Category:CORRESPONDENCE-LETTERS
MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999 Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) ML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)1999-08-31031 August 1999 Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)1999-08-26026 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-4811999-08-25025 August 1999 Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)1999-07-29029 July 1999 Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl1999-07-28028 July 1999 Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr1999-07-28028 July 1999 Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/20001999-07-26026 July 1999 Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses 1999-09-09
[Table view] Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA
MONTHYEARML20247R3361989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) IA-89-409, Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)1989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20245J9461989-04-25025 April 1989 Partial Response to FOIA Request for Records.App B & C Records Available in Pdr.App D Documents Provided to Requestor But Not Publically Available Since Related to Oia Investigation Re Allegations by Client DD-88-18, Advises That Time for Commission to Review Director'S Decision DD-88-18 Expired.Commission Declined Review. Decison Became Final Agency Action on 881212.Served on 8812161988-12-15015 December 1988 Advises That Time for Commission to Review Director'S Decision DD-88-18 Expired.Commission Declined Review. Decison Became Final Agency Action on 881212.Served on 881216 ML20195G5361988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App a Documents.App a Documents Also Available in PDR IA-87-590, Final Response to FOIA Request.No Agency Records Subj to Request Located1987-10-0808 October 1987, 28 October 1988 Responds to Appeal of Denial of FOIA Request for Documents. Portions of Document Identified in App D Withheld (Ref FOIA Exemption 3).Forwards Nonexempt Portions, Final Response to FOIA Request.No Agency Records Subj to Request Located ML20206E6611988-10-28028 October 1988 Responds to Appeal of Denial of FOIA Request for Documents. Portions of Document Identified in App D Withheld (Ref FOIA Exemption 3).Forwards Nonexempt Portions ML20151C5181988-07-15015 July 1988 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision 88-09 Expired & Became Final Agency Action on 880712.Served on 880719 ML20196A3331988-06-17017 June 1988 Ack Receipt of 880317 Petition,Filed Per 10CFR2.206 by Addressees,On Behalf of Organizations Addressees Represent Re Delaying Commission Voting on Full Power OL for Facility Until NRC Completes Investigation of Allegations ML20195F8041988-06-15015 June 1988 First Partial Response to FOIA Request for Documents. Forwards Apps B & C Documents.Documents Available in Pdr.App a Documents Also Available in Pdr.Apps D Through G Documents Withheld (Ref FOIA Exemption 5).Releasable Portion Encl ML20151C0221988-04-0707 April 1988 Partial Response to FOIA Request for Documents.Forwards App B Documents.App a & B Documents Available in Pdr.App C Documents Completely Withheld (Ref FOIA Exemption 5) ML20151X8531988-03-22022 March 1988 Advises That Commission Regulations Do Not Authorize Appeals from 2.206 Denials,Per 880321 Appeal for NRC to Enter 48 H Housekeeping Stay of Authorization for NRC to Issue Full Power License for Unit.Appeal Denied ML20150D1511988-03-17017 March 1988 Responds to Requesting 7 Days Delay of 880321 Meeting,So Gap Can Evaluate NRC Safety Significant Assessment Team Rept.Request Denied & Gap Not Allowed to Address Commission at Meeting ML20148B2811988-03-16016 March 1988 Addresses Issues Re Mgt of fitness-for-duty Program Causing Dissatisfaction Among Workers & Competence of Workers Participating in Final Const Stages,Per .No safety-related Matters on Which Action Can Be Taken Exist ML20150C3621988-03-10010 March 1988 Ack Receipt of Requesting Explanation of NRC Investigations on Allegations Re Facility.Request Treated as Suppl to 880216 Petition & Issues Raised Will Be Addressed in Director Decision Under 10CFR2.206 ML20147H7281988-02-29029 February 1988 Ack Receipt of 880126 Petition Requesting Commission Delay Vote on Full Power OL Until