g 1
Georgia Institute of Technology
{
NEELY NUCLEAR RESEARCH CENTER 900 ATLANTIC DRIVE ATLANTA, GEORGIA 303324425 USA
[404)894-3600 November 18,1996 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk
Subject:
1)
Letter to NRC dated August 1995 (Inspection Response to Inspection Report 50-160/95-01) 2)
Annual Repods 1990,1991,1992,1993,1994, and 1995 Ladies and Gentlemen:
We discovered an error in the software used in the Liquid Scintillation Counter to determine concentration of tritium in liquid effluents. The program we were using included a decay factor that erroneously adjusted the counts in time back to October 1,1990. The decay factor adjustment only applies to data obtained after Oct.1,1990, and does not apply to results reported by Georgia Tech to NRC prior to Oct.1,1990.
The decay factor adjustment yielded higher concentrations of tritium than was actually measured.
The corrected tritium concentrations in liquid effluents for 1990,1991,1992,1993,1994, and 1995 are appended. These corrections only apply to tritium and nothing else.
The percent differences between the corrected and previously reported concentrations of tritium in liquid effluents for each year are listed below:
Previously Corrected Data H' Percent Difference Year Reported Data H Yearly total Release, Ci (corrected-reported)x 100 Yearly total Release, Ci corrected 4
4 1990 3.233 x 10 3.231 x 10
-0.06 1991 3.947 x 10-2 3.760 x 10'2
-4.97 4
4 1992 2.943 x 10 2.645 x 10
-11.26 4
4 1993 1.542 x 10 1.317 x 10
-17.08 i
4 1994 1.026 x 10 8.233 x 10
-24.62 4
4 1995 3.250 x 10 2.493 x 10
-30.36 Should you have any questions, please let me know.
Sincerely, l
cc: Craig Bassett h
I R.A. Karam, Ph.D.
y Director, NNRC RAK/ars
-4 Enclosure 9611260157 961118 PDR ADOCK 05000160 R
png Telex: 542507 GTRioCAATL Fax:404-853-9325 (Venty 404-894 3600) c Unit of the University System of Georgia An Equal Education and Employment opponunity Inststution