ML20154E382

From kanterella
Revision as of 09:13, 10 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards bi-monthly Status Rept for Georgia Tech Research Reactor Decommissioning Program for Months of Aug & Sept 1998
ML20154E382
Person / Time
Site: Neely Research Reactor
Issue date: 10/01/1998
From: Davidson J
Neely Research Reactor, ATLANTA, GA
To: Mendonca M
NRC (Affiliation Not Assigned)
References
NUDOCS 9810080164
Download: ML20154E382 (2)


Text

7 GeorgiaDmm0FewGs i

L@9Techtm@D@@y "

, ..- College of Engineering Office of the Dean -

~

' October 1,1998 Docket No. 50-160 United States Nuclear Regulatory Commission

- 11555 Rockville Pike -

Rockville, MD 20852-2738 Attention: Mr. Marvin M. Mendonca, Senior Project Manager -

Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management

' Office of Nuclear Reactor Regulation 1

Subject:

. Bi-M' onthly Status Report for August'and September 1998 Georgia Tech Research Reactor (GTRR) D&D Project

References:

1. Enclosure 2, Status Report, Georgia Tech letter dated October 6,1997
2. Georgia Tech Research Reactor NRC Amendment 12 to Facility License No. R-97

- 3. NRC Docket No. 50-160

Dear Mr. Mendonca:

Enclosed for your information is the status report for the Georgia Tech Research Reactor Decommissioning Program for the months of August and September 1998. We will continue this report on'a bi-monthly basis until such time as decommissioning activities warrant a more frequent report.

If you have any questions regarding this information, please contact our project manager, Mr. Bill Miller,

.. at 404-894-4610.

' Sincerely,-

. Narl Davidson Associate Dean -

Chair, Technical Safety Review Committee Enclosurel as stated Cc: -- Dr. G. Wayne Clough, President, Georgia Institute of Technology Members of the Technical Safety Review Committee Ms. Tammy Tuley, Georgia Tech Office of External Affairs lO a-L 9810090164 981001, , ., ,O d DR '

' )2 ADOCK 05000160 PDR College of Engineering

- Atlanta, Georgia 30332-0360 U.S.A.

PHONE 404 894 3350 h.- ,

L- .- fax 404 894 0168

A Unit of the Uniwrsity System of Georgkr An Equal Education nnd Employment Opportunity inststutism j

I

P p..- ,

b BI-MONTHLY STATUS REPORT- August and September 1998  ;

Docket No. 50-160.

Georgia Tech Research Reactor Decommissioning Program Bi-Monthly Status Report for August-September 1998 -

A. General The GTRR remains under a safe shutdown condition. The reactor facility is in compliance with its license conditions and current technical specifications (10CFR50.51(b)). i B. Activities for the Months of August and September 1998

1. The draft Decommissioning Plan, Characterization Report, and Letter of Financial Intent were submitted to USNRC on July 6,1998, and are under review.
2. A meeting took place on September 11,1998, between Georgia Tech and Ms. Glenn Carroll, representing the organization " Georgians Against Nuclear Energy (GANE)". The meeting was to share information regarding the GTRR decommissioning program. The meeting was cordial and positive. To our knowledge, there was no media coverage resulting from this meeting.  !

C. Planned Activities in October and November I

1. Respond to USNRC inquiries regarding the Decommissioning Plan.
2. Respond to potential decommissioning contractors who request information and informal ,

site visits. i

3. Begin preparation of contract documents for award of a decommissioning contract. ,

I l

i

?

l Enclosure 1 i

j

,