Investigation of Allegations Completed & Rept Disposing Allegations Released to Public. Petition Treated Per 10CFR2.206 DD-87-20, Informs That Time Provided by NRC Regulations within Which Commission May Act to Review Director'S Decision (DD-87-20) Expired.Commission Declined Review.Decision Became Final Agency Action on 880107.Served on 8801141988-01-13013 January 1988 Informs That Time Provided by NRC Regulations within Which Commission May Act to Review Director'S Decision (DD-87-20) Expired.Commission Declined Review.Decision Became Final Agency Action on 880107.Served on 880114 ML20147C0281988-01-12012 January 1988 Final Response to FOIA Request for Documents Re Safeteam Program.Forwards App I & J Documents.App H & I Documents Available in Pdr.Other Records Available in Pdr.App J Documents Partially Withheld (Ref FOIA Exemption 6) ML20153C6021987-12-15015 December 1987 Clarifies Statement Made to Jr Pierobon & Printed in Houston Chronicle of 871204.Responses to Pierobon Question Based on Ta Rehm to B Garde ML20237C2411987-12-13013 December 1987 Responds to Requesting,On Behalf of Citizens Concerned About Nuclear Power,Inc,That Action Be Taken Re Facility.Request Denied for Reasons Stated in Encl Director'S Decision.Notice of Decision Also Encl ML20151C1961987-12-0808 December 1987 Ack Receipt of to J Calvo Re Allegations at Facility.Nrc Intends That Initial Review at Gap Will Include Exam of All Parts of Recipient Files That NRC Deems Necessary ML20151C0411987-12-0707 December 1987 Informs of Arrangements Being Made to Send Team of Qualified Individuals to Gap Ofcs in Order to Review Certain Files Re Various Allegations of Safety Defects at Plant.Related Info Encl ML20196H4511987-11-24024 November 1987 Confirms Results of 871119 Meeting Re Certain Allegations. Meeting Began by Talbling Series of Talking Points Re Objectives of Meeting & Summary of How Gap Will Handle Allegations Received ML20236L6761987-11-0909 November 1987 Ninth Partial Response to FOIA Request for Records,Including Notes of Interview of K Mcmahon.Forwards App K Documents. App K & L Documents Partially & Completely Withheld (Ref FOIA Exemptions 6 & 7,respectively) ML20151C0501987-11-0909 November 1987 Confirms 871104 Telcon Re Agreement to Set Up Meeting in Order to Provide NRC W/Info About Safety Allegations at Plant.Meeting Scheduled for 871112 ML20236D4491987-10-23023 October 1987 Partial Response to FOIA Request for Documents,Including Rd Martin 850716 Memo Re Allegation Processing Programs.Encl App E & F Documents in Pdr.App F & G Documents Partially & Completely Withheld (Ref FOIA Exemptions 5 & 6) ML20235Y7371987-10-16016 October 1987 Partial Response to FOIA Request for Records Re Decision to Issue Subpoena to Bp Garde & Decision to Seek Enforcement of Stello 870520 Subpoena in Federal Court.Forwards App a Documents.App a Documents Placed in PDR ML20236A1561987-10-14014 October 1987 Partial Response to FOIA Request for Records & Info Re NRC Investigations of Substandard &/Or Inferior Quality Bolts &/ or Fastners at Facility.App D Document Available in Pdr. Forwards App E Documents.App E Documents Also Placed in PDR ML20235K7121987-09-30030 September 1987 Final Response to FOIA Request for Documents.App I Documents Available in Pdr.App F & H Documents Being Made Available in PDR & Forwarded.Portion of App H Document & All of App G Documents Withheld (Ref FOIA Exemption 5) IA-87-587, Final Response to FOIA Request for Transcripts of Bp Garde 870727 & 0805 Depositions.Forwards App a Documents. Documents Also Available in PDR1987-09-29029 September 1987 Final Response to FOIA Request for Transcripts of Bp Garde 870727 & 0805 Depositions.Forwards App a Documents. Documents Also Available in PDR ML20235H7751987-09-29029 September 1987 Final Response to FOIA Request for Transcripts of Bp Garde 870727 & 0805 Depositions.Forwards App a Documents. Documents Also Available in PDR ML20235F8141987-09-24024 September 1987 Partial Response to FOIA Request for Documents.Forwards App B,C & D Documents.App a & B Available in Pdr.App C Documents Partially Withheld (Ref FOIA Exemption 4).App D Documents Withheld in Entirety (Ref FOIA Exemptions 5 & 6) ML20235C7731987-09-22022 September 1987 Partial Response to FOIA Request for Documents.App a Documents Available