suspension of participation in the requalification program of John R. Eichenberger, NRC License No. SOP-43611-1, Docket No. 55-40708.

It is our understanding that Mr. Eichenberger will not participate in the Arkansas Nuclear One, Unit 1, Licensed Operator Requalification Program due to his involvement with the Institute of Nuclear Power Operations (INPO), which is not to exceed 24 months. It is also our understanding that Mr. Eichenberger will be enrolled in an Accelerated Requalification Program,

[ considered additional training in accordance with 10 CFR 55.59(b)] as described in your letter, will be required to pass a comprehensive requalification examination meeting the requirements

- of 10 CFR 55.59, and will meet the requirements of 10 CFR 55.53(f) (1 and 2),10 CFR 55.21,.

10 CFR 55.23, and 10 CFR 26 prior to retuming to licensed duties.

We require that, before Mr. Eichenberger returns to licensed duties, you certify, in writing, to the Region IV office that Mr. Eichenberger has successfully completed the Accelerated Arkansas Nuclear One, Unit 1, Licensed Operator Requalfication Program requirements in accordance with 10 CFR 55.59(b).

Please be advised that since Mr. Eichenberger will not participate in the Arkansas Nuclear One [

Requalification Program, Mr. Eichenberger shall not direct activities of licensed operators and  ;

shall not manipulate the controls of Arkansas Nuclear One, Unit 1, during this period of I A

involvement with INPO. His license has been amended accordingly. V If you have any questions, please contact John L. Pellet at (817) 860-8159.

Sincerely, 9809290208 980922 t

( )

PDR ADOCK 05000313( L& A g

V PDR p } g I l

25ON3 M Arthur T. Howell111, Director

< l Division of Reactor Safety Docket Nos.: 50-313 50-368 License Nos.: DPR-51 i NPF-6

]

I

_ i

cy-1

/ t Entergy Operations, Inc. '  !

i.

Enclosure:

Amended License for John R. Eichenberger cc w/ enclosure: i E ' Sherrie Cotton, Training Manager Arkansas Nuclear One Entergy Operations, Inc.-

1448 S.R. 333

- cc w/o enclosure:

Executive Vice President

& Chief Operating Officer

~ Entergy Operations, Inc.  ;

P.O. Box 31995 -

^ Jackson, Mississippi 39286-1995 3 Vice President-Operations Support

' Entergy Operations, Inc.

' P.O. Box 31995 :

Jackson, Mississippi 39286.

Manager, Washington Nuclear Operations ABB Combustion Engineering Nuclear

. Power-12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852'.

County Judge of Pope County

' Pope County Courthouse l Russellville, Arkansas 72801 Winston & Strawn 1400 L Street, N.W.

Washington, D.C.;20005-3502 David D. Snellings, Jr., Director -

Division of Radiation Control and

= Emergency Management Arkansas Department of Health

' 4815 West Markham Street, Mail Slot 30 Little Rock, Arkansas 72205-3867 l

Manager Rockville Nuclear Licensing Framatome Technologies 1700 Rockville Pike, Suite 525 Rockville, Maryland: 20852 -

y

- Entergy Operations, Inc.' ' bec w/o. enclosure to DCB (IE42) bec w/o enclosure: '

DRP Branch Chief

Resident inspector R. Gallo, HOLB (OWFN 9-D-24)

. W. Reckley, NRR (OWFN 13-G-8) .

RIV File -

E. Merschoff, RA L. Hurley I G

DOCUMENT NAME: P:\EICHENB.ANO To receive copy of document, Indicate in box:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy L

RIV:OB:LA , N C:OB A/ D:DRSRM , I LAHyrley /d.#s JLPellet # ATHovTGf%

09/ M98 dpF 09tY/98 ' " 09 ef/98 Il / /98 / /98

' ' OFFICIAL RECORD COPY t