in Pdr.App B Documents Partially Withheld (Ref FOIA Exemption 5).App C Documents Completely Withheld (Ref FOIA Exemptions 2 & 5) ML20237J5931987-08-28028 August 1987 Partial Response to FOIA Request.App C Documents Encl & Also Available in Pdr.App D Records Partially & App E Records Completely Withheld (Ref FOIA Exemption 5) ML20237G5291987-08-27027 August 1987 Forwards Fr Notice of Receipt of Petition for Director'S Decision Under 10CFR2.206 Re 870529 Motion to Reopen Licensing Hearing & Suspend Fuel Loading Until Matters Discussed in Motion Resolved.Stay of Fuel Loading Denied ML20151N8901987-08-19019 August 1987 Responds to Requesting NRC to Make Available for Deposition V Stello,R Martin,B Hayes & Connelly Re Enforcement of B Garde Subpoena.Rejects Request & Informs of 870814 Us Petition to Enforce Subpoena.Petition Encl ML20235Y8751987-07-15015 July 1987 Responds to 870529 Petition Under 10CFR2.206 for Establishment of Investigative Unit Independent of NRC Region IV & Edo,To Review Allegations Re Plant.Served on 870717 ML20215M4581987-05-0808 May 1987 Final Response to FOIA Request for Documents Re Plant. Forwards Documents Listed in App B.Documents Also Available in PDR IA-87-225, Final Response to FOIA Request for Documents.App a Documents Available in PDR1987-05-0505 May 1987 Final Response to FOIA Request for Documents.App a Documents Available in PDR ML20215H8871987-05-0505 May 1987 Final Response to FOIA Request for Documents.App a Documents Available in PDR ML20209F5591987-04-28028 April 1987 Partial Response to FOIA Request for Documents Re Facility, Including Info Re Water Hammer in Component Cooling Water Sys.Forwards App a Documents.Documents Also Available in PDR ML20245A5391987-04-0808 April 1987 Responds to Re Allegations W/Significant Bearing on Safety of Plant.Full Info Re Allegations Should Be Provided within 30 Days or Steps Will Be Taken to Acquire Info by Other Means IA-88-107, Responds to Re Allegations W/Significant Bearing on Safety of Plant.Full Info Re Allegations Should Be Provided within 30 Days or Steps Will Be Taken to Acquire Info by Other Means1987-04-0808 April 1987 Responds to Re Allegations W/Significant Bearing on Safety of Plant.Full Info Re Allegations Should Be Provided within 30 Days or Steps Will Be Taken to Acquire Info by Other Means ML20207T1071987-03-19019 March 1987 Final Response to FOIA Request.App C Documents Encl & Available in Pdr.App D Documents Partially Withheld (Ref FOIA Exemption 6).App E Documents Completely Withheld (Ref FOIA Exemption 7) IA-86-885, Final Response to FOIA Request.App C Documents Encl & Available in Pdr.App D Documents Partially Withheld (Ref FOIA Exemption 6).App E Documents Completely Withheld (Ref FOIA Exemption 7)1987-03-19019 March 1987 Final Response to FOIA Request.App C Documents Encl & Available in Pdr.App D Documents Partially Withheld (Ref FOIA Exemption 6).App E Documents Completely Withheld (Ref FOIA Exemption 7) ML20211G6741987-02-18018 February 1987 Ack Receipt of Describing Plans to Investigate Allegations of About 36 Current &/Or Former Employees of Plant.Prompt Provision of Info to NRC or Util on Deficiencies Re Nuclear Safety Recommended ML20210N0841987-02-0606 February 1987 Partial Response to FOIA Request Re Transcript of J Corder 861106 Deposition & Repts from 861107 Meeting Between Corder & D Carpenter in Bay City,Tx.Forwards App a Documents.App a & B Documents Available in PDR ML20214W7151986-12-0505 December 1986 Final Response to FOIA Request.No Further Action Being Taken on 860826 Appeal Ltr.Forwards App M Documents ML20214K7091986-11-20020 November 1986 Responds to FOIA Request for Records Re Litigation Between Util & Brown & Root,Inc.Forwards App K Documents.App J Documents Already in Pdr.App L Documents Cannot Be Located ML20211E9851986-09-30030 September 1986 Partial Response to FOIA Request.Documents in Apps A-I Available in PDR 1989-09-26
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses ML20210D9011999-07-23023 July 1999 Forwards Safety Evaluation Re Inservice Testing Plan Request for Relief RR-5 Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210C2111999-07-21021 July 1999 Forwards Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626.Two Severity Level IV Violations Occurred & Being Treated as Noncited Violations ML20209H9231999-07-16016 July 1999 Discusses South Texas Project,Units 1 & 2 Updated Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity. Staff Revised Info for Plant in Rvid & Being Released as Rvid Version 2 ML20207H6261999-07-0808 July 1999 Responds to Re 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546, Alternative Requirements for Qualification of VT-2 Exam Personnel,Section Xi,Division 1.Forwards SE ML20195J6731999-06-17017 June 1999 Responds to Re Request for Relief from ASME Code, Section Xi,Requirement to Perform VT-1 Visual Exam on Accessible Surfaces of RPV Flange Inserts (Bushings). Safety Evaluation Encl ML20195F7561999-06-10010 June 1999 Forwards Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515 at South Texas Project Electric Generating Station,Units 1 & 2.No Violations Were Identified ML20207H0031999-06-0909 June 1999 Discusses 990419 Meeting in Region IV Ofc Re South Texas Project EP Program Status,Including Initiatives in EP Program,Future Revs to EP & Dept Performance Indicators. Meeting Attendance List & Licensee Presentation Encl ML20195G3241999-06-0909 June 1999 Ack Receipt of Re Changes to Plant Emergency Plan Change Notice 18-2.No Violations of 10CFR50.54(q) Were Identified ML20207D7371999-05-28028 May 1999 Discusses Re Process for Reclassification of non- Risk Significant Components.Forwards Concerns & Cautions for Consideration Based on Limited Review of Reclassification Process Overview That Was Provided IR 05000498/19980151999-05-28028 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/98-15 & 50-499/98-15.Corrective Actions Reviewed & Found to Be Responsive to Issues Raised ML20207E1961999-05-25025 May 1999 Forwards Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Primary Focus of Insp to Review Operational Status of Emergency Preparedness Program ML20207A8771999-05-25025 May 1999 Forwards RAI Re Licensee 960213 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Plant,Units 1 & 2.Response Requested within 120 Days from Date of Ltr IR 05000498/19990061999-05-12012 May 1999 Submits Corrected First Page of Cover Ltr Re Insp Repts 50-498/99-06 & 50-499/99-06 Conducted on 990221-0403.Subj Line Was Corrected ML20206S3201999-05-12012 May 1999 Forwards Corrected First Page of Cover Ltr,Which Forwarded Insp Repts 50-498/99-06 & 50-499/99-06,issued on 990505. Subj Line Indicated on NOV Was Incorrect ML20206N5481999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Ra Gramm Will Be Section Chief for South Texas Project.Organization Chart Encl ML20206J4321999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key Encl for Info.Without Encl ML20206J4211999-05-0606 May 1999 Ack Receipt of in Response to & Insp Repts 50-498/99-04 & 50-499/99-04,confirming Commitments as Stated in 990225 Exit Meeting ML20206H6201999-05-0505 May 1999 Forwards Insp Repts 50-498/99-06 & 50-499/99-06 on 990221- 0403.Three Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20206H3811999-05-0505 May 1999 Responds to STP Nuclear Operating Co Which Provided Update to TS Bases Pages B 3/4 2-6.Revised TS Bases B 3/4 2-6 That NRC Staff Will Use to Update Copy of STP Bases Encl ML20206H2001999-05-0404 May 1999 Forwards Exemption from Requirements of 10CFR50.60, Acceptance Criteria for Fracture Prevention Measures for Lightwater Nuclear Power Reactors for Normal Operation ML20206B6091999-04-22022 April 1999 Forwards Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted ML20206B3281999-04-22022 April 1999 Forwards Insp Repts 50-498/99-07 & 50-499/99-07 on 990405- 09.Insp Focused on Radiological Controls in Place During Unit Refueling Outage.Violations Identified Involving Failure to Follow Radiation Work Permit Instructions ML20205Q8151999-04-16016 April 1999 Forwards Request for Addl Info Re Proposed Amends on Operator Action for small-break-LOCA,dtd 980728.Response Requested within 45 Days of Ltr Date ML20205P5821999-04-15015 April 1999 Advises That Version of Application & Affidavit Dtd 990127, Executed by Ha Sepp,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended 1999-09-09
[Table view] |
Text
..
U.S. NUCLEAR REGULATORY COMMISSION NRc Foia nouEst NuvatRisi
, f. % ,g ,
- 'y /
Fo2A - 9,7.som234 X '^^'
es I l "'
? 1 RESPONSE TO FREEDOM OF -
' ~
INFORMATION ACT (FOIA) REQUES [,
(e eee- ,/ - .
L/ MAY 8 e DOCKET NUMBERtSi ur appM9ff S. I /5., M' M h , h PART s.-RLCdRDS RELEASED OR NOT LOCATED ISee checked bonest No agency records subrect to the request have been located.
No additonal agency records subject to the request have been located.
Agency records subrect to the request that are identifed in Appendia are already available for publH: mspecten and copeng in the NRC Public Document Room, 1717 H Street. N W., Washington, DC.
\p A
Agency records subsect to the request that are identifed in Appendin h are being macle available for public inspection and copying in the NRC Public Document T.oom 1717 H Street, N.W., Washington, DC, in a folder under this FOtA number and requester na, *a.
The nonpropretary verson of the proposaHsl that you agreed to accept in a telephone conversation with a member of my staff is now being made avadable for public inspecten and coying at the NRC Public Document Room.1717 H Street, N W., Washington, DC, e a folder under the FOIA number and requester name.
Enclosed is information on how you may obtain access to and the charges for copying records placed in the NRC Public Document Room,1717 H Street, N.W., Washington, DC.
Agency records subject to the request are enclosed. Any applicable charge for copies of the records provided and payment procedures are noted in the comments secton.
Records subject to the request have been pferred to another Federal agencybes) for review and d, rect response to v.a.
In www of NRC's response to the request, no further acton is being taken on appealletter dated PART ll.A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain informaton in the requested records is being withheld from public disclosure pursuant to the FOIA exemptons described in and for the reasons stated in Part II, sec-tions B. C, and D. Any released portons of the documents for which only part of the record is bemg withheld are being made available for public inspection and copying in the NRC Public Document Room.1717 H Street, N W., Washington, DC, in a folder under this FOIA number and requester name. -
Comments 8705130250 870508 PDR FOIA PDR BAUMAN87-216 A
SIGN JR DIRECTOR. DIVISION F RULES ECORDS
- - - -1 lM
. ( .'fA1, s
NRC FORM 4H LPan 11 Jas .
i
216 c
' APPENDIX __ B__
RECORDS MAINTAINED IN THE POR UNDER THE ABOVE REQUEST N NUMBER DATE DESCRIPTION j* 3/13/87 Station Problem Report, South Texas Project 50-498/499, OPGP03-ZA-0018-1, Report No. 87-0005 (15 pages) 2.
03/13/87 Meno to addressees from N. P. Kadambt Re:Highlight (2 pages)
Daily L
l t
l e
e I
,1 '
'I ..
i
GOVFRNMENT ACCOUNTADILITY PROJEG 1555 Connecticut Avenue N.W., Suite 202 Washington. D.C. 20036 (202)232 8550 MIDWEST OFFICE 104 E. WISCONSIN AVENUE APPLETON, WISCONSIN 54915-8605 l t
April 10, 1987 FREEDOM OF INFORMATION ACT REQUEST
[gB)0M OF INFORMAT10N Director Office of Administration U.S. Nuclear Regulatory Commission Washington, D.C. 20210 hg Qg4 TO WilOM IT MAY CONCERN g
Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C. 552, the Government Accountability Project (GAP) requests copies of any and 011 agency records and information, including but not limited to notes, lotters, memoranda, drafts, minutes, diaries, logs, calanders, tapes, transcripts, summaries, interview reports, procedures, instructions, Gngineering analyses, drawings, files, graphs, charts, maps, photographs, agreements, hadnwritten notes, studies, data sheets, notebooks, books, telephones messages, cnd any other data compilations, computations, voice recordings, computer runoffs, rcports, and any and all other recordsinterim and/or final reports, status in an auxiliary water cooling system, concerning -the "significant vibration on Wednesday, March 11, at the South Texas Project, Unit 1, 13, 1987.
A copy of the article is enclosed for your reference.1987, as rep This request includes all agency records as defined in 10 C.F.R. 9.3a(b) cnd the NRC Manual, Appendix 0211, Parts 1.A.2 and A.3 (approved October 8, 1980) investigative or other files,whether they currently exist in the NRC offical, " working" rcoidences. or at any other location, including private If cny records as defined in 10 C.P.R. 9.3a(b) and the NRC Manual, supra, cnd covered by this request have been destroyed and/or removed after this
- request, to please a list of provide all surrounding records, including but not limited all records o doscription of the action (s)w hich haverelevant taken been or are destroyed and/or to, generated removed, in connection cnd/or issued in order to implement the action (s). .s b Y
gal' requests tha t fees be waived, because " finding the information can be considered as primarily benefiting the general public," 5 U.S.C. 552 (a) (4) (a). GAP is a non profit, non-partisan public interest organization concerned with honest and open government.
Through public outreach, the Project promotes whistleblowers as agents of government accountability. Through it Enviromental Whistleblower.
Clinic, GAP offers assistance to local pubile interest and citizens groups and-intervenors in the concern for safety at nuglear power plants.
We are regnesting this information as part of an ongoing monitoring projectyof the NRC's efforts to protect public health and safety at and near nuclear processing plants and radioactive waste facilities. .
For any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the documents or portions of documents withheld. The index should provide o datalled justification of your grounds for claiming each exemption, explaining why each exemtion is relevant to the document or portion of the document withheld. This index is required under Vaughn 11 Roson (1), 484 F2d 820 (D.C. Cir. 197.3), cert. denied, 415 U.S. 977 TIlii).-
We look forward to your response to this request within ten (10) working days.
Sincerely, t7 N&.#4hf
- Linda Bauman FOIA Coordinator Midwest. Office 4
Rocponses to this request should be mailed to t 104 E. Wisconsin Avenue Appleton, Wisconsin 54915-8605 s
4
Fuel-loading STP officials probe significant vibration s * *
'possible, with the unit scheduled to go on line in December.
not likW A wataI smmeroccurs ahen steam forms inside d
- wi,ne,aisosa u ment.ib,ati wuch s hot pw id un quicu condenses back to s i' r
Ii rneoa..,olcornbe Van H "A't this poinc l understand it is possible." said knocked loose pipe holders and sent over 20 quid stat. due to a sudden reduction in r,,m.y NRC spokesman Clyde Wisner. "but not s!! that workers home late Wednesday night, was an temperatu . accordmg to STP information officer 4
operator error and was not caused by a problem David Por, er.
~
} A "sigmficant vibration"in an auxiliarv.d i will certainly be some repairs needed and some, likely. They will have to assess"Ithe .
don'tdamage.
ant to say There it's not a' with theproblem.
serious system.
! cooling ss stem Wednesday at the SouthTexas Pi retraming will be necessary." As pressure and temperature of superheated, becauseits oldbesseriousproblem-butitcould icet's Unit 1 could affect the fuelloading xhedule Since January Urut I has been undergoing hot ' pressurized steamin thecoohngsystem werebeing be a minor oblem." said Walker. Ele equated the reduced at about 11 p.m. Wednesday. a very loud problem wi i the rattle of hot waterpipes in a home
! st the facility a Nuclear llegulatory Commission function testing. a required step in the NRC beens- knocking sound referred to as a " water hammer" - but on a 'rrer scale.
j *pokesman said ioday. ing process. Fuel loadmg at Unit I is set for June occurred. said IIL&P spokesman Glen Walker.
See STP Pase 2 r h 3,1987 i
- , I f ,, ,a it
!EatagorDaMounty @ribunt
,, ,, , 4 ?>
. . . .. h. . ,= /
Bay City. Texas i STP
' Castissed from Page 1 j l Wisner said hedidn't think theincident would af- reactor was heated to 567 degrees and pressurized
- fact the status of the test because woikers "were in to 2.235 pounds per squareinch.
the process of wrappmg it up." The pipes affected by the wster hammer were in a .
Engineerssupervismgthecoolwiownphaseofthethe loop of cooling water not passing dsrectly through 5 reactor,
, hot-function test remamed at the site that night and continued wrong. Walker said. totry and figureoutwhat hadgone plant Martir 4 as the entmMatson of the test.A trial amount of electricity was gene The knocking - supposed to be caused by too. Though origineDy slated to be completed by late February, the revised test achedule would have rapidcoolingof thesteaminthepipes-continued for about 30 minutes, he said. completed the hot-function test Sunday, said Walker.
i Wisner said the vibration was tikely caused when the operator " overlooked a couple of steps." Theincident marks theescond setbackin Unit 1's l
3 Walker said the cool-down phase of the hot func. hot function tes'ing, which began Jan.10.
tion test remains on hold at 350 degrees while the in. On Jan. 27 a faulty gasket around a temperature cident remams under investigation . amid Walker. gauge caused a steam leak which was was termed a mmor problem by Central Power & Light. After the l
At the peak of the test, water passmg through the leak was repaired the tmat continued.
i
!